# Form Custom Control

URL: https://docs.ones.cn/developer/abilities/extensions/form-control

## Overview

This document mainly introduces how to add custom form controls to work item detail forms, create forms, and transition forms through feature extensions.

## Requirements

### Applicable Environments

- Private Deployment
- SAAS

### ONES System Version

v6.100.0+

### SDK Version

| Name | Version |
| --- | --- |
| @ones-open/web-sdk | ^1.0.1 |

## Feature Extension Configuration

### Configuration

Declare the `formControlExtension` extension in the `extension` section of your application manifest file.

```yaml
{
  base_url: 'xxx',
  extensions:
    {
      formControlExtension:
        [
          {
            key: 'validator1',
            slots: { 'ones:form:control:content': '/', 'ones:form:control:settings': '/settings' },
            config:
              {
                fieldUUIDs: ['9ax9ExKt', 'M3Fgzu3F', 'EGx9jsaH'],
                name: 'control_extension_app',
                supportForms: ['detail', 'create', 'transition'],
                controlTips: 'Control description',
              },
          },
        ],
    },
}
```

### Slot Description

| Slot Name | Description |
| --- | --- |
| ones:form:control :content | The content slot for form custom controls rendered in forms. |
| ones:form:control :settings | The settings slot for form custom controls to implement custom configuration in the form editor. If the form custom control does not need custom configuration, this slot can be omitted. |

> ps: Configure the rendering path of the slot through `slots` in the application manifest file. Only relative paths are allowed (relative to the `base_url` specified in the application manifest file). If the application uses vue-router or react-router to develop a single-page application, only history router is supported, hash router is not supported.

### config Field Description

| Field | Type | Description |
| --- | --- | --- |
| name | `string` | Form custom control name |
| fieldUUIDs | `string[]` | List of attributes included in the form custom control |
| supportForms | `"detail" \| "create" \| "transition"` | Forms supported by the form custom control. Currently, there are only three types (detail, create, transition). Currently, create must be used together with detail. |
| controlTips | `string` | Control description displayed in the form editor. This is optional. |

## Frontend Implementation

This document mainly uses the React technology stack to introduce how to implement form custom controls. You can also use other technology stacks to implement it.

### Route Definition

```tsx
import { BrowserRouter, Routes, Route } from 'react-router'

import ControlContent from './control_content'
import ControlSettings from './control_settings'

function App() {
  return (
    <div className="App">
      <BrowserRouter>
        <Routes>
          <Route path="/" element={<ControlContent />} />
          <Route path="/settings" element={<ControlSettings />} />
        </Routes>
      </BrowserRouter>
    </div>
  )
}

export default App
```

### Form Custom Control Content Slot

1. Create the entry file `control_content.tsx` for slot content rendering.

```typescript
import React, { useEffect, useState } from "react";
import { ONES } from "@ones-open/web-sdk";

const ControlContent = (props) => {
  const [context, setContext] = useState({});

  const [config, setConfig] = useState({});

  useEffect(() => {
    ONES.getExtensionContext(setContext);
    ONES.getExtensionConfig(setConfig);
  }, []);

  const {
    fields = [],
    fieldsConfig = [],
    values = {},
    onSubmit,
    onChange,
    type = "detail",
    settings = {},
    onPermissionDenied,
  } = context;

  return <div>your business logic</div>;
};

export default ControlContent;
```

1. `context` Parameter Description

| Field | Type | Description | Detail Form | Create Form | Transition Form |
| --- | --- | --- | --- | --- | --- |
| name | `string` | Form custom control name | ✅ | ✅ | ✅ |
| inEditor | `boolean` | Whether in form editor | ✅ | ✅ | ✅ |
| type | `"detail" \| "create" \| "transition"` | Current form type | ✅ | ✅ | ✅ |
| fields | `IField[]` | Attribute basic information | ✅ | ✅ | ✅ |
| fieldsConfig | `Record<string, FieldConfig>` | Attribute configuration in the form, including: visible, required, placeholder, hasPermission | ✅ | ✅ | ✅ |
| values | `Record<string, any>` | Attribute values in the form | ✅ | ✅ | ✅ |
| settings | `Record<string, any>` | Configuration of the custom control on the form | ✅ | ✅ | ✅ |
| ctx | `ControlContentExtensionContext` | Context information | ✅ | ✅ | ✅ |
| onPermissionDenied | `(fieldUUID: string) => void` | Show corresponding toast message based on fieldUUID when there is no permission. The specific logic is handled by the standard product. | ✅ |  |  |
| onInit | `(config: IControlExtensionInitConfig) => void` | Form custom control initialization configuration; if the control sets required properties internally, you can pass the validate method inside the control to the product, and the ONES will call it when submitting data |  | ✅ | ✅ |
| onSubmit | `(values: Record<string, { value: unknown; submitType?: SubmitTypeEnum }> ) => Promise<void>` | Callback for submitting data | ✅ |  |  |
| onChange | `(value: Record<string, any>) => void;` | Callback after data changes in create form/transition form |  | ✅ | ✅ |

`IControlExtensionInitConfig` Type

```typescript
export type ControlExtensionValidate = () => Promise<any>

export interface IControlExtensionInitConfig {
  validate?: ControlExtensionValidate // validate success resolve, fail reject
}
```

`ControlContentExtensionContext` Type

```typescript
export interface ControlContentExtensionContext {
  taskUUID?: string //  Task UUID, only passed for detail form and transition form,
  projectUUID?: string // Project UUID
  issueTypeUUID?: string // Work item type UUID
  taskDetailViewMode?: TaskDetailViewMode // Work item detail layout, only passed for detail form
  taskStatus?: TaskStatus // Work item status, only for detail form
  transitionUUID?: string // Transition UUID, only available for transition form
  formValues?: Record<string, any> // Form values, only available for create form and transition form
}

export enum TaskDetailViewMode {
  Wide = 'wide', // Wide detail layout
  Narrow = 'narrow', // Narrow detail layout
}
export interface TaskStatus {
  uuid: string
  category: string
  name: string
}
```

1. Process Description:

Detail Form: Call `onSubmit` and pass the data edited within the form custom control. After the ONES listens to the `onSubmit` event, it will call the update interface to update the work item attribute values with the received parameters.

Create Form and Transition Form: Call `onChange` and pass the data edited within the form custom control. After the ONES listens to the `onChange` event, it will save the received values to the form internally, and finally submit all data uniformly when clicking the confirm button.

### Form Custom Control Settings Slot

1. Create the entry file `control_settings.tsx` for slot custom configuration.

```typescript
import React, { useEffect, useState } from "react";
import { ONES } from "@ones-open/web-sdk";

const ControlSettings = (props) => {
  const [context, setContext] = useState({});
  const [config, setConfig] = useState({});

  useEffect(() => {
    ONES.getExtensionContext(setContext);
    ONES.getExtensionConfig(setConfig);
  }, []);

  return <div>your business logic</div>;
};

export default ControlSettings;
```

1. `extensionContext` Parameter Description

| Name | Type | Description |
| --- | --- | --- |
| name | `string` | Plugin name |
| type | `'detail' \| 'create' \| 'transition'` | Form type |
| fields | `IField[]` | Attribute basic information |
| value | `Record<string, any>` | Control's historically saved configuration |
| ctx | `ControlSettingsExtensionContext` | Context information |
| onChange | `(value: Record<string, any>) => Promise<void>` | Callback when control configuration changes |

`ControlSettingsExtensionContext` Type

```typescript
export interface ControlSettingsExtensionContext {
  projectUUID?: string // Project UUID
  issueTypeUUID?: string // Work item type UUID
  transitionUUID?: string // Transition UUID, only available for transition form
}
```

1. Process Description:
The application internally passes the edited data to the ONESthrough the `onChange` callback. After the ONES listens to the `onChange` event, it will save the received parameters to the form configuration. When rendering, the configuration will be read out and passed to the application using the `settings` field.
