# Create issue field

URL: https://docs.ones.cn/developer/abilities/events/setting/issue-field/issue-field-created

## Requirements

| ONES |
| --- |
| v6.0.83+,v6.1.66+ |

## Event Body

### Create Issue Field Event Schema

Create issue field event structure

#### Properties

eventID * string
Unique identifier for the event

eventType * string
Type of the event
**Enum values:** `"ones:setting:issue-field:created"`

timestamp * number
Timestamp when the event occurred

subscriberID * string
ID of the subscriber

eventData * object
organizationID string
Organization that triggered the event. May be empty.

teamID string
Team that triggered the event. May be empty.

triggerUserID string
User that triggered the event. May be empty.

id * string
ID of the issue field associated with the event.

name * string
Name of the issue field associated with the event.

propertyTypeLabel * string
Type label of the issue field.
**Enum values:** `"appear_time"`
`"date"`
`"department_list"`
`"float"`
`"integer"`
`"multi_line_text"`
`"multi_option"`
`"option"`
`"project_list"`
`"sprint"`
`"stay_count"`
`"stay_time"`
`"step_range"`
`"text"`
`"time"`
`"user"`
`"user_list"`

fieldSetting FieldSetting
Settings of the issue field.

#### Definitions

##### FieldSetting

object
option OptionInfo
Valid for type of issue field which is 'option' or 'multi_option'.

stepRange StepRange
Valid for type of issue field which is 'step_range'.

appearTime FieldWithMethod
Valid for type of issue field which is 'appear_time'.

stay Field
Valid for type of issue field which is 'stay_time' or 'stay_count'.

##### OptionInfo

object
optionTotal number
Total number of the options

options array
Part of the option items (the maximum number is 1024).
Array items:
item Option

##### Option

object
id string
ID of the option.

value any
Value of the option.

##### StepRange

object
start FieldWithMethod
Start time of the issue field.

end FieldWithMethod
End time of the issue field.

##### Field

object
fieldType string
Type of the issue field.

fieldID string
ID of the issue field associated with the event.

fieldOptionID string
Option id of the issue field.

##### FieldWithMethod

object
fieldType string
Type of the issue field.

fieldID string
ID of the issue field associated with the event.

fieldOptionID string
Option id of the issue field.

method string
first_at: the first appear time，last_at: the last appear time
**Enum values:** `"first_at"`
`"last_at"`

[Common structure](https://docs.ones.cn/developer/abilities/events/#http-body)

**eventData**

| Field | Type | Description |
| --- | --- | --- |
| `organizationID` | string | Organization that triggered the event. May be empty. |
| `teamID` | string | Team that triggered the event. May be empty. |
| `triggerUserID` | string | User that triggered the event. May be empty. |
| `id` | string | ID of the issue field associated with the event. |
| `name` | string | Name of the issue field associated with the event. |
| `propertyTypeLabel` | String | Type label of the issue field. |
| `fieldSetting` | FieldSetting | Settings of the issue field. |

**propertyTypeLabel string enum**

| Enum | Description |
| --- | --- |
| `appear_time` | Appear time. |
| `date` | Date. |
| `department_list` | Multiple options department. |
| `float` | Float. |
| `integer` | Integer. |
| `multi_line_text` | Multi-line Text. |
| `multi_option` | Multiple options menu. |
| `option` | Single option menu. |
| `project_list` | Multiple options project. |
| `sprint` | Single option sprint. |
| `stay_count` | Number of stays. |
| `stay_time` | Time of stays |
| `step_range` | Interval time |
| `text` | Single-line Text. |
| `time` | Time. |
| `user` | Single option member. |
| `user_list` | Multiple options member. |

**FieldSetting**

| Field | Type | Description |
| --- | --- | --- |
| `option` | OptionInfo | Valid for type of issue field which is 'option' or 'multi_option'. |
| `stepRange` | StepRange | Valid for type of issue field which is 'step_range'. |
| `appearTime` | FieldWithMethod | Valid for type of issue field which is 'appear_time'. |
| `stay` | Field | Valid for type of issue field which is 'stay_time' or 'stay_count'. |

**OptionInfo**

| Field | Type | Description |
| --- | --- | --- |
| `optionTotal` | number | Total number of the options |
| `options` | Option[] | Part of the option items (the maximum number is 1024). |

**Option**

| Field | Type | Description |
| --- | --- | --- |
| `id` | string | ID of the option. |
| `value` | any | Value of the option. |

**StepRange**

| Field | Type | Description |
| --- | --- | --- |
| `start` | FieldWithMethod | Start time of the issue field. |
| `end` | FieldWithMethod | End time of the issue field. |

**Field**

| Field | Type | Description |
| --- | --- | --- |
| `fieldType` | string | Type of the issue field. |
| `fieldID` | string | ID of the issue field associated with the event. |
| `fieldOptionID` | string | Option id of the issue field. |

**FieldWithMethod**

| Field | Type | Description |
| --- | --- | --- |
| `fieldType` | string | Type of the issue field. |
| `fieldID` | string | ID of the issue field associated with the event. |
| `fieldOptionID` | string | Option id of the issue field. |
| `method` | string | first_at: the first appear time，last_at: the last appear time |

## Example

```json
{
  "eventType": "ones:setting:issue-field:created",
  "eventID": "Re6FSci9-1773166207945625601",
  "timestamp": "1709005723000",
  "eventData": {
    "organizationID": "mkobhu1u",
    "teamID": "wsxcdejk",
    "triggerUserID": "tgbvfr34",
    "id": "U1wWJ5cU",
    "name": "Name of the issue associated with the event.",
    "propertyTypeLabel": "option",
    "fieldSetting": {
      "option": {
        "optionTotal": 1,
        "options": [
          {
            "id": "je6FSci9",
            "value": "value"
          }
        ]
      },
      "stepRange": {
        "start": {
          "fieldType": 1,
          "fieldID": "je6FS3sk",
          "fieldOptionID": "S2sk2e6F",
          "method": "first_at"
        },
        "end": {
          "fieldType": 1,
          "fieldID": "je6FS4sk",
          "fieldOptionID": "S2sk2e7F",
          "method": "last_at"
        }
      },
      "appearTime": {
        "fieldID": "je6FS5sk",
        "fieldOptionID": "S2sk2e8F",
        "method": "first_at"
      },
      "stay": {
        "fieldType": 1,
        "fieldID": "je6FS6sk",
        "fieldOptionID": "S2sk2e9F"
      }
    }
  },
  "subscriberID": "Re6FSci9"
}
```
