# Extensions

URL: https://docs.ones.cn/developer/abilities/extensions

## Requirements

| ONES |
| --- |
| v6.18.0 |

## Architecture Overview

The ONES open platform achieves flexible extension of core business functions, it abstracts key business processes into standardized **extension points** and combines decoupled contract interfaces to support dynamic loading and hot-plugging of functional modules. App developers can flexibly extend system functionalities through non-intrusive development (without modifying the system source code), thereby enabling customized enhancements for various business scenarios.

## Core Concepts

### Extension Point

Defines the interface specifications and abstract logic of standardized business processes, consisting of two parts:

- **Backend Interface Functions (funcs)** : Define the execution interfaces for the business logic of the extension point.
- **Frontend Slots** : Define the frontend page rendering containers for the extension point.
信息
For brevity, "extension point" is referred to as "extension" in the following text.

### Extension Point Provider

Implements the specific logic of an extension point. An extension point provider can be integrated via one of the following approaches:

信息
For brevity, "extension point provider" is referred to as "extension implementation" in the following text.

## Available Extensions

The ONES platform currently supports the following extension points:

### App Setting Pages

Allows applications to add custom configuration tabs in the App Center. These tabs provide dedicated interfaces for application-specific settings and configurations, accessible to application administrators.

- **Extension Name** : `appSettingPages`
- **Use Cases** : Application configuration, custom settings, admin interfaces
- **Documentation** : [App Setting Pages](https://docs.ones.cn/developer/abilities/extensions/app-setting-pages/)

### Manhour Validator

Enables custom validation logic for work hour entries, allowing organizations to implement specific business rules for time tracking.

- **Extension Name** : `manhourValidator`
- **Use Cases** : Time validation rules, approval workflows, compliance checks
- **Documentation** : [Manhour Validator](https://docs.ones.cn/developer/abilities/extensions/manhour-validator/)

### Approval Process Handler

Allows apps to configure approval handling, take over approve or reject interactions, validate operations on the backend, and render app results in the approval flow.

- **Extension Name** : `approvalProcessHandler`
- **Use Cases** : Approval rule settings, app-defined approve or reject processing, external workflow coordination, and app-owned result display
- **Documentation** : [Approval Process Handler](https://docs.ones.cn/developer/abilities/extensions/approval-process-handler/)
