# Add issue watchers

URL: https://docs.ones.cn/developer/openapi/api/01-add-issue-watcher

```
POST
## /project/issues/:issueID/watchers

```

Add issue watchers.

## History

| Version | Changes |
| --- | --- |
| v3.14.117, v3.15.26 | Added in: v3.14.117, v3.15.26 |

## Request

### Path Parameters

**issueID** stringrequired The ID of the issue

### Query Parameters

**teamID** stringrequired The team ID

- application/json

### Body

**required

** The users where need to add issue watchers

**watchers** string[] **Possible values:**`non-empty` and `<= 8 characters`

issue watchers

## Responses

- 200
- 401
- 403
- 404
- 500

Request successful.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** stringrequired The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

**errorData** object Error meta data for this request.

```json
[
  {
    "result": "SUCCESS"
  },
  {
    "result": "FAIL",
    "errorCode": "NotFound",
    "errorMsg": "NotFound issue"
  },
  {
    "result": "FAIL",
    "errorCode": "Internal server error",
    "errorMsg": "Internal server error"
  },
  {
    "result": "FAIL",
    "errorCode": "PermissionDenied",
    "errorMsg": "PermissionDenied view_tasks"
  },
  {
    "result": "FAIL",
    "errorCode": "InvalidParameter",
    "errorMsg": "InvalidParameter issueComment text empty"
  }
]
```

Returned if the authentication credentials are incorrect or missing.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Unauthorized",
  "errorMsg": "Access token is invalid"
}
```

Returns if the scope check fails.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Forbidden",
  "errorMsg": "Scope is invalid"
}
```

Returned if the resource object was not found.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "NotFound",
  "errorMsg": "Not Found"
}
```

Internal Server Error.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Internal Server Error",
  "errorMsg": "Internal Server Error"
}
```
