# Entity Storage SDK

URL: https://docs.ones.cn/developer/abilities/node-sdk/storage/entity

## Prerequisites

- Before calling Entity Storage SDK, declare entity storage in your manifest first. See: [Hosted App Storage](https://docs.ones.cn/developer/guide/advanced/ones-hosted-app/storage/) .
- Import `@ones-open/node-sdk` in backend and use `storage` :
- For cross-language or direct HTTP integration, see: [ONES Hosted API / Storage API](https://docs.ones.cn/developer/abilities/ones-hosted-api/storage-api-list/) .
src/index.ts

```typescript
import { storage } from '@ones-open/node-sdk'

const entity = storage.entity
```

## Constraints

- For Entity Key, attributes, indexes, naming, and quantity limits, see: [Hosted App Storage (Constraints)](https://docs.ones.cn/developer/guide/advanced/ones-hosted-app/storage/#constraints) .

### Create or Update an Entity Data

- **Key** must satisfy the [Entity Key specification](https://docs.ones.cn/developer/guide/advanced/ones-hosted-app/storage/#constraints) .
- **Entity data** must satisfy the Create or update entity data specification below.
**Example usage** :

src/index.ts

```typescript
import { storage } from '@ones-open/node-sdk'

const entity = storage.entity

entity('employee').set('employee001', {
  name: 'Mike',
  age: 25,
  deleted: false,
})
```

#### Create or Update Entity Data Specification

Entity data attribute types must satisfy the [entity attribute definition](https://docs.ones.cn/developer/guide/advanced/ones-hosted-app/storage/#attribute) in `opkx.json` .

- If **Key** does not exist, create the entity data:
- Required attribute, need to be provided.
- Attributes that declare default values, if missing, the entity data will be created with the default values.
- If **Key** exists, update the entity data:
- Required attribute, need to be provided.
- Attributes that declare default values, if missing, keep the original attribute value unchanged.

### Batch Create or Update Entity Data

**BatchSet** receive a set of data, some of which can be created and some updated. And each piece of data must meet the following requirements:

- **Key** must satisfy the [Entity Key specification](https://docs.ones.cn/developer/guide/advanced/ones-hosted-app/storage/#constraints) .
- **Entity data** must satisfy the Create or update entity data specification above.
- In the same call, the entity data created in batches have the same creation timestamp.
- When sorting by the creation timestamp of the data, the sorting results of the data with the same timestamp depend on the performance of the database.
**Example usage** :

src/index.ts

```typescript
import { storage } from '@ones-open/node-sdk'

const entity = storage.entity

entity('employee').batchSet([
  {
    key: 'employee888',
    value: {
      name: 'Emma',
      age: 24,
      deleted: true,
    },
  },
  {
    key: 'employee222',
    value: {
      name: 'Neo',
      age: 28,
      deleted: false,
    },
  },
  {
    key: 'employee999',
    value: {
      name: 'Molly',
      age: 30,
      deleted: false,
    },
  },
])
```

### Delete an Entity Data

- **Key** must satisfy the [Entity Key specification](https://docs.ones.cn/developer/guide/advanced/ones-hosted-app/storage/#constraints) .
- If **Key** does not exist, the SDK will not throw an error.
**Example usage** :

src/index.ts

```typescript
import { storage } from '@ones-open/node-sdk'

const entity = storage.entity

entity('employee').delete('employee001')
```

### Batch Delete Entity Data

**BatchDelete** receive a set of data, and each piece of data must comply with:

- **Key** must satisfy the [Entity Key specification](https://docs.ones.cn/developer/guide/advanced/ones-hosted-app/storage/#constraints) .
- If **Key** does not exist, the SDK will not throw an error.
**Example usage** :

src/index.ts

```typescript
import { storage } from '@ones-open/node-sdk'

const entity = storage.entity

entity('employee').batchDelete(['employee888', 'employee222'])
```

### Get an Entity Data

- **Key** must satisfy the [Entity Key specification](https://docs.ones.cn/developer/guide/advanced/ones-hosted-app/storage/#constraints) .
- If **Key** does not exist, `undefined` is returned and the SDK will not throw an error.
**Example usage** :

src/index.ts

```typescript
import { storage } from '@ones-open/node-sdk'

const entity = storage.entity

entity('employee')
  .get('employee001')
  .then((data) => {
    console.log(data)
    console.log(data?.name)
    console.log(data?.age)
    console.log(data?.deleted)
  })
```

**Return type** :

src/index.ts

```typescript
type data = {
  name: string
  age: number
  deleted: boolean
}
```

### Use Entity Query Object

Entity query objects provide more query methods.

**Example usage** :

src/index.ts

```typescript
import { storage } from '@ones-open/node-sdk'

const entity = storage.entity

entity('employee').query()
```

### Get an Entity Data by Entity Query Object

- If the entity does not have any data, `undefined` is returned and the SDK will not throw an error.
**Example usage** :

src/index.ts

```typescript
import { storage } from '@ones-open/node-sdk'

const entity = storage.entity

entity('employee')
  .query()
  .getOne()
  .then((data) => {
    console.log(data?.key)
    console.log(data?.value)
    console.log(data?.value.name)
    console.log(data?.value.age)
    console.log(data?.value.deleted)
  })
```

**Return type** :

src/index.ts

```typescript
type data = {
  key: string
  value: {
    name: string
    age: number
    deleted: boolean
  }
}
```

### Get Entity Data Array by Entity Query Object

- If the entity does not have any data, an empty array is returned and the SDK does not throw an error.
**Example usage** :

src/index.ts

```typescript
import { storage } from '@ones-open/node-sdk'

const entity = storage.entity

entity('employee')
  .query()
  .getMany()
  .then((data) => {
    console.log(data.page_info.count)
    console.log(data.page_info.has_more)
    console.log(data.page_info.end_cursor)
    console.log(data.data[0].key)
    console.log(data.data[0].value)
  })
```

**Return type** :

src/index.ts

```typescript
type data = {
  page_info: {
    count: number
    has_more: boolean
    end_cursor: string
  }
  data: {
    key: string
    value: {
      name: string
      age: number
      deleted: boolean
    }
  }[]
}
```

### Get Entity Data Total Number by Entity Query Object

**Example usage** :

src/index.ts

```typescript
import { storage } from '@ones-open/node-sdk'

const entity = storage.entity

entity('employee')
  .query()
  .count()
  .then((data) => {
    console.log(data)
  })
```

**Return type** :

src/index.ts

```typescript
type data = number
```

### Set Entity Query Length (default: 10)

The entity query object supports setting the entity query length.

Supported input range: **[1, 1000]** .

**Example usage** :

src/index.ts

```typescript
import { storage } from '@ones-open/node-sdk'

const entity = storage.entity

entity('employee').query().limit(100).getMany()
```

### Set Entity Query Sort (default: ASC)

Entity query objects support setting entity query sorting.

You can only enter **Sort** , sort enumeration, and its enumeration values are:

- **ASC**
- **DESC**
In [Custom index definition](https://docs.ones.cn/developer/guide/advanced/ones-hosted-app/storage/#indexes)

- When no index is defined:
- Sort by the timestamp when the data was created.
- When an index is defined:
- Sort by the attribute value of the partition of the index and the timestamp when the data was created.
- When sorting by the timestamp when the data was created, the sorting result of data with the same timestamp depends on the performance of the database.
**Example usage** :

src/index.ts

```typescript
import { storage } from '@ones-open/node-sdk'

const entity = storage.entity
const { Sort } = entity

entity('employee').query().sort(Sort.DESC).getMany()
```

### Set Entity Query Cursor

Entity query objects support setting entity query cursors.

**Example usage** :

src/index.ts

```typescript
import { storage } from '@ones-open/node-sdk'

const entity = storage.entity

const query = entity('employee').query().limit(10)

query.getMany().then((data) => {
  query
    .cursor(data.page_info.end_cursor)
    .getMany()
    .then((data2) => {
      console.log(data2)
    })
})
```

### Set Entity Query Index

In [Custom index definition](https://docs.ones.cn/developer/guide/advanced/ones-hosted-app/storage/#indexes) , setting entity query indexes is supported only for entities that have indexes defined.

**Example usage** :

src/index.ts

```typescript
import { storage } from '@ones-open/node-sdk'

const entity = storage.entity

entity('employee').query().index('find_by_name')

entity('employee')
  .query()
  .index('find_by_age_in_deleted_partition', [false])
  .getMany()
  .then((data) => {
    // Mike
    // Neo
    // Molly
  })
```

### Set Entity Query Where Condition

Only entities with indexes defined in [entity definitions](https://docs.ones.cn/developer/guide/advanced/ones-hosted-app/storage/#indexes) can support setting entity query conditions.

In addition, entity query objects must first set entity query indexes before supporting setting entity query conditions.

You can only enter **WhereConditions** , entity query condition method enumeration, and its method enumeration values are:

- **beginsWith**
- **between**
- **equalTo**
- **greaterThan**
- **lessThan**
- **greaterThanEqualTo**
- **lessThanEqualTo**
- **containsAny**
**Example usage** :

src/index.ts

```typescript
import { storage } from '@ones-open/node-sdk'

const entity = storage.entity
const { WhereConditions } = entity

entity('employee')
  .query()
  .index('find_by_name')
  .where(WhereConditions.beginsWith('M'))
  .getMany()
  .then((data) => {
    // Mike
    // Molly
  })

entity('employee')
  .query()
  .index('find_by_age_in_deleted_partition', [true])
  .where(WhereConditions.greaterThan(0))
  .getMany()
  .then((data) => {
    // Emma
  })
```

### SDK Use Specification

#### SDK Call Rule

- Write timeout: 15 seconds
- Query timeout: 5 seconds
- Maximum number of records returned in a single call: 1000

#### SDK Data Writing Specification

[Entity data specification](https://docs.ones.cn/developer/guide/advanced/ones-hosted-app/storage/#entity-storage)

### SDK Error Handling

All entity operations are asynchronous.

For error handling of the following methods, please refer to the example usage:

- set
- batchSet
- delete
- batchDelete
- get
- getOne
- getMany
- count
**Example usage** :

src/index.ts

```typescript
import { storage } from '@ones-open/node-sdk'
import type { EntityError } from '@ones-open/node-sdk'

const entity = storage.entity

entity('employee')
  .query()
  .getOne()
  .then((data) => {
    console.log(data)
  })
  .catch((error: EntityError) => {
    console.log(error.code)
    console.log(error.err_msg)
  })

async function hello() {
  try {
    const data = await entity('employee').query().getOne()
    console.log(data)
  } catch (err: any) {
    const error: EntityError = err
    console.log(error.code)
    console.log(error.err_msg)
  }
}
```

**Return type** :

src/index.ts

```typescript
type EntityError = {
  code: string
  err_msg: string
}
```

#### SDK Error Code

| Error code | Description |
| --- | --- |
| EntityNameInvalid | Entity name is empty. Or contains illegal characters. Or exceeds maximum length limit. |
| EntityNotFound | Entity name does not exist in configuration. |
| EntityDataEmpty | Entity data cannot be empty. |
| EntityDataBatchLimit | Too much entity data. |
| EntityDataKeyInvalid | Key is empty. Or contains illegal characters. Or exceeds maximum length limit. |
| EntityDataKeyDuplicate | Duplicate key is not allow. |
| EntityDataValueAttrInvalid | Attribute name is empty. Or contains illegal characters. Or exceeds maximum length limit. |
| EntityDataValueAttrNotFound | Attribute name does not exist in configuration. |
| EntityDataValueEmpty | Value cannot be empty. |
| EntityDataValueInvalid | Value is illegal. |
| EntityDataStringValueTooLong | The value of the attribute of type string exceeds the maximum length limit. |
| EntityDataTextValueTooLong | The value of the attribute of type text exceeds the maximum length limit. |
| EntityDataAttrRequired | A required attribute is missing. |
| EntityDataValueTypeInvalid | The type of the attribute value does not match the defined type. |
| EntityDataIndexEmpty | The index cannot be empty. |
| EntityDataIndexNameInvalid | The index is empty. Or contains illegal characters. Or exceeds the maximum length limit. |
| EntityDataIndexNotFound | The index does not exist in configuration. |
| EntityDataPartitionValueInvalid | The attribute value in the custom index is empty or illegal. |
| EntityDataPartitionValueTypeInvalid | The type of the attribute value in the custom index does not match the defined type. |
| EntityDataPartitionValueTooLong | The attribute value in the custom index exceeds the maximum length limit. |
| EntityDataUniqueConstraintFailed | The data has a unique constraint error. |
| EntityDataWhereConditionValueTypeInvalid | The attribute value type of the entity query condition clause does not match. |
| EntityDataWhereConditionValueTooLong | The attribute value of the entity query condition clause exceeds the maximum length limit. |
| EntityDataPageCursorInvalid | The value of the entity query cursor is illegal. |
| EntityDataSortValueInvalid | The value of the entity query sort is illegal. |
| EntityDataPageLimitNotInRange | The value of the entity query paging length is illegal. |
| EntityDataAPITimeOut | The entity operation or query timed out. |
| MalformedJSON | JSON serialization failed. |
