# Get a list of issue fields

URL: https://docs.ones.cn/developer/openapi/api/01-get-a-list-of-issue-fields

```
GET
## /project/issueFields

```

Get a list of issue fields.

## History

| Version | Changes |
| --- | --- |
| v3.14.117, v3.15.26 | Added in: v3.14.117, v3.15.26 |
| v6.30.0, v6.18.14 | Update the Default Value and Possible Values of the limit parameter, Change the buildIn field to builtIn |

## Notes

This API returns issue fields currently exposed by OpenAPI. Not all issue fields are guaranteed to appear in this list.

For the complete searchable field catalog, including newer field types introduced in 6.88+, use `GET /openapi/v2/project/searchIssueFields` .

If the target field is not listed here:

- Check `fieldValues` in `GET /openapi/v2/project/issues/{issueID}` — it may include the field.
- If you already know the `fieldID` , query its value via `POST /openapi/v3alpha/onesql/query` .

## Request

### Query Parameters

**teamID** stringrequired The team ID

**limit** integer **Possible values:**`<= 500`

**Default value:**`500`

The default value for the number of results to return in this request is 500. Values exceeding 500 or ≤0 will be reset to 500

**cursor** string The starting location of this request

## Responses

- 200
- 401
- 403
- 404
- 500

Request is successful.

- application/json

- Schema
- Example (from schema)

**Schema

**

**data

** object

Data object containing a list of items and page information.

**list

** object[]

List of items.

- Array [
**name** string Name of the item.

**id** string ID of the item.

**builtIn** boolean Flag indicating if the item is built-in.

**createTime** integer Timestamp of item creation.

**defaultValue** object Default value of the item.

**aliases** string[] List of aliases for the item.

**typeLabel** string Label for the item type.

**typeEnum** integer Enumeration value for the item type.

**options

** object[]

List of options for the item.

- Array [
**id** string ID of the option.

**value** object Value of the option.

- ]

- ]

**pageInfo

** object

Page information.

**count** integer The number returned this time.

**endCursor** string The last cursor on this page is generally used to turn pages.

**hasNextPage** boolean Is there a next page.

**startCursor** string The first cursor on this page is generally used to turn pages.

**totalCount** integer The total number of items available in the entire collection, including those that are returned in the current response.

**result** stringrequired The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

**errorData** object Error meta data for this request.

```json
[
  {
    "result": "SUCCESS",
    "data": {
      "list": [
        {
          "name": "string",
          "id": "string",
          "buildIn": true,
          "createTime": 0,
          "defaultValue": {},
          "aliases": [
            "string"
          ],
          "typeLabel": "string",
          "typeEnum": 0,
          "options": [
            {
              "id": "string",
              "value": {}
            }
          ]
        }
      ],
      "pageInfo": {
        "count": 2,
        "endCursor": "sample_end_cursor",
        "hasNextPage": false,
        "startCursor": "sample_start_cursor",
        "totalCount": 2
      }
    }
  },
  {
    "result": "FAIL",
    "errorCode": "MissingParameter",
    "errorMsg": "MissingParameter teamID"
  },
  {
    "result": "FAIL",
    "errorCode": "MissingParameter",
    "errorMsg": "MissingParameter issueID"
  },
  {
    "result": "FAIL",
    "errorCode": "MissingParameter",
    "errorMsg": "MissingParameter user_id"
  },
  {
    "result": "FAIL",
    "errorCode": "InvalidParameter",
    "errorMsg": "InvalidParameter limit InvalidType"
  }
]
```

Returned if the authentication credentials are incorrect or missing.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Unauthorized",
  "errorMsg": "Access token is invalid"
}
```

Returns if the scope check fails.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Forbidden",
  "errorMsg": "Scope is invalid"
}
```

Returned if the resource object was not found.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "NotFound",
  "errorMsg": "Not Found"
}
```

Internal Server Error.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Internal Server Error",
  "errorMsg": "Internal Server Error"
}
```
