# Delete issue

URL: https://docs.ones.cn/developer/abilities/events/project/issue/issue-deleted

## Overview

Subscribe to `ones:project:issue:deleted` to synchronize issue deletions with an external system. The callback identifies the deleted issue and includes its name before deletion, without a full property snapshot.

Applications subscribe using `ones:project:issue:deleted` . `ones.task.deleted` is the internal event name.

## Trigger scope

- A successful issue deletion produces a deletion event after the transaction commits. Cancelling the operation, failing permission checks, or a failed deletion does not represent a successful deletion.
- Single and batch deletion use the existing deletion flow. Batch deletion runs asynchronously: request acceptance does not mean that all issues have been deleted. Interpret each notification against the final result for that issue; failed items must not be treated as deleted. The callback describes one deleted issue, not the entire batch.
- Parent, child, and related issues follow the existing deletion rules. Do not assume that all related issues are deleted together. An issue whose relationship or property changes may produce an update event; that does not mean the issue was deleted.
- This is a team-scoped event. App installation, subscription, and delivery scope checks apply. Installing an app does not grant access to events outside its applicable scope.

## Version notes

The integration context retains the customer's existing version. Earlier basic deletion checks used ONES v7.28.0; subsequent checks of the deletion UI and basic API behavior used v7.28.1. These checks do not establish successful callback delivery. Verify actual callbacks with the app installation method and deployed version used for your integration.

The earliest supported version of this event has not been confirmed. The documentation update date is not its introduction date, and these version notes do not require a customer upgrade.

## Event body

### Delete issue callback

Common callback structure and deletion-specific fields for ones:project:issue:deleted.

#### Properties

eventID * string
Event ID for duplicate detection; do not rely on its internal format.

eventType * string
Open Platform issue deletion event type.
**Enum values:** `"ones:project:issue:deleted"`

timestamp * number
Event occurrence timestamp in milliseconds.

subscriberID * string
Installation ID of the app receiving the event.

eventData * object
Deleted issue information, without a full property snapshot.
issueID * string
ID of the deleted issue.

orgID * string
Organization ID.

teamID * string
Team ID.

name * string
Issue name before deletion.

userID * string
ID of the user who triggered the deletion.

[Common callback structure](https://docs.ones.cn/developer/abilities/events/#http-body)

| Field | Type | Description |
| --- | --- | --- |
| `eventID` | string | Event ID used to detect duplicate delivery. Do not depend on its internal string format. |
| `eventType` | string | Always `ones:project:issue:deleted` . |
| `timestamp` | number | Event occurrence timestamp in milliseconds. |
| `subscriberID` | string | Installation ID of the app receiving the event. This is not the acting user's ID. |
| `eventData` | object | The five deletion-specific fields below. |

**eventData**

| Field | Type | Description |
| --- | --- | --- |
| `issueID` | string | ID of the deleted issue. |
| `orgID` | string | Organization ID. |
| `teamID` | string | Team ID. |
| `name` | string | Issue name before deletion. |
| `userID` | string | ID of the user who triggered the deletion. |

All listed fields are present; a string field being present does not guarantee a non-empty value. For this event, use `orgID` and `userID` , rather than the `organizationID` and `triggerUserID` fields in creation or update events. The payload does not include status, property changes, relationship changes, or a full issue snapshot.

## Subscription example

Merge the following fragment into your existing `opkx.json` . Preserve the other app settings and existing subscriptions, and add the deletion event to `app.events.types` . The callback path must match your app's handler. Follow [Subscribe to Events](https://docs.ones.cn/developer/guide/getting-started/app-events/) to build, update, and install the app.

opkx.json (fragment)

```json
{
  "app": {
    "events": {
      "url": "/events/webhook",
      "types": [
        {
          "eventType": "ones:project:issue:deleted"
        }
      ]
    }
  }
}
```

## Complete callback example

This is illustrative data, not a captured callback. Verify the fields against actual callback records from dedicated test issues on your deployed version.

```json
{
  "eventID": "subDemo1-1960000000000000001",
  "eventType": "ones:project:issue:deleted",
  "timestamp": 1788915600000,
  "subscriberID": "installDemo1",
  "eventData": {
    "issueID": "IssueDemo0000001",
    "orgID": "OrgDemo1",
    "teamID": "TeamDemo",
    "name": "Delete event verification issue",
    "userID": "UserDemo"
  }
}
```

## Callback handling and troubleshooting

The callback is an HTTP POST. Validate the request according to [JWT authentication](https://docs.ones.cn/developer/guide/advanced/app-security/#jwt-authentication) , and promptly return HTTP **200** or **204** on successful receipt. Use `eventID` to protect against duplicate processing so a repeated notification does not repeat synchronization side effects. Synchronize deletion using the identifiers already in the callback; do not require a successful query of an issue that has been deleted.

A non-success response, connection failure, or timeout follows the shared [event retry and app recovery mechanism](https://docs.ones.cn/developer/abilities/events/#event-retry-mechanism) . There is no additional deletion-specific delivery deadline or promise of indefinite retries.

If no callback arrives, check in this order:

1. Confirm the event name and the configuration of the app version actually installed; rebuild and update the app after changing subscriptions.
2. Check app availability and installation scope, including the organization and team applicable to the event.
3. Check the callback path, request validation, and HTTP response from the receiver.
4. Check retry and recovery status using the shared mechanism above.
During integration verification, compare single deletion, successful batch items, and mixed-success batch results with actual callbacks after the batch finishes. Include parent, child, and related issues, distinguishing deletion from update notifications. For cancellation, permission denial, and deletion failure, check the final issue state, operation requests, and event records together; a brief absence of callbacks alone is not sufficient evidence. Also verify HTTP 200/204 acknowledgements, error and timeout recovery, and duplicate handling.
