# Approval Process Handler

URL: https://docs.ones.cn/developer/abilities/extensions/approval-process-handler

## Overview

The Approval Process Handler extension lets an app participate in an ONES approval workflow without replacing the ONES approval engine.

An app can participate at three points:

1. Render app-specific settings in the **More Settings** step of an approval rule.
2. Replace the standard opinion popover when an approver clicks **Approve** or **Reject** .
3. Render app-owned results in an extra column of the approval flow.
The extension name is:

```text
approvalProcessHandler
```

The app owns data such as signatures, external transaction IDs, attachments, and app workflow state. ONES continues to own approval opinions, approval status, and node progression.

信息
This document uses an App 2.0 app created with ONES CLI and packaged as an `.opkx` file. "Host" means the ONES page or service that loads the extension and continues the standard approval operation.

## Requirements

| ONES |
| --- |
| v7.22.0+ |

## Use Cases

The extension does not prescribe a specific business process. An app can participate wherever an approval rule needs additional configuration, an approve or reject action needs app-defined processing, or an approval flow needs to display app-owned results.

Typical uses include:

- Add app-specific settings to an approval rule.
- Run additional business processing before an approve or reject operation is submitted.
- Coordinate approval operations with an external workflow or business system.
- Collect and validate additional information from an approver.
- Display app-owned processing results or links in the approval flow.

## Capability Boundaries

- One approval rule can bind at most one Approval Process Handler provider.
- Apps can take over only `approve` and `reject` .
- Add approver, transfer, and revoke continue to use the standard ONES flow.
- Single-item and batch approval use the same operation takeover slot.
- Frontend slots are available on Web only. Mobile and H5 are not supported in this version.
- The app must finish in a popup on the current approval page and call `onSubmit` from the current slot context.
- Page navigation, new-window recovery, URL state recovery, and asynchronous callbacks that advance approval are not supported.
- The app must not call an internal ONES approval endpoint directly. It continues approval through the host-provided `onSubmit` callback.

## How It Works

## Responsibilities

| Stage | ONES | App |
| --- | --- | --- |
| Provider discovery | Finds enabled providers in the current organization | Declares display name, supported actions, and column width |
| Rule settings | Loads the settings slot and versions its value with the rule | Renders settings and returns complete values through `onChange` |
| Operation takeover | Keeps the standard buttons and passes operation context | Renders the complete interaction and performs app business logic |
| Approval submission | Continues standard approval through `onSubmit` | Does not call internal approval APIs |
| Server validation | Calls `validate` before writing the approval operation | Confirms the app workflow is complete or blocks the operation |
| Flow display | Provides an extra cell and stable row identity | Loads and renders app-owned results |

Recommended data ownership:

| Data | Authoritative storage |
| --- | --- |
| Approval opinion, status, and nodes | ONES |
| App rule `settings` | Saved with the ONES approval rule version |
| Signature, attachment, external ID, and app processing state | App backend |
| Flow extra-column data | App backend |

注意
Do not use browser `localStorage` or `sessionStorage` as the authoritative store. Initiators, other approvers, and users on other devices must see the same result.

## Declare the Extension

Declare `approvalProcessHandler` under `app.extensions` in `opkx.json` :

opkx.json

```json
{
  "app": {
    "extensions": {
      "approvalProcessHandler": [
        {
          "key": "complianceApproval",
          "slots": {
            "ones:approval:rule-plugin-settings": "/web/pages/approval-rule-settings.html",
            "ones:approval:operation-takeover": "/web/pages/approval-operation.html",
            "ones:approval:flow-row-extra": "/web/pages/approval-flow-extra.html"
          },
          "funcs": {
            "validate": "/approval/validate"
          },
          "config": {
            "displayName": "Compliance approval",
            "supportedActions": ["approve", "reject"],
            "flowColumnWidth": 120
          }
        }
      ]
    }
  }
}
```

The same provider declares all three frontend slots and the `validate` function. Once an approval rule binds the provider, ONES uses that provider for rule settings, operation takeover, flow display, and backend validation.

`approvalProcessHandler` is discovered at organization scope ( `OrgScope` ). The provider becomes available to approval rules after the App 2.0 app is installed and enabled for the organization. `OrgScope` describes provider registration and discovery; it is not a separate package format.

### Provider Fields

| Field | Type | Required | Description |
| --- | --- | --- | --- |
| `key` | string | Yes | Unique provider key within the app |
| `slots` | object | Yes | Paths for the three approval frontend slots |
| `funcs.validate` | string | Yes | App backend validation endpoint |
| `config.displayName` | string | Yes | Provider name shown in approval rule settings |
| `config.supportedActions` | string[] | Yes | Operations the provider can handle |
| `config.flowColumnWidth` | integer | No | Extra-column width in pixels |

### Provider Constraints

- `displayName` must contain non-whitespace content and must not exceed 80 characters.
- `supportedActions` must contain at least one unique value. Only `approve` and `reject` are allowed.
- `flowColumnWidth` defaults to `100` . When specified, it must be an integer from `80` through `160` .
- Provider configuration is visible to both frontend and backend code. Do not store secrets, certificates, or access tokens in it.
- The provider identity is derived from `key` . Do not change it after publishing if existing rules must continue to find the same provider.

## Shared Types

The following public types can be placed in a shared frontend type file:

web/shared/approval-extension-types.ts

```ts
export type ApprovalPluginAction = 'approve' | 'reject'

export interface ApprovalRulePluginSettingsValue {
  enabledActions: ApprovalPluginAction[]
  settings: Record<string, unknown>
}

export interface ApprovalRulePluginSettingsContext {
  mode: 'create' | 'edit' | 'copy'
  supportedActions: ApprovalPluginAction[]
  value: ApprovalRulePluginSettingsValue
  onChange(value: ApprovalRulePluginSettingsValue): Promise<void>
  onInit(config: { validate?: () => Promise<void> }): void
}

export interface ApprovalOperationTarget {
  approvalUUID: string
  nodeUUID: string
  opinionUUID: string
  ruleUUID: string
  ruleVersion: number
}

export interface ApprovalOperationSubmitResult {
  succeededApprovalUUIDs: string[]
  failedApprovalUUIDs: string[]
}

export interface ApprovalOperationTakeoverContext {
  action: ApprovalPluginAction
  commentRequired: boolean
  settings: Record<string, unknown>
  approvals: ApprovalOperationTarget[]
  onSubmit(value: { comment?: string }): Promise<ApprovalOperationSubmitResult>
  onCancel(): void
}

export type ApprovalFlowRowType =
  | 'submit'
  | 'opinion'
  | 'pending-users'
  | 'cc'
  | 'execute'
  | 'revoke'

export interface ApprovalFlowRowExtraContext {
  settings: Record<string, unknown>
  approvalUUID: string
  row: {
    rowType: ApprovalFlowRowType
    nodeUUID?: string
    opinionUUID?: string
  }
}
```

## Get Slot Context

All three frontend pages obtain host context through `@ones-open/web-sdk` . The following helper uses the public Promise API:

web/shared/mount-extension-page.tsx

```tsx
import { ONES } from '@ones-open/web-sdk'
import type { ReactElement } from 'react'
import ReactDOM from 'react-dom'

export async function mountExtensionPage<Context>(
  render: (context: Context) => ReactElement,
): Promise<void> {
  const root = document.getElementById('root')
  if (!root) throw new Error('App root is missing')

  const context = await ONES.getExtensionContext<Context>()
  document.querySelector('.ones-app-loading')?.remove()
  ReactDOM.render(render(context), root)
}
```

Each approval slot uses one context during its current mount. The host destroys the slot when the page or popup closes.

## Rule Settings Slot

Slot name:

```text
ones:approval:rule-plugin-settings
```

This slot appears in the **More Settings** step of the approval rule editor. It selects the actions handled by the current rule and saves app-specific settings.

### Context

| Field | Type | Description |
| --- | --- | --- |
| `mode` | `create \| edit \| copy` | Rule editor entry mode |
| `supportedActions` | `ApprovalPluginAction[]` | Maximum set declared by the provider |
| `value.enabledActions` | `ApprovalPluginAction[]` | Actions enabled for the current rule |
| `value.settings` | object | App settings saved with the rule |
| `onChange` | function | Passes a complete new value to the host |
| `onInit` | function | Registers an optional rule-settings validator |

`mode` identifies how the current rule editor was opened:

- `create` : A new approval rule is being created.
- `edit` : An existing approval rule is being edited.
- `copy` : A new rule is being created from a copied rule. `value` can contain settings copied from the source rule. Regenerate or remove app-side resource references that must not be shared by the source and copied rules.
The mode provides context only. Always initialize the UI from `value` and submit complete updates through `onChange` .

`supportedActions` and `enabledActions` are different:

- `supportedActions` comes from static provider configuration.
- `enabledActions` is the subset enabled for this approval rule.
- `enabledActions: []` retains the provider settings but does not take over approve or reject.
`settings` must be a JSON object. Its serialized size must not exceed 32 KiB. ONES stores and returns it without interpreting app fields. Do not store secrets or per-approval runtime results in `settings` .

### Example

web/pages/approval-rule-settings/index.tsx

```tsx
import { useEffect, useState } from 'react'

import type {
  ApprovalPluginAction,
  ApprovalRulePluginSettingsContext,
  ApprovalRulePluginSettingsValue,
} from '../../shared/approval-extension-types'
import { mountExtensionPage } from '../../shared/mount-extension-page'

function RuleSettings({ context }: { context: ApprovalRulePluginSettingsContext }) {
  const [value, setValue] = useState(context.value)
  const [error, setError] = useState('')

  useEffect(() => {
    context.onInit({})
  }, [context])

  const updateActions = async (enabledActions: ApprovalPluginAction[]) => {
    const nextValue: ApprovalRulePluginSettingsValue = {
      enabledActions,
      settings: {
        ...value.settings,
        requireComplianceConfirmation: enabledActions.length > 0,
      },
    }

    setError('')
    try {
      await context.onChange(nextValue)
      setValue(nextValue)
    } catch (reason) {
      setError(reason instanceof Error ? reason.message : 'Failed to save settings')
    }
  }

  return (
    <div>
      {context.supportedActions.map((action) => (
        <label key={action}>
          <input
            type="checkbox"
            checked={value.enabledActions.includes(action)}
            onChange={(event) => {
              const next = event.target.checked
                ? [...value.enabledActions, action]
                : value.enabledActions.filter((item) => item !== action)
              void updateActions(next)
            }}
          />
          Handle {action}
        </label>
      ))}
      {error ? <div role="alert">{error}</div> : null}
    </div>
  )
}

void mountExtensionPage<ApprovalRulePluginSettingsContext>((context) => (
  <RuleSettings context={context} />
))
```

### `onChange`

- Send complete `enabledActions` and `settings` values on every call.
- Do not call approval rule persistence endpoints from the app.
- `enabledActions` must be a unique subset of `supportedActions` .
- Keep the current UI and show an error when `onChange` rejects.

### `onInit`

- Call `onInit({ validate })` when the app needs additional rule-settings validation.
- A successful validator resolves; a failed validator rejects with a displayable error.
- If no custom validation is needed, the app can call `onInit({})` .
- The host calls the registered validator when leaving **More Settings** and again before creating or updating the rule.

## Operation Takeover Slot

Slot name:

```text
ones:approval:operation-takeover
```

When an approver clicks an action enabled by the rule, ONES loads this slot instead of the standard opinion popover. The app renders the complete interaction, finishes its business workflow, and then calls `onSubmit` .

### Context

| Field | Type | Description |
| --- | --- | --- |
| `action` | `approve \| reject` | Operation clicked by the user |
| `commentRequired` | boolean | Whether the ONES approval opinion is required |
| `settings` | object | App settings frozen when the approval was created |
| `approvals` | `ApprovalOperationTarget[]` | Targets for a single or batch operation |
| `onSubmit` | function | Submits the standard operation through the host |
| `onCancel` | function | Closes the app interaction without changing approval state |

Single and batch operations share one contract:

- A single operation has one item in `approvals` .
- A batch operation loads the slot once with all selected targets.
- The app finishes the whole app-side workflow and calls `onSubmit` once.
Use `approvalUUID + opinionUUID` as the stable identity for an app result associated with an approval opinion. Add `action` when app business logic needs to distinguish approve and reject.

### Required Order

1. Validate app UI input.
2. Send `approvalUUID` , `opinionUUID` , and `action` to the app backend.
3. Persist an app-side state that `validate` can query.
4. After all app-side work completes, call `onSubmit({ comment })` once.
5. Use `succeededApprovalUUIDs` and `failedApprovalUUIDs` to update app state or offer retry.
The app must persist its ready state before calling `onSubmit` , because the ONES backend synchronously calls `validate` during `onSubmit` .

### Example

web/pages/approval-operation/index.tsx

```tsx
import { ONES } from '@ones-open/web-sdk'
import { useState } from 'react'

import type {
  ApprovalOperationTakeoverContext,
  ApprovalOperationTarget,
} from '../../shared/approval-extension-types'
import { mountExtensionPage } from '../../shared/mount-extension-page'

async function prepareApplicationResult(
  target: ApprovalOperationTarget,
  action: 'approve' | 'reject',
): Promise<void> {
  const response = await ONES.fetchApp('/approval-results', {
    method: 'POST',
    headers: { 'Content-Type': 'application/json' },
    body: JSON.stringify({
      approvalUUID: target.approvalUUID,
      nodeUUID: target.nodeUUID,
      opinionUUID: target.opinionUUID,
      action,
    }),
  })
  if (!response.ok) throw new Error('App processing failed')
}

function ApprovalOperation({ context }: { context: ApprovalOperationTakeoverContext }) {
  const [comment, setComment] = useState('')
  const [submitting, setSubmitting] = useState(false)
  const [error, setError] = useState('')

  const submit = async () => {
    if (submitting) return
    if (context.commentRequired && !comment.trim()) {
      setError('Enter an approval opinion')
      return
    }

    setSubmitting(true)
    setError('')
    try {
      await Promise.all(
        context.approvals.map((target) => prepareApplicationResult(target, context.action)),
      )

      const result = await context.onSubmit({ comment: comment.trim() })
      if (result.failedApprovalUUIDs.length > 0) {
        setError(`${result.failedApprovalUUIDs.length} approval items failed`)
        setSubmitting(false)
      }
    } catch (reason) {
      setError(reason instanceof Error ? reason.message : 'Approval operation failed')
      setSubmitting(false)
    }
  }

  return (
    <div role="dialog" aria-modal="true">
      <h2>{context.action === 'approve' ? 'Confirm approval' : 'Confirm rejection'}</h2>
      <p>{context.approvals.length} approval item(s)</p>
      <textarea
        value={comment}
        disabled={submitting}
        onChange={(event) => setComment(event.target.value)}
      />
      {error ? <div role="alert">{error}</div> : null}
      <button disabled={submitting} onClick={context.onCancel}>
        Cancel
      </button>
      <button disabled={submitting} onClick={() => void submit()}>
        Confirm
      </button>
    </div>
  )
}

void mountExtensionPage<ApprovalOperationTakeoverContext>((context) => (
  <ApprovalOperation context={context} />
))
```

`/approval-results` is an endpoint in the app backend, not an ONES API. `ONES.fetchApp` handles app authentication and deployment URL resolution.

### `onSubmit` Semantics

- When `commentRequired` is `true` , pass a non-empty opinion.
- `onSubmit` reuses the standard ONES parameter validation, duplicate-submit prevention, UI messages, and detail refresh.
- Do not reimplement or directly call an internal approval endpoint.
- When all items fail, `onSubmit` rejects. Keep the app interaction open and display the error.
- When all or some items succeed, `onSubmit` resolves with succeeded and failed approval UUIDs.
- Prevent duplicate clicks and do not invoke `onSubmit` concurrently in one operation session.
- `onCancel` closes the current app interaction without submitting approval.

## Backend `validate`

Function name:

```text
validate
```

`validate` prevents callers from bypassing the app frontend. When a rule and operation match the app configuration, ONES calls `validate` before the first approval write even if the caller did not use the Web slot.

The backend `validate` function differs from the rule-settings validator registered through `onInit` :

- `onInit.validate` checks whether rule settings can be saved.
- Backend `validate` checks whether the current approval operation completed the required app workflow.

### Request

```ts
interface ApprovalValidateRequest {
  team_uuid: string
  user_uuid: string
  action: 'approve' | 'reject'
  rule: {
    rule_uuid: string
    rule_version: number
    settings: Record<string, unknown>
  }
  approval: {
    approval_uuid: string
    node_uuid: string
    opinion_uuid: string
  }
  comment?: string
}
```

### Response

Return HTTP 200 with an empty object or empty body when validation passes:

```json
{}
```

Return HTTP 200 with an error when app business validation fails:

```json
{
  "error": {
    "reason": "Complete the compliance confirmation first",
    "level": "error"
  }
}
```

Response rules:

- `error.level` must be `error` .
- `error.reason` must contain non-whitespace text and must not exceed 500 characters.
- A valid JSON response without `error` , or an empty response body, passes validation.
- HTTP failure, timeout, invalid JSON, or an invalid error structure blocks the current approval item.

### NestJS Example

backend/approval-validator.ts

```ts
export interface ApprovalValidateRequest {
  team_uuid: string
  user_uuid: string
  action: 'approve' | 'reject'
  rule: {
    rule_uuid: string
    rule_version: number
    settings: Record<string, unknown>
  }
  approval: {
    approval_uuid: string
    node_uuid: string
    opinion_uuid: string
  }
  comment?: string
}

export abstract class ApprovalResultStore {
  abstract isReady(input: {
    approvalUUID: string
    opinionUUID: string
    action: 'approve' | 'reject'
  }): Promise<boolean>
}

export async function validateApprovalOperation(
  request: ApprovalValidateRequest,
  store: ApprovalResultStore,
) {
  const approvalUUID = request.approval?.approval_uuid
  const opinionUUID = request.approval?.opinion_uuid

  if (!approvalUUID || !opinionUUID) {
    return {
      error: { reason: 'Incomplete approval app context', level: 'error' as const },
    }
  }

  const ready = await store.isReady({
    approvalUUID,
    opinionUUID,
    action: request.action,
  })

  return ready
    ? {}
    : {
        error: {
          reason: 'Complete the required app operation first',
          level: 'error' as const,
        },
      }
}
```

backend/app.controller.ts

```ts
import { Body, Controller, HttpCode, Post } from '@nestjs/common'
import {
  ApprovalResultStore,
  validateApprovalOperation,
  type ApprovalValidateRequest,
} from './approval-validator'

@Controller()
export class AppController {
  constructor(private readonly approvalResultStore: ApprovalResultStore) {}

  @Post('/approval/validate')
  @HttpCode(200)
  validate(@Body() body: ApprovalValidateRequest) {
    return validateApprovalOperation(body, this.approvalResultStore)
  }
}
```

Bind `ApprovalResultStore` to the app's Entity Storage or database implementation in the NestJS module. Validation should query authoritative server-side state using `approval_uuid + opinion_uuid + action` . It must not trust a browser-provided completion flag.

### Batch Calls

The frontend loads one operation slot and calls `onSubmit` once for a batch. The ONES backend still calls `validate` once for each matching approval item:

- A failed item is blocked independently.
- Other items continue processing.
- `onSubmit` returns succeeded and failed approval UUIDs.
Keep `validate` fast, side-effect free, and idempotent.

## Flow Row Extra Slot

Slot name:

```text
ones:approval:flow-row-extra
```

When the rule has at least one `enabledActions` value and the bound provider is enabled, ONES adds an extra column after the date and loads this slot for every visible flow row. The column is present even when a particular approve or reject action is not handled. When `enabledActions` is empty, the column is hidden. The app decides what to render for each cell.

### Context

| Field | Description |
| --- | --- |
| `settings` | App settings frozen when the approval was created |
| `approvalUUID` | Current approval UUID |
| `row.rowType` | Current visible row type |
| `row.nodeUUID` | Node UUID when available for this row |
| `row.opinionUUID` | Opinion UUID for a real approval opinion row |

### Row Types

| `rowType` | Available identity | Description |
| --- | --- | --- |
| `submit` | `approvalUUID` | Approval submission row |
| `opinion` | `approvalUUID + nodeUUID + opinionUUID` | Real approval opinion row |
| `pending-users` | `approvalUUID + nodeUUID` | Pending multi-user summary row |
| `cc` | `approvalUUID + nodeUUID` | CC row |
| `execute` | `approvalUUID + nodeUUID` | Execution row |
| `revoke` | `approvalUUID` | Revocation row |

Do not assume every row has `nodeUUID` or `opinionUUID` . For signatures and receipts on a real approval opinion, query by `approvalUUID + opinionUUID` .

### Example

web/pages/approval-flow-extra/index.tsx

```tsx
import { ONES } from '@ones-open/web-sdk'
import { useEffect, useState } from 'react'

import type { ApprovalFlowRowExtraContext } from '../../shared/approval-extension-types'
import { mountExtensionPage } from '../../shared/mount-extension-page'

interface ApprovalResult {
  label: string
  detailURL?: string
}

function FlowExtra({ context }: { context: ApprovalFlowRowExtraContext }) {
  const [result, setResult] = useState<ApprovalResult>()

  useEffect(() => {
    let active = true
    const params = new URLSearchParams({
      approvalUUID: context.approvalUUID,
      rowType: context.row.rowType,
    })
    if (context.row.nodeUUID) params.set('nodeUUID', context.row.nodeUUID)
    if (context.row.opinionUUID) params.set('opinionUUID', context.row.opinionUUID)

    void ONES.fetchApp(`/approval-results?${params.toString()}`)
      .then(async (response) => {
        if (!response.ok) throw new Error('Failed to load app approval result')
        return (await response.json()) as ApprovalResult | null
      })
      .then((value) => {
        if (active && value) setResult(value)
      })
      .catch((error) => console.error(error))

    return () => {
      active = false
    }
  }, [context])

  if (!result) return null
  return result.detailURL ? (
    <a href={result.detailURL} target="_blank" rel="noreferrer">
      {result.label}
    </a>
  ) : (
    <span>{result.label}</span>
  )
}

void mountExtensionPage<ApprovalFlowRowExtraContext>((context) => <FlowExtra context={context} />)
```

### Display Rules

- The host renders the same slot with different contexts for multiple rows. Do not depend on a global "current row".
- Render no content when a row has no app result, but do not attempt to resize the cell.
- Degrade failures inside the current cell without affecting other approval detail content.
- Store results in the app backend so accounts, browsers, and devices see the same value.
- Keep the column concise. Use an app page or popup for complex details.

## Store App Business Data

Use [Hosted App Storage](https://docs.ones.cn/developer/guide/advanced/ones-hosted-app/storage/) or the app's own server-side database.

Recommended fields:

| Field | Purpose |
| --- | --- |
| `approval_uuid` | Identify the approval |
| `node_uuid` | Identify the approval node |
| `opinion_uuid` | Identify the approver opinion |
| `action` | Distinguish approve and reject when necessary |
| `status` | Indicate whether `validate` can pass |
| `result` | Store a signature reference, external ID, or other app result |
| `updated_at` | Support auditing and troubleshooting |

Use `approval_uuid + opinion_uuid + action` as a unique or idempotency key. Frontend retries and repeated `validate` calls must not create duplicate business operations.

Do not store signatures, per-approval transaction IDs, secrets, or runtime completion state in rule `settings` .

## Lifecycle and Failure Behavior

| Scenario | ONES behavior | App recommendation |
| --- | --- | --- |
| No provider is installed | Uses the standard approval flow | No action required |
| Provider is disabled or uninstalled | Retains historical rule settings, uses standard operations, and hides the extra column | Re-enable the same provider identity to restore it |
| Provider discovery fails | Blocks a configured matching operation because ONES cannot confirm that the provider was disabled; the approval detail remains readable without the extra column | Retry after provider discovery recovers |
| Enabled provider configuration is invalid | Blocks matching approve or reject operations | Fix the manifest and upgrade the app |
| Rule settings slot fails | Prevents saving a new app rule configuration | Check the slot path and frontend error |
| Operation slot fails | Blocks the operation and does not fall back to the standard opinion popover | Handle errors in the app UI |
| `validate` returns a business error | Blocks the current item | Return a clear, non-sensitive reason |
| `validate` fails, times out, or returns an invalid response | Blocks the current item | Keep validation stable and fast |
| Flow row slot fails | Degrades the current cell; other detail content remains available | Handle query and rendering errors per cell |
| Batch operation partially fails | Successful items remain successful; failed items can be retried | Use the returned UUID lists |

A disabled or uninstalled provider means the organization no longer requires that app, so ONES returns to standard approval. An enabled provider that fails is still required by the rule, so ONES does not silently bypass it.

### Runtime Matrix

| Rule binding | Provider state | Web operation | Backend operation | Flow column |
| --- | --- | --- | --- | --- |
| No binding | Any | Standard ONES flow | Standard ONES flow | Hidden |
| Binding exists, action not enabled | Enabled | Standard ONES flow | Standard ONES flow | Visible when `enabledActions` is non-empty |
| Binding exists, action enabled | Enabled and healthy | App popup, then host `onSubmit` | App `validate` , then standard ONES flow | Visible |
| Binding exists | Disabled or uninstalled | Standard ONES flow | Skips app validation and uses standard ONES flow | Hidden |
| Binding exists, action enabled | Enabled but config, operation slot, or `validate` fails | Blocked | Blocked before approval write | Visible with per-cell degradation when possible |

## Clients Other Than Web

Mobile and H5 do not load the three frontend slots in this version. Backend `validate` still runs. If a rule requires app business processing, return a business error that directs the user to complete the operation on Web.

## Security

- Authenticate and authorize every app backend endpoint.
- Do not trust browser completion flags; `validate` must query authoritative backend state.
- Avoid logging complete `settings` , approval opinions, signatures, or app responses.
- Do not include secrets, internal stack traces, or sensitive data in `error.reason` .
- Use idempotency keys for external-system calls.
- Return flow results only to users authorized to view them.

## Build and Install

After implementing the three frontend pages and backend endpoint, run:

```bash
ones build
```

ONES CLI generates an `.opkx` file. Upload it to App Center, then install and enable it for the target organization.

Verify in this order:

1. Install and enable the app.
2. Create an approval rule and select the app in **More Settings** .
3. Enable approve or reject, publish the rule, and create an approval.
4. Verify single approve and reject open the app popup.
5. Verify batch approval opens one app popup.
6. Complete app processing and confirm `onSubmit` progresses standard approval.
7. Remove the app-side ready state and confirm `validate` blocks the operation.
8. Open the approval as another account and confirm the extra-column result is identical.
9. Disable the app and confirm standard approval is restored and the extra column is hidden.
10. Re-enable the same provider and confirm existing rules can load it again.

## Checklist

- `opkx.json` declares one `approvalProcessHandler` provider.
- The provider declares all three slots and `validate` .
- `supportedActions` contains only unique `approve` or `reject` values.
- The rule settings page submits complete values through `onChange` .
- `enabledActions` is always a subset of `supportedActions` .
- Single and batch operations use the same context and call `onSubmit` once.
- App state is persisted before `onSubmit` so backend `validate` can query it.
- The app does not call an internal ONES approval endpoint.
- `validate` is side-effect free, idempotent, and distinguishes pass from block.
- Flow display queries app backend state instead of browser storage.
- Different accounts and browsers see the same app result.
- Provider disable, re-enable, slot failure, and batch partial success are tested.

## FAQ

### Why must the app use `onSubmit` ?

The host callback reuses standard ONES parameter validation, duplicate-submit prevention, UI messages, detail refresh, and future endpoint evolution. A direct internal API call would desynchronize host state and depend on a non-public contract.

### Why is backend `validate` required when the app has an operation slot?

The frontend slot controls only Web interaction. It cannot prevent a caller from invoking an approval endpoint directly. Backend `validate` checks app state before ONES writes the approval operation.

### Why must app state be saved before `onSubmit` ?

ONES synchronously calls `validate` while `onSubmit` is running. If the app saves its ready state only after `onSubmit` succeeds, validation cannot pass.

### How many times is the app called for batch approval?

The frontend slot loads once and the app calls `onSubmit` once. The ONES backend calls `validate` once for each matching approval item.

### Are rule settings updated on existing approvals?

No. Settings are versioned with the approval rule. Existing approvals keep the rule version and settings frozen when they were created.

### Can the app render only some flow rows?

ONES reserves an extra cell for every visible flow row. The app can render empty content for rows without app data, but it must handle all row types and optional UUIDs.

### Why does disabling the provider restore standard approval?

Disabling or uninstalling means the organization no longer requires the provider. ONES retains historical rule settings, hides the extra column, and uses standard approve or reject. Re-enabling the same provider identity restores loading.
