# Get a list of issues

URL: https://docs.ones.cn/developer/openapi/api/01-get-a-list-of-issues

```
GET
## /project/issues

```

Get a list of issues.

## History

| Version | Changes |
| --- | --- |
| v3.14.117, v3.15.26 | Added in: v3.14.117, v3.15.26 |
| v6.94.7 | The type field in fieldValues is optional (required in v6.94.6 and earlier). |

## Request

### Query Parameters

**teamID** stringrequired The team ID

**limit** integer **Possible values:**`<= 100`

**Default value:**`50`

The number returned by this request.The default value is 50, exceeding 100 will be truncated to 100

**cursor** string The starting location of this request

**projectID** string As a filter condition, the list only returns work items that are projectID, used in conjunction with issueTypeID.

**issueTypeID** string As a filter condition, the list only returns work items that are issueTypeID, used in conjunction with projectID.

## Responses

- 200
- 401
- 403
- 404
- 500

Request is successful.

- application/json

- Schema
- Example (from schema)

**Schema

**

**data

** object

**list

** object[]

- Array [
**assignee

** object

**id** string ID of the assignee.

**name** string Name of the assignee.

**createTime** integer CreateTime of the issue.

**dueDate** string Issue due date.

**timeEstimatedHour** integer Time estimated,unit is hour.

**issueType

** object

**id** string ID of the issue type.

**name** string Name of the issue type.

**title** string Title of the issue.

**number** integer Number of the issue.

**creator

** object

**id** string ID of the creator.

**name** string Name of the creator.

**parent

** object

**id** string Parent issue ID.

**name** string Parent issue title.

**priority

** object

**id** string ID of the priority.

**name** string Name of the priority.

**project

** object

**id** string Project ID of the issue.

**name** string Project name of the issue.

**timeRemainingHour** integer Time remaining,unit is hour. The data will be multiplied by 100,000 for display.

**sprint

** object

**id** string ID of the sprint.

**name** string Name of the sprint.

**status

** object

**id** string ID of the status.

**name** string Name of the status.

**category** string Category of the status.

**subIssueType

** object

**id** string ID of the sub issue type.

**name** string Name of the sub issue type.

**subIssueCount** integer Total sub issue.

**subIssueDoneCount** integer Total completed sub issue.

**subIssues

** object[]

- Array [
**id** string ID of the sub issue.

**name** string Name of the sub issue.

- ]

**totalTimeEstimatedHour** integer Total time estimated,unit is hour.

**timeSpentHour** integer Time spent,unit is hour.

**totalTimeRemainingHour** integer Total time remaining,unit is hour.

**id** string ID of the issue.

**attachments

** object[]

- Array [
**id** string ID of the attachment.

**name** string Name of the attachment.

**createTime** integer Create time of the attachment.

- ]

**fieldValues

** object[]

Custom fields from the issue detail form and a subset of system fields. Fields with empty values or unsupported types may be omitted; use ONESQL for more flexible queries.

- Array [
**fieldID** string Field identifier

**type** integer Field type (common types as examples):

- 1: Single Select
- 2: Text
- 3: Integer
- 4: Float
- 5: Date
- 6: Time
- 16: Multiple Select
- 19: Boolean

**value

** object

Field value. The data format varies according to the field type. Due to extensible types, please refer to the response data for specific formats

oneOf

- MOD1
- MOD2
- MOD3
- MOD4

string

integer

boolean

- Array [
- ]

- ]

- ]

**pageInfo

** object

Page information.

**count** integer The number returned this time.

**endCursor** string The last cursor on this page is generally used to turn pages.

**hasNextPage** boolean Is there a next page.

**startCursor** string The first cursor on this page is generally used to turn pages.

**totalCount** integer The total number of items available in the entire collection, including those that are returned in the current response.

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

**errorData** object Error meta data for this request.

```json
[
  {
    "result": "SUCCESS",
    "data": {
      "list": [
        {
          "assignee": {
            "id": "5f1b8a1b",
            "name": "test"
          },
          "createTime": 1595555555,
          "dueDate": 1595555555,
          "timeEstimatedHour": 1,
          "issueType": {
            "id": "9c6d4c01",
            "name": "test"
          },
          "title": "test",
          "number": 1,
          "creator": {
            "id": "5f1b8a1b",
            "name": "test"
          },
          "parent": {
            "id": "5f1b8a1b",
            "title": "test"
          },
          "priority": {
            "id": "9c6d4c01",
            "name": "test"
          },
          "project": {
            "id": "5f1b8a1b",
            "name": "test"
          },
          "timeRemainingHour": 1,
          "sprint": {
            "id": "5f1b8a1b",
            "name": "test"
          },
          "status": {
            "id": "5f1b8a1b",
            "name": "test",
            "category": "test"
          },
          "subIssueType": {
            "id": "5f1b8a1b",
            "name": "test"
          },
          "subIssueCount": 1,
          "subIssueDoneCount": 1,
          "subIssues": [
            {
              "id": "5f1b8a1b",
              "name": "test"
            }
          ],
          "totalTimeEstimatedHour": 1,
          "timeSpentHour": 1,
          "totalTimeRemainingHour": 1,
          "id": "5f1b8a1b",
          "attachments": [
            {
              "id": "5f1b8a1b",
              "name": "test",
              "createTime": 1595555555
            }
          ]
        }
      ],
      "pageInfo": {
        "count": 1,
        "endCursor": "sample_end_cursor",
        "hasNextPage": false,
        "startCursor": "sample_start_cursor",
        "totalCount": 1
      }
    }
  }
]
```

Returned if the authentication credentials are incorrect or missing.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Unauthorized",
  "errorMsg": "Access token is invalid"
}
```

Returns if the scope check fails.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Forbidden",
  "errorMsg": "Scope is invalid"
}
```

Returned if the resource object was not found.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "NotFound",
  "errorMsg": "Not Found"
}
```

Internal Server Error.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Internal Server Error",
  "errorMsg": "Internal Server Error"
}
```