# Web SDK

URL: https://docs.ones.cn/developer/abilities/web-sdk

## Table of Contents

- 1. Introduction
- 2. Getting Started
- 2.1 Use via external script
- 2.2 Install via package manager
- 3. Available SDK Methods

## 1. Introduction

The Web SDK provides a simple, type-friendly API to access ONES runtime data and UI utilities directly from your web application. It abstracts common integration tasks such as fetching the current user's locale/timezone, reading team metadata, and invoking platform utilities like toast notifications and modal dialogs.

Typical scenarios include:

- Reading environment context (locale, timezone, team) to localize or configure your UI.
- Fetching application metadata or OpenAPI definitions to drive dynamic UIs.
- Showing user feedback using built-in UI helpers (toast, modal) that match ONES styles.
At a glance:

```ts
import { ONES } from '@ones-open/web-sdk'

// Example usage (pseudo-code)
const locale = await ONES.getLocale()
const timezone = await ONES.getTimezone()
const teamInfo = await ONES.getTeamInfo()

// Fetch metadata
const app = await ONES.fetchApp(/* url and options */)
const openapi = await ONES.fetchOpenAPI(/* url and options */)

// UI helpers
await ONES.UI.toast({ type: 'success', title: 'hello world' })
await ONES.UI.modal({ title: 'Confirm', children: 'Proceed?' })
```

## 2. Getting Started

You can integrate the Web SDK in two ways, depending on your tech stack and build setup.

### 2.1 Use via external script

Best for server-rendered apps written in Go or Python (or any stack without a Node.js bundler). Simply add the script tag to your HTML. The SDK will be available globally as `window.SDK` .

```html
<script src="https://unpkg.com/@ones-open/web-sdk/dist/index.iife.js"></script>
<script>
  ;(async function () {
    const locale = await window.SDK.ONES.getLocale()
    const team = await window.SDK.ONES.getTeamInfo()
    window.SDK.ONES.UI.toast({ message: `Locale: ${locale}, Team: ${team?.name ?? ''}` })
  })()
</script>
```

Notes:

- Load this script as early as possible if other scripts depend on `SDK` .
- No additional build tooling is required.

### 2.2 Install via package manager

For modern frontend stacks using Node.js and a bundler (Vite, Webpack, etc.), install the SDK package.

Install with your preferred tool:

```bash
npm i @ones-open/web-sdk
# or
yarn add @ones-open/web-sdk
# or
pnpm add @ones-open/web-sdk
```

Import and use in your code:

```ts
// Depending on your bundler configuration, the SDK may expose a default export or named exports.
// Common patterns shown below:
// Option A: default export
import SDK from '@ones-open/web-sdk'

const ONES = SDK.ONES

// Option B: named export
import { ONES } from '@ones-open/web-sdk';

async function bootstrap() {
  const tz = await ONES.getTimezone()
  ONES.UI.toast({ type: 'success', title: `Timezone: ${tz}` })
}

bootstrap()
```

## 3. Available SDK Methods

The ONES Web SDK currently supports the following methods:

### ONES.getLocale

Returns the current user's locale.

- **Method** : `ONES.getLocale()`
- **Use Cases** : Localization, language-aware formatting, content switching
- **Documentation** : [ONES.getLocale](https://docs.ones.cn/developer/abilities/web-sdk/get-locale/)

### ONES.getTimezone

Returns timezone information for the organization, team, and user.

- **Method** : `ONES.getTimezone()`
- **Use Cases** : Date/time display, scheduling, timezone-aware processing
- **Documentation** : [ONES.getTimezone](https://docs.ones.cn/developer/abilities/web-sdk/get-timezone/)

### ONES.getTeamInfo

Returns identifiers for the current team and organization.

- **Method** : `ONES.getTeamInfo()`
- **Use Cases** : Multi-tenant context, routing, scoping data requests
- **Documentation** : [ONES.getTeamInfo](https://docs.ones.cn/developer/abilities/web-sdk/get-team-info/)

### ONES.getUserInfo

Returns metadata about the current user (avatar, name, email, uuid).

- **Method** : `ONES.getUserInfo()`
- **Use Cases** : User profile display, audit, scoping requests by user
- **Documentation** : [ONES.getUserInfo](https://docs.ones.cn/developer/abilities/web-sdk/get-user-info/)

### ONES.getExtensionContext

Read the current extension context once or subscribe to changes with a callback.

- **Method** : `ONES.getExtensionContext()` or `ONES.getExtensionContext(callback)`
- **Use Cases** : Get the context of the current extension point's frontend slot
- **Documentation** : [ONES.getExtensionContext](https://docs.ones.cn/developer/abilities/web-sdk/get-extension-context/)

### ONES.getExtensionConfig

Return the extension config of the current extension point's frontend slot.

- **Method** : `ONES.getExtensionConfig()`
- **Use Cases** : Get the extension config for the current extension point
- **Documentation** : [ONES.getExtensionConfig](https://docs.ones.cn/developer/abilities/web-sdk/get-extension-config/)

### ONES.fetchApp

Fetches app resources relative to the app manifest `base_url` .

- **Method** : `ONES.fetchApp(input, init?)`
- **Use Cases** : Retrieve app metadata, call app-side endpoints
- **Documentation** : [ONES.fetchApp](https://docs.ones.cn/developer/abilities/web-sdk/fetch-app/)

### ONES.fetchOpenAPI

Fetches ONES Open API resources.

- **Method** : `ONES.fetchOpenAPI(input, init?)`
- **Use Cases** : Call ONES REST APIs, dynamic API exploration
- **Documentation** : [ONES.fetchOpenAPI](https://docs.ones.cn/developer/abilities/web-sdk/fetch-openapi/)

### ONES.clipboard

Exposes the Clipboard API (read/write text and clipboard items).

- **Method** : `ONES.clipboard.read()` , `ONES.clipboard.readText()` , `ONES.clipboard.write()` , `ONES.clipboard.writeText()`
- **Use Cases** : Copy/paste from your app, paste into ONES context
- **Documentation** : [ONES.clipboard](https://docs.ones.cn/developer/abilities/web-sdk/clipboard/)

### ONES.UI.toast

Displays toast notifications in ONES style.

- **Method** : `ONES.UI.toast(params)`
- **Use Cases** : User feedback, operation results, non-blocking notices
- **Documentation** : [ONES.UI.toast](https://docs.ones.cn/developer/abilities/web-sdk/ui-toast/)

### ONES.UI.modal

Opens modal dialogs with lifecycle hooks.

- **Method** : `ONES.UI.modal(params)`
- **Use Cases** : Confirmations, forms, interaction flows
- **Documentation** : [ONES.UI.modal](https://docs.ones.cn/developer/abilities/web-sdk/ui-modal/)

### Wiki.macro

Configure and save the current Wiki macro, upload document resources and report display status. These APIs require ONES `7.45.0+` and Web SDK `0.0.20+` . See [Wiki custom macros](https://docs.ones.cn/developer/abilities/extensions/wiki-macro/) for the complete integration flow.

| Method | API documentation |
| --- | --- |
| `Wiki.macro.openEditor` | [`openEditor`](https://docs.ones.cn/developer/abilities/web-sdk/wiki-macro-open-editor/) |
| `Wiki.macro.saveData` | [`saveData`](https://docs.ones.cn/developer/abilities/web-sdk/wiki-macro-save-data/) |
| `Wiki.macro.finishEdit` | [`finishEdit`](https://docs.ones.cn/developer/abilities/web-sdk/wiki-macro-finish-edit/) |
| `Wiki.macro.cancelEdit` | [`cancelEdit`](https://docs.ones.cn/developer/abilities/web-sdk/wiki-macro-cancel-edit/) |
| `Wiki.macro.uploadResource` | [`uploadResource`](https://docs.ones.cn/developer/abilities/web-sdk/wiki-macro-upload-resource/) |
| `Wiki.macro.setStatus` | [`setStatus`](https://docs.ones.cn/developer/abilities/web-sdk/wiki-macro-set-status/) |

- [Macro types and all context fields](https://docs.ones.cn/developer/abilities/web-sdk/wiki-macro-types/)
- [Context callback parameters and cleanup](https://docs.ones.cn/developer/abilities/web-sdk/get-extension-context/)
