# Get a list of test case libraries

URL: https://docs.ones.cn/developer/openapi/api/01-get-a-list-of-test-case-libraries

```
GET
## /testcase/libraries

```

Get a list of test case libraries.

## History

| Version | Changes |
| --- | --- |
| v3.14.117, v3.15.26 | Added in: v3.14.117, v3.15.26 |

## Request

### Query Parameters

**teamID** stringrequired The team ID

**limit** integer **Possible values:**`<= 100`

**Default value:**`50`

The number returned by this request.The default value is 50, exceeding 100 will be truncated to 100

**cursor** string The starting location of this request

## Responses

- 200
- 401
- 403
- 404
- 500

Request is successful.

- application/json

- Schema
- Example (from schema)

**Schema

**

**data

** object

**list

** object[]

- Array [
**name** string The name of the test case library.

**id** string The id of the test case library.

**createTime** integer The create time of the test case library.

**updateTime** integer The update time of the test case library.

**stickToTop** boolean Whether the test case library is at the top.

**testcaseFieldConfig

** object

Test case library project configuration information.

**name** string Test case library project configuration name.

**id** string Test case library configuration ID.

- ]

**pageInfo

** object

Page information.

**count** integer The number returned this time.

**endCursor** string The last cursor on this page is generally used to turn pages.

**hasNextPage** boolean Is there a next page.

**startCursor** string The first cursor on this page is generally used to turn pages.

**totalCount** integer The total number of items available in the entire collection, including those that are returned in the current response.

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

**errorData** object Error meta data for this request.

```json
[
  {
    "result": "SUCCESS",
    "data": {
      "list": [
        {
          "name": "Testcase Library",
          "id": "safia765",
          "createTime": 1616592000,
          "updateTime": 1616592000,
          "stickToTop": false,
          "testcaseFieldConfig": {
            "name": "Testcase Library",
            "id": "safia765"
          }
        }
      ],
      "pageInfo": {
        "count": 2,
        "endCursor": "sample_end_cursor",
        "hasNextPage": false,
        "startCursor": "sample_start_cursor",
        "totalCount": 2
      }
    }
  }
]
```

Returned if the authentication credentials are incorrect or missing.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Unauthorized",
  "errorMsg": "Access token is invalid"
}
```

Returns if the scope check fails.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Forbidden",
  "errorMsg": "Scope is invalid"
}
```

Returned if the resource object was not found.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "NotFound",
  "errorMsg": "Not Found"
}
```

Internal Server Error.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Internal Server Error",
  "errorMsg": "Internal Server Error"
}
```
