# Create a task

URL: https://docs.ones.cn/developer/openapi/api/01-create-convert-task

```
POST
## /wiki/convert/tasks

```

## History

| Version | Changes |
| --- | --- |
| v6.15.0 | Added in v6.15.0 |

Create an export task.

Different page types support different export formats, as follows:

| Page Type | Export Format |
| --- | --- |
| default | pdf,docx |
| collaboration | pdf,png,markdown |
| word | pdf,docx |
| excel | pdf,xlsx |
| ppt | pdf,pptx |
| collaborationPlugin | No restrictions, the supported formats are defined by the plugin |

## Request

### Query Parameters

**teamID** stringrequired The team ID

**requestUserID** string User ID, this parameter can only be passed when calling as an Oauth bot. It is used to perform operations as the specified user

- application/json

### Body

**required

**

**taskType** string **Possible values:** [ `ExportPage` ]

Task type

**payload

** object

Task parameters

oneOf

- MOD1

**pageID** string Page ID

**format** string **Possible values:** [ `pdf` , `png` , `docx` , `xlsx` , `pptx` , `markdown` ]

Export format

**hideTitle** boolean Whether to hide the title, valid when the format is png

**width** integer **Possible values:**`<= 2560`

**Default value:**`1280`

Image width, valid when the format is png

**height** integer **Possible values:**`<= 1600`

**Default value:**`800`

Image height, valid when the format is png

## Responses

- 200
- 401
- 403
- 404
- 500

Create successfully

- application/json

- Schema
- Example (from schema)

**Schema

**

**data

** object

**id** string Task ID

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

**errorData** object Error meta data for this request.

```json
{
  "data": {
    "id": "string"
  },
  "result": "string",
  "errorCode": "string",
  "errorMsg": "string",
  "errorData": {}
}
```

Returned if the authentication credentials are incorrect or missing.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Unauthorized",
  "errorMsg": "Access token is invalid"
}
```

Returns if the scope check fails.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Forbidden",
  "errorMsg": "Scope is invalid"
}
```

Returned if the resource object was not found.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "NotFound",
  "errorMsg": "Not Found"
}
```

Internal Server Error.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Internal Server Error",
  "errorMsg": "Internal Server Error"
}
```
