# Externally Hosted App: Local Development

URL: https://docs.ones.cn/developer/guide/advanced/externally-hosted-app/externally-hosted-app-local-development

## Overview

信息
Use this guide to build and validate an externally hosted app on your local machine.

Most developers should build apps as **ONES-Hosted Apps** . See **[Getting Started](https://docs.ones.cn/developer/guide/getting-started/)** for a simpler way to build apps.

In this guide, you will create a simple ONES app (a web application that integrates with ONES) and connect it to ONES from your local environment.

> If you already have a web service, you can skip **Create an App Project** and integrate your existing application.

## Prerequisites

- Your preferred IDE or text editor, such as [VS Code](https://code.visualstudio.com/) .
- A basic understanding of [HTML, CSS, and JavaScript](https://developer.mozilla.org/en-US/docs/Web) .
- A basic understanding of [ONES](https://ones.com/) .
- Access to a self-hosted ONES instance or a ONES Cloud account.
- [Node.js](https://nodejs.org/) (version 20 or later).
- Optional: A tunnel tool such as [ngrok](https://ngrok.com/) or [LocalTunnel](https://github.com/localtunnel/localtunnel) , which lets ONES access your local server.

## Set Up Your Development Environment

1. Prepare your local environment for building an app for ONES.
2. Prepare your ONES environment for testing and validating app installation.
信息
You can install your ONES instance by following the [ONES Installation Guide](https://docs.ones.cn/deploy/install-upgrade/install/install-new/) .

Or sign up for a ONES Cloud account at [ones.com](https://ones.com/) .

## Create an App Project

We use [NestJS](https://docs.nestjs.com/) to create a sample ONES app.

1. Create a new project.

```bash
$ npm i -g @nestjs/cli
$ nest new ones-example-app
$ cd ones-example-app
```

Example/init new nestjs project

```bash
❯ nest new ones-example-app
✨  We will scaffold your app in a few seconds..

✔ Which package manager would you ❤️  to use? npm
CREATE ones-example-app/.prettierrc (51 bytes)
CREATE ones-example-app/README.md (5028 bytes)
CREATE ones-example-app/eslint.config.mjs (836 bytes)
CREATE ones-example-app/nest-cli.json (171 bytes)
CREATE ones-example-app/package.json (2042 bytes)
CREATE ones-example-app/tsconfig.build.json (97 bytes)
CREATE ones-example-app/tsconfig.json (544 bytes)
CREATE ones-example-app/src/app.controller.ts (274 bytes)
CREATE ones-example-app/src/app.module.ts (249 bytes)
CREATE ones-example-app/src/app.service.ts (142 bytes)
CREATE ones-example-app/src/main.ts (228 bytes)
CREATE ones-example-app/src/app.controller.spec.ts (617 bytes)
CREATE ones-example-app/test/jest-e2e.json (183 bytes)
CREATE ones-example-app/test/app.e2e-spec.ts (674 bytes)

✔ Installation in progress... ☕

🚀  Successfully created project ones-example-app

cd ones-example-app
```

## Build your app manifest

1. Create a new file called `manifest.json` in the root directory of your project.
2. Generate a random App ID. (You can also define one manually. It must start with `app_` and be 20 characters long.)

1. Add the following content to the `manifest.json` file. (Replace the `id` with the App ID you generated.)
Example/manifest.json

```json
{
  "id": "app_<your-app-id>",
  "name": "Test ONES App",
  "desc": "This is a test app",
  "version": "v0.0.1",
  "base_url": "",
  "auth": {
    "type": "jwt"
  },
  "lifecycle_callback": {
    "install": "/install_cb"
  }
}
```

信息
Refer to the App manifest schema for field-level details.

### App manifest schema

#### Properties

auth * object
type * string
Authentication type (currently only 'jwt' is supported)
**Enum values:** `"jwt"`

base_url * httpUrl

desc string | null
Max length:1024

events object | null
types * array
Min items:1
Array items:
item object
eventType * string
The event defined by ONES which the app will listen to.
Min length:1

url * string
Must start with / and not contain #
**Pattern:**`^/[^#\s]*$`
Max length:256

extensions object | null
manhourValidator array
Min items:1 Unique items
Array items:
item object
key * extensionKey

funcs * object
validate * extensionUrlPath

accountThirdparty array
Min items:1 Unique items
Array items:
item any
key * extensionKey

funcs * object
customLoginUrl extensionUrlPath

authLoginInfo extensionUrlPath

directorySync extensionUrlPath

messageNotify extensionUrlPath

helpInfo * extensionUrlPath

slots object
ones:account:thirdparty:logo extensionUrlPath

config * any
useCustomLoginAuth * boolean

useDirectorySource * boolean

useNotification * boolean

notificationUserIdType string
**Enum values:** `"ONES"`
`"Custom"`

appSettingPages array
Min items:1 Max items:1
Array items:
item object
funcs * object
customEntries * extensionUrlPath

key * extensionKey

wikiMacro array
Array items:
item object
key * string
**Pattern:**`^[a-zA-Z0-9]+$`
Min length:1 Max length:64

slots * object
ones:wiki:macro:render * string
**Pattern:**`^/[^\s?#]*([?][^\s#]*)?([#][^\s]*)?$`
Min length:1 Max length:256

ones:wiki:macro:edit string
**Pattern:**`^/[^\s?#]*([?][^\s#]*)?([#][^\s]*)?$`
Min length:1 Max length:256

config * object
name * string
Min length:1 Max length:64

icon string
**Pattern:**`^/[^\s?#]*([?][^\s#]*)?([#][^\s]*)?$`
Min length:1 Max length:256

shortcut string
Min length:1 Max length:64

actions array
Array items:
item object
id * string
**Pattern:**`^[a-zA-Z0-9]+$`
Min length:1 Max length:64

title * string
Min length:1 Max length:64

icon string
**Pattern:**`^/[^\s?#]*([?][^\s#]*)?([#][^\s]*)?$`
Min length:1 Max length:256

formControlExtension array
Min items:1 Unique items
Array items:
item object
key * extensionKey

slots * object
Additional properties:
* string
Min length:1

config * object
name * string
Min length:1

fieldUUIDs * array
Array items:
item string
Min length:1

supportForms * array
Min items:1 Unique items
Array items:
item string
**Enum values:** `"detail"`
`"create"`
`"transition"`

controlTips any

id * string
Format: app_ + 16 lowercase alphanumeric chars
**Pattern:**`^app_[0-9a-z]{16}$`
Min length:20 Max length:20

lifecycle_callback * object
disabled urlPath

enabled urlPath

install * urlPath

uninstalled urlPath

logo httpUrl
Max length:256

name * string
Min length:1 Max length:64

oauth object | null
redirect_url string | null
Must start with / and not contain #
**Pattern:**`^/[^#\s]*$`
Max length:256

scope * array
Min items:1 Unique items
Array items:
item string
**Pattern:**`^[a-z]+:[0-9a-zA-Z\-]+:[0-9a-zA-Z\-]+$`

type array | null
Min items:1 Unique items
Array items:
item string
**Enum values:** `"app"`
`"user"`

ones_version object | null
max semanticVersion
Maximum compatible ONES version (e.g., v6.39.9)

min semanticVersion
Minimum compatible ONES version (e.g., v6.30.0)

version * semanticVersion

#### Definitions

##### extensionKey

string
Unique identifier for the extension in the app.
Min length:1 Max length:64

##### extensionUrlPath

string
Must start with /
**Pattern:**`^/[^\s?#]*([?][^\s#]*)?([#][^\s]*)?$`
Min length:1 Max length:256

##### httpUrl

string
Must start with http(s):// and not contain ? or #
**Format:**`uri`
**Pattern:**`^https?://[^\s?#]+$`
Max length:256

##### semanticVersion

string
Semantic version (e.g., v1.0.0)
**Pattern:**`^v\d+\.\d+\.\d+$`
Max length:32

##### urlPath

string
Must start with / and not contain #
**Pattern:**`^/[^#\s]*$`
Max length:256

Or use our [App Manifest Builder](https://docs.ones.cn/developer/guide/app_schema_validator/) to build the App manifest content.

## Add sample code and test the project

1. Add the following to `src/app.controller.ts` (specifically `@Get('/manifest')` and `@Post('/install_cb')` ).
The full file should look like this:

src/app.controller.ts

```typescript
import {
  Controller,
  Get,
  HttpException,
  HttpStatus,
  Post,
  Res,
  Body,
} from '@nestjs/common';
import type { Response } from 'express';
import { readFileSync } from 'fs';
import { join } from 'path';

@Controller()
export class AppController {
  constructor() {}
  @Get('')
  getHello(@Res() res: Response) {
    this.getManifest(res);
  }

  @Get('/manifest')
  getManifest(@Res() res: Response) {
    try {
      const manifestPath = join(process.cwd(), 'manifest.json');
      const manifestData = readFileSync(manifestPath, 'utf8');
      res.send(manifestData);
    } catch {
      throw new HttpException(
        'No manifest file',
        HttpStatus.INTERNAL_SERVER_ERROR,
      );
    }
  }

  @Post('/install_cb')
  handleInstallCB(@Body() requestBody: any, @Res() res: Response) {
    res.status(HttpStatus.OK).send('success');
  }
}
```

1. Install dependencies and run the project by executing `npm install` and `npm start` in the project directory.

```bash
❯ npm install
added 1 package, and audited 799 packages in 2s

153 packages are looking for funding
  run `npm fund` for details

found 0 vulnerabilities

❯ npm start
[Nest] *** LOG [NestFactory] Starting Nest application...
[Nest] *** LOG [InstanceLoader] AppModule dependencies initialized +9ms
[Nest] *** LOG [RoutesResolver] AppController {/}: +1ms
[Nest] *** LOG [RouterExplorer] Mapped {/, GET} route +1ms
[Nest] *** LOG [RouterExplorer] Mapped {/manifest, GET} route +0ms
[Nest] *** LOG [RouterExplorer] Mapped {/install_cb, POST} route +1ms
[Nest] *** LOG [NestApplication] Nest application successfully started +0ms
```

1. Test the project with `curl` .
Example/curl http://localhost:3000/manifest

```bash
❯ curl http://localhost:3000/manifest
{
    "id": "app_<your-app-id>",
    "name": "Test ONES App",
    "desc": "This is a test app",
    "version": "v0.0.1",
    "base_url": "",
    "auth": {
        "type": "jwt"
    },
    "lifecycle_callback": {
        "install": "/install_cb"
    }
}%
```

## Expose the app

1. Expose the app to the internet.
If you use ngrok, run the following command. The app will then be accessible at `https://your-app.ngrok.io` .

Example/expose the app to the internet

```bash
❯ ngrok http http://localhost:3000

Session Status                online
Version                       3.0.0
Region                        United States (us)
Web Interface                 http://127.0.0.1:4040
Forwarding                    https://your-app.ngrok.io -> http://localhost:3000
Connections                   ttl     opn     rt1     rt5     p50     p90
                              22      0       0.00    0.00    0.00    0.00
```

1. Update the `base_url` in the `manifest.json` file.
Example/manifest.json

```json
{
  "id": "app_<your-app-id>",
  "name": "Test ONES App",
  "desc": "This is a test app",
  "version": "v0.0.1",
  "base_url": "https://your-app.ngrok.io",
  "auth": {
    "type": "jwt"
  },
  "lifecycle_callback": {
    "install": "/install_cb"
  }
}
```

## Install and enable the app

> Note: Check you have the permission to install apps in your ONES organization.

1. Navigate to the ONES instance and find the **App Center** on the left sidebar.
2. Click the **App Center** to go to the **Installed apps** page.
3. Click the **Upload App** button and enter the URL of your `manifest` info( `https://your-app.ngrok.io/manifest` ), and **Confirm** .
![Upload App](https://docs.ones.cn/assets/images/upload-app-465091727210d1908ee40e8b2038af09.png)

1. Verify the app information, then click `Confirm` to install the app. ![App Information](https://docs.ones.cn/assets/images/upload-app-confirm-ddab99c59da66583b15f670f1bb19166.png)
2. The app will be installed and you can see it in the **Installed apps** page. After installation, the app appears in the list. Click it to view details.
3. Click the `Enable` button to enable the app. ![Enable App](https://docs.ones.cn/assets/images/app_enabled-3b09a6e8aed95e4549465469895e4644.png)

## Next steps

Choose a deployment target, either your own server or a cloud provider. Deploy your app, get a stable public URL, and update the `base_url` in `manifest.json` .
