# Manhour Validator

URL: https://docs.ones.cn/developer/abilities/extensions/manhour-validator

## Overview

The Manhour Validator extension allows applications to implement custom validation logic for work hour entries.

This extension enables organizations to enforce specific business rules, approval workflows, and compliance checks when users log their work hours in ONES.

## Requirements

| ONES |
| --- |
| v6.88.0+ |

## Use Cases

- **Business Rule Enforcement** : Validate work hours against company policies (e.g., maximum daily hours, minimum break times)
- **Project-specific Validation** : Apply different validation rules based on project type or client requirements
- **Approval Workflows** : Implement multi-level approval processes for work hour entries
- **Compliance Checks** : Ensure work hours comply with labor regulations or contractual agreements
- **Data Quality Control** : Validate the accuracy and completeness of time tracking data

## Architecture

The manhour validator extension works by intercepting work hour submission requests and applying custom validation logic before the hours are saved to the system.

## Extension Declaration

In your app's manifest file, declare the `manhourValidator` extension under the `extensions` section.

### Configuration Fields

| Field | Type | Required | Description |
| --- | --- | --- | --- |
| `key` | string | Yes | Unique identifier for this validator within the app context |
| `funcs` | object | Yes | Backend interface functions definition |
| `funcs.validate` | string | Yes | Backend endpoint path that performs the validation |

Example/manifest.json

```json
{
  "extensions": {
    "manhourValidator": [
      {
        "key": "validator1",
        "funcs": {
          "validate": "/validate_manhour"
        }
      },
      {
        "key": "validator2",
        "funcs": {
          "validate": "/validate_manhour_2"
        }
      }
    ]
  }
}
```

### Field Constraints

- **key** : Must be unique within the app, alphanumeric characters only ( `^[a-zA-Z0-9]+$` ), maximum length 64 characters
- **funcs.validate** : Valid URL path, maximum length 256 characters

## Backend Implementation

### Validation Endpoint

Implement the endpoint specified in `funcs.validate` to perform manhour validation logic.

#### Request Body

### Manhour Validator Request

Request schema for manhour validator endpoint

#### Properties

teamUUID * string
Team identifier
Min length:1

userUUID * string
User identifier who is performing the action
Min length:1

type * string
Type of manhour operation
**Enum values:** `"recorded"`
`"estimated"`
`"remaining"`

action * string
Action to perform
**Enum values:** `"add"`
`"update"`
`"delete"`

mode * string
Mode of operation
**Enum values:** `"simple"`
`"detailed"`

options object
Additional options for the operation
scene string
Scene context for the operation
Min length:1

manhour_info * array
Array of ManhourInfo objects containing the manhour data
Min items:1
Array items:
item object
task * object
Task information
UUID * string
Unique identifier of the task
Min length:1

TeamUUID * string
Team identifier the task belongs to
Min length:1

Owner * string
Task owner identifier
Min length:1

Assign * string
Task assignee identifier
Min length:1

ProjectUUID * string
Project identifier the task belongs to
Min length:1

IssueTypeUUID * string
Issue type identifier
Min length:1

ParentUUID string
Parent task identifier (for subtasks)

SubIssueTypeUUID string
Sub-issue type identifier

IsCreateTask * boolean
Whether this is creating a new task

assess_manhour object
Estimated manhour information
UUID string
Unique identifier of the estimated manhour record

From number
Start timestamp (Unix timestamp)

To number
End timestamp (Unix timestamp)

HoursFormat string
Format of hours display

IncludeNonWorkingDay number
Whether to include non-working days (0 or 1)

Hours number
Estimated hours

Owner string
Owner of the estimated hours

StartTime number
Start time (Unix timestamp)

remaining_manhour object
Remaining manhour information
UUID string
Unique identifier of the remaining manhour record

Hours number
Remaining hours

Owner string
Owner of the remaining hours

record_manhour object
Recorded manhour information
UUID string
Unique identifier of the recorded manhour record

StartTime number
Start time of work (Unix timestamp)

Description string
Work description

Hours number
Recorded hours

Owner string
Owner who recorded the hours

#### Response

**HTTP Status Codes:** always return 200 status code

### Manhour Validator Response

Response schema for manhour validator endpoint

#### One of:

##### Success Response

Empty object for successful validation
object
Empty object for successful validation

##### Error Response

Error details when validation fails
object
Error details when validation fails
error * object
Error details when validation fails
reason * string
Human-readable error message describing why validation failed, this will be shown to the user
Min length:1 Max length:500

level * string
Error level, typically 'error'
**Enum values:** `"error"`
`"warning"`
`"info"`

### Example Implementation

#### Basic Hours Validation

**Example Request:**

```json
{
  "teamUUID": "team_1234567890abcdef",
  "userUUID": "user_1234567890abcdef",
  "type": "recorded",
  "action": "add",
  "mode": "simple",
  "options": {
    "scene": "timesheet"
  },
  "manhour_info": [
    {
      "task": {
        "UUID": "task_9876543210fedcba",
        "TeamUUID": "team_1234567890abcdef",
        "Owner": "user_1234567890abcdef",
        "Assign": "user_1234567890abcdef",
        "ProjectUUID": "project_abcdef1234567890",
        "IssueTypeUUID": "issuetype_123456789",
        "ParentUUID": "",
        "SubIssueTypeUUID": "",
        "IsCreateTask": false
      },
      "assess_manhour": {},
      "remaining_manhour": {},
      "record_manhour": {
        "UUID": "",
        "StartTime": 1705305600,
        "Description": "Development work on feature X",
        "Hours": 8.5,
        "Owner": "user_1234567890abcdef"
      }
    }
  ]
}
```

**Example Response (Success) - HTTP 200:**

```json
{}
```

**Example Response (Failure) - HTTP 200:**

```json
{
  "error": {
    "reason": "Daily work hours cannot exceed 12 hours",
    "level": "error"
  }
}
```

**Validation Logic Examples:**

1. **Maximum Hours Check:**

```javascript
if (request.manhour_info[0].record_manhour.Hours > 12) {
  // Return HTTP 200 with error body
  res.status(200).json({
    error: {
      reason: "Daily work hours cannot exceed 12 hours",
      level: "error"
    }
  });
  return;
}
```
2. **Minimum Hours Check:**

```javascript
if (request.manhour_info[0].record_manhour.Hours < 0.25) {
  // Return HTTP 200 with error body
  res.status(200).json({
    error: {
      reason: "Minimum work hours must be at least 15 minutes (0.25 hours)",
      level: "error"
    }
  });
  return;
}
```
3. **Future Date Check:**

```javascript
const requestDate = new Date(request.manhour_info[0].record_manhour.StartTime * 1000);
const today = new Date();
if (requestDate > today) {
  // Return HTTP 200 with error body
  res.status(200).json({
    error: {
      reason: "Cannot log hours for future dates",
      level: "error"
    }
  });
  return;
}
```

#### Advanced Project-based Validation

**Example Request:**

```json
{
  "teamUUID": "team_1234567890abcdef",
  "userUUID": "user_1234567890abcdef",
  "type": "recorded",
  "action": "add",
  "mode": "detailed",
  "options": {
    "scene": "client_project"
  },
  "manhour_info": [
    {
      "task": {
        "UUID": "task_9876543210fedcba",
        "TeamUUID": "team_1234567890abcdef",
        "Owner": "user_1234567890abcdef",
        "Assign": "user_1234567890abcdef",
        "ProjectUUID": "project_client_work_123",
        "IssueTypeUUID": "issuetype_client_work",
        "ParentUUID": "",
        "SubIssueTypeUUID": "",
        "IsCreateTask": false
      },
      "assess_manhour": {},
      "remaining_manhour": {},
      "record_manhour": {
        "UUID": "",
        "StartTime": 1705305600,
        "Description": "Client consultation and analysis",
        "Hours": 10.0,
        "Owner": "user_1234567890abcdef"
      }
    }
  ]
}
```

**Validation Logic Examples:**

1. **Project Configuration Check:**

```javascript
const projectUUID = request.manhour_info[0].task.ProjectUUID;
const projectConfig = await getProjectConfig(projectUUID);
if (!projectConfig) {
  // Return HTTP 200 with error body
  res.status(200).json({
    error: {
      reason: "Failed to retrieve project configuration",
      level: "error"
    }
  });
  return;
}
```
2. **Project-specific Hours Limit:**

```javascript
const hours = request.manhour_info[0].record_manhour.Hours;
if (hours > projectConfig.maxDailyHours) {
  // Return HTTP 200 with error body
  res.status(200).json({
    error: {
      reason: `Project allows maximum ${projectConfig.maxDailyHours} hours per day`,
      level: "error"
    }
  });
  return;
}
```
3. **Approval Threshold Check:**

```javascript
const isManager = await isManagerUser(request.userUUID);
const hours = request.manhour_info[0].record_manhour.Hours;
if (hours > projectConfig.approvalThreshold && !isManager) {
  // Return HTTP 200 with error body
  res.status(200).json({
    error: {
      reason: "Hours exceeding threshold require manager approval",
      level: "error"
    }
  });
  return;
}
```
4. **Client Project Description Requirement:**

```javascript
const description = request.manhour_info[0].record_manhour.Description;
if (projectConfig.clientProject && !description?.trim()) {
  // Return HTTP 200 with error body
  res.status(200).json({
    error: {
      reason: "Work description is required for client projects",
      level: "error"
    }
  });
  return;
}
```
**Example Response (Success) - HTTP 200:**

```json
{}
```

## Validation Rules Examples

### Common Validation Patterns

#### 1. Daily Hours Limit

```javascript
// Validate daily total doesn't exceed limit
const userUUID = request.userUUID;
const startTime = request.manhour_info[0].record_manhour.StartTime;
const date = new Date(startTime * 1000).toISOString().split('T')[0];
const hours = request.manhour_info[0].record_manhour.Hours;
const totalHours = await getDailyHours(userUUID, date);
if (totalHours + hours > 8) {
  // Return HTTP 200 with error body
  res.status(200).json({
    error: {
      reason: "Total daily hours would exceed 8 hours limit",
      level: "error"
    }
  });
  return;
}
```

#### 2. Consecutive Days Check

```javascript
// Prevent logging hours on consecutive days off
const startTime = request.manhour_info[0].record_manhour.StartTime;
const date = new Date(startTime * 1000);
const userUUID = request.userUUID;
const isWeekend = isWeekendDate(date);
const workedPreviousWeekend = await hasWorkedPreviousWeekend(userUUID, date);
if (isWeekend && workedPreviousWeekend) {
  // Return HTTP 200 with error body
  res.status(200).json({
    error: {
      reason: "Cannot work consecutive weekends without approval",
      level: "error"
    }
  });
  return;
}
```

#### 3. Time Entry Window

```javascript
// Only allow logging hours within 7 days
const startTime = request.manhour_info[0].record_manhour.StartTime;
const requestDate = new Date(startTime * 1000);
const today = new Date();
const daysDiff = (today - requestDate) / (1000 * 60 * 60 * 24);
if (daysDiff > 7) {
  // Return HTTP 200 with error body
  res.status(200).json({
    error: {
      reason: "Cannot log hours older than 7 days",
      level: "error"
    }
  });
  return;
}
```

#### 4. User Role Validation

```javascript
// Different rules based on user role
const userUUID = request.userUUID;
const hours = request.manhour_info[0].record_manhour.Hours;
const userRole = await getUserRole(userUUID);
switch (userRole) {
  case "contractor":
    if (hours > 8) {
      // Return HTTP 200 with error body
      res.status(200).json({
        error: {
          reason: "Contractors limited to 8 hours per day",
          level: "error"
        }
      });
      return;
    }
    break;
  case "intern":
    if (hours > 6) {
      // Return HTTP 200 with error body
      res.status(200).json({
        error: {
          reason: "Interns limited to 6 hours per day",
          level: "error"
        }
      });
      return;
    }
    break;
}
// Return HTTP 200 for success
res.status(200).json({});
```

## Troubleshooting

### Common Issues

1. **Validation always fails** : Check endpoint implementation and request/response format
2. **Timeout errors** : Optimize validation logic or increase timeout limits
3. **Inconsistent behavior** : Verify timezone and date handling across different regions
4. **Permission errors** : Ensure proper authentication and authorization

## Migration from Plugin System

If migrating from the ONES Plugin 1.0 manhour validator, note these key differences:

- **Registration** : Use app manifest instead of plugin configuration
- **Authentication** : Use app tokens instead of plugin authentication
- **Deployment** : Deploy as app instead of plugin installation
- **API Changes** : Updated request/response structures
