# Update issue field

URL: https://docs.ones.cn/developer/abilities/events/setting/issue-field/issue-field-updated

## Requirements

| ONES |
| --- |
| v6.0.83+,v6.1.66+ |

## Event Body

### Update Issue Field Event Schema

Update issue field event structure

#### Properties

eventID * string
Unique identifier for the event

eventType * string
Type of the event
**Enum values:** `"ones:setting:issue-field:updated"`

timestamp * number
Timestamp when the event occurred

subscriberID * string
ID of the subscriber

eventData * object
organizationID string
Organization that triggered the event. May be empty.

teamID string
Team that triggered the event. May be empty.

triggerUserID string
User that triggered the event. May be empty.

id * string
ID of the issue field associated with the event.

propertyTypeLabel * string
Type label of the issue field.
**Enum values:** `"appear_time"`
`"date"`
`"department_list"`
`"float"`
`"integer"`
`"multi_line_text"`
`"multi_option"`
`"option"`
`"project_list"`
`"sprint"`
`"stay_count"`
`"stay_time"`
`"step_range"`
`"text"`
`"time"`
`"user"`
`"user_list"`

basicInfoChanges BasicInfoChanges
Basic information change of the issue field.

options object
Option changes which are valid for 'option' or 'multi_option' type of the issue field.
Additional properties:
* Option

stepRange StepRange
Step range change, which is valid for 'step_range' type of the issue field.

appearTime FieldWithMethodChange
Appear time change, which is valid for 'step_range' type of the issue field.

stay FieldChange
Stay change, which is valid for 'stay_time' or 'stay_count' type of the issue field.

#### Definitions

##### BasicInfoChanges

object
name Name

##### Name

object
oldValue string
Old name of the issue field associated with the event.

newValue string
New name of the issue field associated with the event.

##### Option

object
oldValue string
Original option value of the issue field.

newValue string
New option value of the issue field.

##### StepRange

object
start FieldWithMethodChange
Start time change of the issue field.

end FieldWithMethodChange
End time change of the issue field.

##### FieldWithMethodChange

object
oldValue FieldWithMethod
Original value of the issue field.

newValue FieldWithMethod
New value of the issue field.

##### FieldWithMethod

object
fieldType string
Type of the issue field.

fieldID string
ID of the issue field associated with the event.

fieldOptionID string
Option id of the issue field.

method string
first_at: the first appear time，last_at: the last appear time
**Enum values:** `"first_at"`
`"last_at"`

##### FieldChange

object
oldValue Field
Original value of the issue field.

newValue Field
New value of the issue field.

##### Field

object
fieldType string
Type of the issue field.

fieldID string
ID of the issue field associated with the event.

fieldOptionID string
Option id of the issue field.

[Common structure](https://docs.ones.cn/developer/abilities/events/#http-body)

**eventData**

| Field | Type | Description |
| --- | --- | --- |
| `organizationID` | string | Organization that triggered the event. May be empty. |
| `teamID` | string | Team that triggered the event. May be empty. |
| `triggerUserID` | string | User that triggered the event. May be empty. |
| `id` | string | ID of the issue field associated with the event. |
| `propertyTypeLabel` | string | Type label of the issue field. |
| `basicInfoChanges` | BasicInfoChanges | Basic information change of the issue field. |
| `options` | `Map<string, Option>` | Option changes which are valid for 'option' or 'multi_option' type of the issue field. |
| `stepRange` | StepRange | Step range change, which is valid for 'step_range' type of the issue field. |
| `appearTime` | FieldWithMethodChange | Appear time change, which is valid for 'step_range' type of the issue field. |
| `stay` | FieldChange | Stay change, which is valid for 'stay_time' or 'stay_count' type of the issue field. |

**propertyTypeLabel string enum**

| Enum | Description |
| --- | --- |
| `appear_time` | Appear time. |
| `date` | Date. |
| `department_list` | Multiple options department. |
| `float` | Float. |
| `integer` | Integer. |
| `multi_line_text` | Multi-line Text. |
| `multi_option` | Multiple options menu. |
| `option` | Single option menu. |
| `project_list` | Multiple options project. |
| `sprint` | Single option sprint. |
| `stay_count` | Number of stays. |
| `stay_time` | Time of stays |
| `step_range` | Interval time |
| `text` | Single-line Text. |
| `time` | Time. |
| `user` | Single option member. |
| `user_list` | Multiple options member. |

**BasicInfoChanges**

| Field | Type | Description |
| --- | --- | --- |
| `name` | Name | Name of the issue field associated with the event. |

**Name**

| Field | Type | Description |
| --- | --- | --- |
| `oldValue` | string | Old name of the issue field associated with the event. |
| `newValue` | string | New name of the issue field associated with the event. |

**Option**

| Field | Type | Description |
| --- | --- | --- |
| `oldValue` | string | Original option value of the issue field. |
| `newValue` | string | New option value of the issue field. |

**StepRange**

| Field | Type | Description |
| --- | --- | --- |
| `start` | FieldWithMethodChange | Start time change of the issue field. |
| `end` | FieldWithMethodChange | End time change of the issue field. |

**FieldWithMethodChange**

| Field | Type | Description |
| --- | --- | --- |
| `oldValue` | FieldWithMethod | Original value of the issue field. |
| `newValue` | FieldWithMethod | New value of the issue field. |

**FieldWithMethod**

| Field | Type | Description |
| --- | --- | --- |
| `fieldType` | string | Type of the issue field. |
| `fieldID` | string | ID of the issue field associated with the event. |
| `fieldOptionID` | string | Option id of the issue field. |
| `method` | string | first_at: the first appear time，last_at: the last appear time |

**FieldChange**

| Field | Type | Description |
| --- | --- | --- |
| `oldValue` | Field | Original issue field value. |
| `newValue` | Field | New issue field value. |

**Field**

| Field | Type | Description |
| --- | --- | --- |
| `fieldType` | string | Type of the issue field. |
| `fieldID` | string | ID of the issue field associated with the event. |
| `fieldOptionID` | string | Option id of the issue field. |

## Example

```json
{
  "eventType": "ones:setting:issue-field:updated",
  "eventID": "Re6FSci9-1773166207945625601",
  "timestamp": "1709005723000",
  "eventData": {
    "organizationID": "mkobhu1u",
    "teamID": "wsxcdejk",
    "triggerUserID": "tgbvfr34",
    "id": "U1wWJ5cU",
    "propertyTypeLabel": "option",
    "basicInfoChanges": {
      "name": {
        "oldValue": "Old name",
        "newValue": "New name"
      }
    },
    "options": {
      "o1wWJ5cU": {
        "oldValue": "",
        "newValue": "New option value"
      },
      "o2wWJ5cU": {
        "oldValue": "Old option value",
        "newValue": "New option value"
      },
      "o3wWJ5cU": {
        "oldValue": "Old option value",
        "newValue": ""
      }
    },
    "stepRange": {
      "start": {
        "oldValue": {
          "fieldType": 1,
          "fieldID": "qwerasf",
          "fieldOptionID": "yuioghjk",
          "method": "first_at"
        },
        "newValue": {
          "fieldType": 1,
          "fieldID": "qwerasf",
          "fieldOptionID": "yuioghjk",
          "method": "first_at"
        }
      },
      "end": {
        "oldValue": {
          "fieldType": 1,
          "fieldID": "qwerasf",
          "fieldOptionID": "yuioghjk",
          "method": "first_at"
        },
        "newValue": {
          "fieldType": 1,
          "fieldID": "qwerasf",
          "fieldOptionID": "yuioghjk",
          "method": "first_at"
        }
      }
    },
    "appearTime": {
      "oldValue": {
        "fieldID": "qwerasf",
        "fieldOptionID": "yuioghjk",
        "method": "first_at"
      },
      "newValue": {
        "fieldID": "qwerasf",
        "fieldOptionID": "yuioghjk",
        "method": "first_at"
      }
    },
    "stay": {
      "oldValue": {
        "fieldType": 1,
        "fieldID": "qwerasf",
        "fieldOptionID": "yuioghjk"
      },
      "newValue": {
        "fieldType": 1,
        "fieldID": "qwerasf",
        "fieldOptionID": "yuioghjk"
      }
    }
  },
  "subscriberID": "Re6FSci9"
}
```
