# Object Storage SDK

URL: https://docs.ones.cn/developer/abilities/node-sdk/storage/object

## Prerequisites

- Before calling Object Storage SDK, declare object storage in your manifest first. See: [Hosted App Storage](https://docs.ones.cn/developer/guide/advanced/ones-hosted-app/storage/) .
- Import `@ones-open/node-sdk` in backend and use `storage` :
- For cross-language or direct HTTP integration, see: [ONES Hosted API / Storage API](https://docs.ones.cn/developer/abilities/ones-hosted-api/storage-api-list/) .
src/index.ts

```typescript
import { storage } from '@ones-open/node-sdk'

const object = storage.object
```

## Constraints

- For Object Key, file size, and signature validity constraints, see: [Hosted App Storage (Constraints)](https://docs.ones.cn/developer/guide/advanced/ones-hosted-app/storage/#constraints-1) .

### Upload/Update an Object

Uploading an object requires two steps:

- Step 1: Use the SDK to obtain the upload address and parameters.
- Step 2: Use the upload address and parameters (including the target file) to upload the object.

#### Upload Pre-signing

- **Key** must satisfy [Object key specification](https://docs.ones.cn/developer/guide/advanced/ones-hosted-app/storage/#object-key)
- The pre-signed address has a validity period and needs to be re-signed after it expires.
**Example usage** :

src/index.ts

```typescript
import { storage } from '@ones-open/node-sdk'
import type { ObjectStoreUploadResult } from '@ones-open/node-sdk'

const object = storage.object

const result = <ObjectStoreUploadResult>await object.upload('cover')
// Request on Hosted App backend
const url = result.getUrl()
// Request on Hosted App frontend
const webUrl = result.getWebUrl()
// The FormData parameter of the request
const fields = result.getFields()
```

**Return type** :

src/index.ts

```typescript
type result = {
  getUrl(): string // Request on Hosted App backend
  getWebUrl(): string // Request on Hosted App frontend
  getFields(): ObjectResultDataFields // The FormData parameter of the request
}
type ObjectResultDataFields = Record<string, string>
```

#### Upload an Object (Backend)

The specific upload method is implemented by the business.

**Example usage** :

- **url** , obtained through `result.getUrl()` .
- **data** , create an instance of `FormData` .
- **FormData** , in `Node.js` , you need to implement `FormData` yourself.
- Or use a third-party library from the community, such as `formdata-node@5.0.1` .
- **fields** , get them through `result.getFields()` and pass them through one by one.
- If the key of **fields** is missing or its content is modified, verification will fail.
- **file** , the binary data and file name of the uploaded object.
- If your file is `base64` or `Buffer` , you can convert it to `Blob` type data.
- **method** , set to `post` .
- **headers** , set `Content-Type` to `multipart/form-data` .
- The `status` of a successful upload is **201** .
src/index.ts

```typescript
import { FormData } from 'formdata-node' // formdata-node@5.0.1
import { storage } from '@ones-open/node-sdk'
import type { ObjectStoreUploadResult } from '@ones-open/node-sdk'

const object = storage.object

const result = <ObjectStoreUploadResult>await object.upload('cover')

// case: 'https://example.com/upload/'
const url = result.getUrl()
// case: { Policy: 'policy', ... }
const fields = result.getFields()

const form = new FormData()
Object.keys(fields).forEach((key) => {
  const value = fields[key]
  form.append(key, value)
})
const blob = new Blob([buffer]) // cover blob data
form.append('file', blob, 'cover')

// axios or fetch or any request methods
axios({
  url,
  data: form,
  method: 'post',
  headers: {
    'Content-Type': 'multipart/form-data',
  },
}).then((response) => {
  console.log(response)
  if (response.status === 201) {
    console.log('uploaded successfully')
  }
})
```

#### Upload an Object (Frontend)

The specific upload method is implemented by the business.

**Example usage** :

- **url** , obtained through `result.getWebUrl()` .
- You need to implement an API endpoint in your Hosted App.
- First call the SDK method, and then return the result to the frontend.
- The returned address is an absolute path.
- **data** , create an instance of `FormData` .
- **fields** , get them through `result.getFields()` and pass them through one by one.
- You need to implement an API endpoint in your Hosted App.
- First call the SDK method, and then return the result to the frontend.
- If the key of **fields** is missing or its content is modified, verification will fail.
- **file** , obtained through `<input type="file">` .
- **method** , set to `post` .
- **headers** , set `Content-Type` to `multipart/form-data` .
- The `status` of a successful upload is **201** .
src/index.ts

```typescript
import { storage } from '@ones-open/node-sdk'
import type { ObjectStoreUploadResult } from '@ones-open/node-sdk'

const object = storage.object

export async function hello() {
  const result = <ObjectStoreUploadResult>await object.upload('cover')
  return {
    body: {
      url: result.getWebUrl(),
      fields: result.getFields(),
    }
  }
}
```

frontend/src/example/index.tsx

```typescript
const handleClick = async () => {
  const response = await fetch('/api/hello')

  // case1: 'https://example.com/upload/'
  // case2: '/upload/'
  const url = response.data.url
  // case: { Policy: 'policy', ... }
  const fields = response.data.fields

  const form = new FormData()
  Object.keys(fields).forEach((key) => {
    const value = fields[key]
    form.append(key, value)
  })
  const input = document.querySelector('input')
  const file = input!.files?.[0] // file from <input type="file">
  form.append('file', file!)

  // axios or fetch or any request methods
  axios({
    url,
    data: form,
    method: 'post',
    headers: {
      'Content-Type': 'multipart/form-data',
    },
  }).then((response) => {
    console.log(response)
    if (response.status === 201) {
      console.log('uploaded successfully')
    }
  })
}
```

### Download an Object

Downloading an object requires two steps:

- Step 1: Use the SDK to obtain the download address.
- Step 2: Use the download address to download the object.

#### Download Pre-signature

- **Key** must satisfy [Object key specification](https://docs.ones.cn/developer/guide/advanced/ones-hosted-app/storage/#object-key)
- The pre-signed address has a validity period and needs to be re-signed after it expires.
**Example usage** :

src/index.ts

```typescript
import { storage } from '@ones-open/node-sdk'
import type { ObjectStoreDownloadResult } from '@ones-open/node-sdk'

const object = storage.object

const result = <ObjectStoreDownloadResult>await object.download('cover')
// Request on Hosted App backend
const url = result.getUrl()
// Request on Hosted App frontend
const webUrl = result.getWebUrl()
```

**Return type** :

src/index.ts

```typescript
type result = {
  getUrl(): string // Request on Hosted App backend
  getWebUrl(): string // Request on Hosted App frontend
}
```

#### Download an Object (Backend)

The specific download method is implemented by the business.

**Example usage** :

- **url** , obtained through `result.getUrl()` .
- **method** , set to `get` .
src/index.ts

```typescript
import { storage } from '@ones-open/node-sdk'
import type { ObjectStoreDownloadResult } from '@ones-open/node-sdk'

const object = storage.object

const result = <ObjectStoreDownloadResult>await object.download('cover')

// case: 'https://example.com/download/'
const url = result.getUrl()

// axios or fetch or any request methods
axios({
  url,
  method: 'get',
}).then((response) => {
  console.log(response)
})
```

#### Download an Object (Frontend)

The specific download method is implemented by the business.

- The file name of the downloaded file can be customized using the download attribute of the `<a>` tag.
**Example usage** :

- **url** , obtained through `result.getWebUrl()` .
- You need to implement an API endpoint in your Hosted App.
- First call the SDK method, and then return the result to the frontend.
- The returned address is an absolute path.
src/index.ts

```typescript
import { storage } from '@ones-open/node-sdk'
import type { ObjectStoreDownloadResult } from '@ones-open/node-sdk'

const object = storage.object

export async function hello() {
  const result = <ObjectStoreDownloadResult>await object.download('cover')
  return {
    body: {
      url: result.getWebUrl(),
    }
  }
}
```

frontend/src/example/index.tsx

```typescript
const handleClick = async () => {
  const response = await fetch('/api/hello')

  // case1: 'https://example.com/download/'
  // case2: '/download/'
  const url = response.data.url

  const a = document.createElement('a')
  a.href = url
  a.setAttribute('download', 'cover')
  a.click()
}
```

#### Preview a File or Image (Frontend)

The specific preview method is implemented by the business.

- The browser does not support the preview file type, and the business needs to implement the preview logic.
- If the file address is opened in the browser, the default behavior is downloading.
**Example usage** :

- **url** , obtained through `result.getWebUrl()` .
- You need to implement an API endpoint in your Hosted App.
- First call the SDK method, and then return the result to the frontend.
- The returned address is an absolute path.
src/index.ts

```typescript
import { storage } from '@ones-open/node-sdk'
import type { ObjectStoreDownloadResult } from '@ones-open/node-sdk'

const object = storage.object

export async function hello() {
  const result = <ObjectStoreDownloadResult>await object.download('cover')
  return {
    body: {
      url: result.getWebUrl(),
    }
  }
}
```

frontend/src/example/index.tsx

```typescript
const response = await fetch('/api/hello')

// case1: 'https://example.com/download/'
// case2: '/download/'
const url = response.data.url

const preview = <img src={url}></img>
```

### Delete an Object

- **Key** must satisfy [Object key specification](https://docs.ones.cn/developer/guide/advanced/ones-hosted-app/storage/#object-key)
**Example usage** :

src/index.ts

```typescript
import { storage } from '@ones-open/node-sdk'

const object = storage.object

object.delete('cover')
```

### Get an Object Metadata

- **Key** must satisfy [Object key specification](https://docs.ones.cn/developer/guide/advanced/ones-hosted-app/storage/#object-key)
**Example usage** :

src/index.ts

```typescript
import { storage } from '@ones-open/node-sdk'
import type { ObjectMetadataResultData } from '@ones-open/node-sdk'

const object = storage.object

const data = <ObjectMetadataResultData>await object.metadata('cover')
console.log(data.object_key)
console.log(data.size)
```

**Return type** :

src/index.ts

```typescript
type data = {
  object_key: string
  size: number
}
```

### SDK Error Handling

All object operations are asynchronous.

For error handling of the following methods, please refer to the example usage:

- upload
- download
- delete
- metadata
**Example usage** :

src/index.ts

```typescript
import { storage } from '@ones-open/node-sdk'
import type { ObjectError, ObjectStoreUploadResult } from '@ones-open/node-sdk'

const object = storage.object

// Catching errors
async function hello() {
  const result = await object.upload('cover')
  if (result instanceof object.ObjectError) {
    throw result
  }
  return {
    url: result.getWebUrl(),
    fields: result.getFields(),
  }
}

// Not catching errors
async function hello() {
  const result = <ObjectStoreUploadResult>await object.upload('cover')
  return {
    url: result.getWebUrl(),
    fields: result.getFields(),
  }
}
```

**Return type** :

src/index.ts

```typescript
type ObjectError = {
  code: string
  err_msg: string
}
```

#### SDK Error Code

| Error code | Description |
| --- | --- |
| ObjectKeyInvalid | Object key is empty. Or contains illegal characters. Or exceeds maximum length limit. |
| ObjectKeyNotfound | Object key is not found. |
| RequestTimeOut | Request timeout. |

If an error occurs when uploading or downloading an object, the S3 standard error code is returned. For details, please refer to: [S3 error code](https://docs.aws.amazon.com/AmazonS3/latest/API/API_Error.html) .
