# ONES CLI

URL: https://docs.ones.cn/developer/abilities/ones-cli

The ONES Open Platform CLI ( `ones` ) is a command-line tool that helps you develop, build, and manage ONES applications. This document provides a comprehensive guide to all available commands and their options.

## Requirements

| Node.js |
| --- |
| v22+ |

## Installation

Install the CLI tool globally using npm, pnpm, yarn, or bun:

```bash
npm install -g @ones-open/cli
# or
pnpm add -g @ones-open/cli
# or
yarn global add @ones-open/cli
# or
bun install -g @ones-open/cli
```

## Quick Start

After installation, you can use the `ones` command from anywhere in your terminal:

```bash
ones --help
```

## Commands

### `ones create`

Create a new ONES App.

**Usage:**

```bash
ones create [options] <project-path>
```

**Arguments:**

- `project-path` ( **required** ): Specify the project path.
**Options:**

- `-m, --manifest-only` : Only create the manifest file.
**Examples:**

```bash
# Create a new project in the current directory
ones create .

# Create a new project in a specific directory
ones create my-app

# Create only the manifest file
ones create my-app --manifest-only
```

**Note:**

If the target path already contains an `opkx.json` file, the command exits without creating or overwriting anything.

### `ones build`

Build your ONES App.

- **Step 1:** Compile your source code into distribution assets. (Default command: `npm run build` )
- **Step 2:** Package the distribution assets and `opkx.json` into a single `.opkx` file.
**Usage:**

```bash
ones build [options]
```

**Options:**

- `-o, --output [file-path]` : Specify the output file path.
- `-c, --command [string]` : Specify the build command.
**Examples:**

```bash
# Build the application
ones build

# Build with custom build command
ones build --command "your-build-command"

# Build with custom output path
ones build --output ./archive/app.opkx
```

**Note:**

This command builds your ONES application by running the `build` script defined in your `package.json` . The build process compiles your application code and prepares it for deployment.

package.json

```json
{
  "scripts": {
    "build": "your-build-command"
  }
}
```

After you build your app, you can [install your app](https://docs.ones.cn/developer/guide/getting-started/#install-your-app-in-ones) .

### `ones dev`

Start your local development server and connect to ONES.

- **Step 1:** Start your local development server. (Default command: `npm run dev` )
- **Step 2:** Start a tunnel to connect the local server with ONES.
- **Step 3:** Request a token for the hosted storage ability on your behalf.
- **Step 4:** Install your app to your ONES organization.
**Usage:**

```bash
ones dev [options]
```

**Options:**

- `-i, --install [boolean]` : Install your ONES App after the server is ready.
- `-c, --command [string]` : Specify the dev command.
- `-s, --clear-storage [boolean]` : Clear development storage namespace before applying hosted storage.
**Examples:**

```bash
# Start development server (the app is installed automatically if not already installed)
ones dev

# Start development server and install the app or update the app
ones dev --install

# Start development server without installing or updating the app
ones dev --install false

# Start development server and use the custom dev command
ones dev --command "your-dev-command"

# Start development server and clear development storage namespace before applying hosted storage
ones dev --clear-storage
```

**Note:**

This command starts the development server for your ONES application. It runs the `dev` script from your `package.json` and can optionally install the application for local testing.

package.json

```json
{
  "scripts": {
    "dev": "your-dev-command"
  }
}
```

#### Local service only

If you have not run `ones login` , the CLI uses local development mode by default and displays your local development URL.

```bash
Local: http://localhost:8201
App "my-app" server is ready!
```

#### Start local service and connect to ONES

If you have logged in via the CLI and your session is still valid, the CLI connects to ONES by default. You can use the `install` option to choose whether to install the app to your ONES organization.

```bash
Local: http://localhost:8201
URL: https://mycompany.ones.com/your-app-relay-url
App "my-app" server is ready!

App "my-app" installed successfully!
See App detail: https://mycompany.ones.com/your-app-detail-url
```

#### Hosted storage ability

Hosted storage ability is available by default.

Before you use the hosted storage ability, you need to declare the storage ability in your manifest.

- [Hosted App Storage](https://docs.ones.cn/developer/guide/advanced/ones-hosted-app/storage/)
If you want to clear development storage namespace before applying hosted storage, use the `--clear-storage` option.

```bash
ones dev --clear-storage
```

#### Custom dev command

You can start your local service with a custom command; we inject environment variables when it runs.

Your server must listen on the port specified by the `ONES_HOSTED_PORT` environment variable so that ONES can access your local service.

```json
{
  "NODE_ENV": "development",
  "ONES_HOSTED_PORT": "8201",
  "ONES_DEV_WEB_SERVER_PORT": "8202",
  "ONES_HOSTED_TOKEN": "your-hosted-token",
  "ONES_HOSTED_APP_ID": "your-hosted-app-id",
  "ONES_HOSTED_MANAGER_BASE_URL": "https://mycompany.ones.com/platform/runtime_manager",
  "ONES_HOSTED_APP_BASE_URL": "https://mycompany.ones.com/platform/app/relay/dispatch/your-hosted-app-id"
}
```

The service must also meet our API declaration requirements; otherwise ONES cannot access your local service.

- [Health Check Configuration](https://docs.ones.cn/developer/guide/advanced/ones-hosted-app/manifest/#health-check-configuration)
- [Callback Fields](https://docs.ones.cn/developer/guide/advanced/app-lifecycle/#callback-fields)

### `ones tunnel <port>`

Start a tunnel to connect your local server with ONES.

**Usage:**

```bash
ones tunnel <port>
```

**Arguments:**

- `port` ( **required** ): Specify the port number for tunnel.
**Examples:**

```bash
# Start tunnel on port 3000
ones tunnel 3000
```

**Note:**

The tunnel command creates a secure connection between your local development environment and the ONES platform, allowing you to test your application without deploying it.

This command allows developers to use any technology stack for development.

Of course, for ONES to access your local service, you need to run a server locally on the same port.

```bash
# Start a server on port 3000
node server.js
# or
python server.py
```

The service must also meet our API declaration requirements; otherwise ONES cannot access your local service.

- [Health Check Configuration](https://docs.ones.cn/developer/guide/advanced/ones-hosted-app/manifest/#health-check-configuration)
- [Callback Fields](https://docs.ones.cn/developer/guide/advanced/app-lifecycle/#callback-fields)
You need to manually install your app in the **App Center** in ONES.

You must implement the install URL endpoint yourself. For reference:

- [Build your app manifest](https://docs.ones.cn/developer/guide/advanced/externally-hosted-app/externally-hosted-app-local-development/#build-your-app-manifest)

### `ones login <base-url>`

Log in to your ONES account.

**Usage:**

```bash
ones login <base-url>
```

**Arguments:**

- `base-url` ( **required** ): Specify the ONES URL for login.
**Examples:**

```bash
# Login to a specific ONES instance
ones login https://mycompany.ones.com
```

**Note:**

The `ones login` command is currently supported only for On-Premises deployments. SaaS is not currently supported.

After you run the command, the CLI opens an authorization page in your browser, where you need to authorize your account.

### `ones logout`

Log out of your ONES account.

**Usage:**

```bash
ones logout
```

**Examples:**

```bash
ones logout
```

### `ones whoami`

Display the account information of the logged in user.

**Usage:**

```bash
ones whoami
```

**Examples:**

```bash
ones whoami
```

### `ones app`

Manage app installations.

**Usage:**

```bash
ones app
```

**Subcommands:**

- `ones app install [app-id]`
- `ones app enable [app-id]`
- `ones app disable [app-id]`
- `ones app uninstall [app-id]`
- `ones app logs [options] [app-id]`

#### `ones app install`

Install or update your ONES App.

**Usage:**

```bash
ones app install [app-id]
```

**Examples:**

```bash
ones app install

# Install or update by app id
ones app install app_xxx
```

**Note:**

- If `[app-id]` is omitted, the CLI reads app id from `./opkx.json` .
- If `[app-id]` is provided, the CLI uses the provided app id.
- Installation is only allowed for apps in the `development` environment. For `production` , the command exits with an error.
- The command output indicates which environment is being operated.
You should login to your ONES account before running this command.

Before running this command, start your local service using one of the following:

- ones dev
- ones tunnel

#### `ones app enable`

Enable your ONES App.

**Usage:**

```bash
ones app enable [app-id]
```

**Examples:**

```bash
ones app enable

# Enable by app id
ones app enable app_xxx
```

**Note:**

- If `[app-id]` is omitted, the CLI reads app id from `./opkx.json` .
- If `[app-id]` is provided, the CLI uses the provided app id.
- Enable is available for both `development` and `production` apps.
- The command output indicates which environment is being operated.
You should login to your ONES account before running this command.

And your App should be installed in your ONES organization before running this command.

#### `ones app disable`

Disable your ONES App.

**Usage:**

```bash
ones app disable [app-id]
```

**Examples:**

```bash
ones app disable

# Disable by app id
ones app disable app_xxx
```

**Note:**

- If `[app-id]` is omitted, the CLI reads app id from `./opkx.json` .
- If `[app-id]` is provided, the CLI uses the provided app id.
- Disable is available for both `development` and `production` apps.
- The command output indicates which environment is being operated.
You should login to your ONES account before running this command.

And your App should be installed in your ONES organization before running this command.

#### `ones app uninstall`

Uninstall your ONES App.

**Usage:**

```bash
ones app uninstall [app-id]
```

**Examples:**

```bash
ones app uninstall

# Uninstall by app id
ones app uninstall app_xxx
```

**Note:**

- If `[app-id]` is omitted, the CLI reads app id from `./opkx.json` .
- If `[app-id]` is provided, the CLI uses the provided app id.
- Uninstall is only allowed for apps in the `development` environment. For `production` , the command exits with an error.
- The command output indicates which environment is being operated.
You should login to your ONES account before running this command.

And your App should be installed in your ONES organization before running this command.

#### `ones app logs`

View runtime logs for your ONES App.

**Usage:**

```bash
ones app logs [options] [app-id]
```

**Options:**

- `--from-opkx-json` : Read app id from local `opkx.json` when `app-id` is not provided.
- `-t, --tail [number]` : Specify latest log lines to fetch (default: `100` ).
**Examples:**

```bash
# Read production logs by app id
ones app logs app_xxx

# Read app id from current directory opkx.json
ones app logs --from-opkx-json

# Fetch latest 200 lines
ones app logs app_xxx --tail 200
```

**Note:**

- This command only supports apps installed in the `production` environment.
- If `app-id` is omitted, you must pass `--from-opkx-json` .
- `--tail` defaults to `100` when not provided.

## Common Options

All commands support the following global options:

- `-v, --version` : Display the CLI version number
- `-h, --help` : Display help information for the command

## Workflow Examples

### Complete Development Workflow

```bash
# 1. Create a new project
ones create my-ones-app

# 2. Navigate to the project directory
cd my-ones-app

# 3. Log in to your ONES environment
ones login https://mycompany.ones.com

# 4. Start the development server (connects to ONES by default)
ones dev

# 5. Build the application after finishing your development
ones build
```

The next step is to [install your app](https://docs.ones.cn/developer/guide/getting-started/#install-your-app-in-ones) .

## Troubleshooting

### Authentication Issues

If you experience authentication problems:

1. Verify that the base URL is correct and accessible
2. Try logging out and logging in again: `ones logout && ones login <base-url>`
3. Check your network connection and firewall settings

### Permission Errors

If you encounter permission errors, especially related to file operations:

- On Unix-like systems, you may need to adjust file permissions
- Ensure you have write access to the project directory
- Check that the CLI has permission to access the configuration directory
