# Get space page tree

URL: https://docs.ones.cn/developer/openapi/api/01-get-space-page-list

```
GET
## /wiki/spaces/:spaceID/pages

```

## History

| Version | Changes |
| --- | --- |
| v6.2.16 | Added in: v6.2.16 |
| v6.12.0 | Detailed distinction between refType in response，add locked property |

Get page tree of the space.

## Request

### Path Parameters

**spaceID** stringrequired The space ID

### Query Parameters

**teamID** stringrequired The team ID

**requestUserID** string User ID, this parameter can only be passed when calling as an Oauth bot. It is used to perform operations as the specified user

**archived** boolean Default false, true: Get space archived page tree, false: Get space normal page tree

## Responses

- 200
- 401
- 403
- 404
- 500

Request is successful.

- application/json

- Schema
- Example (from schema)

**Schema

**

**data

** object

**pages

** object[]

- Array [
**id** string The page ID

**title** string The page title

**spaceID** string The space ID

**createdTime** integer The createdTime of page

**updatedTime** integer The updatedTime of page

**parentID** string The parent page ID

**refType** string The reference type

**refID** string The reference ID

**subRefType** string The sub reference type

**isArchived** boolean Whether the page is archived

**encryptStatus** string Encrypt status, none: not encrypted, encrypted: encrypted, readonly: readonly

**canEdit** boolean Whether the page is editable

**locked** boolean Whether the page is locked

- ]

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

**errorData** object Error meta data for this request.

```json
{
  "data": {
    "pages": [
      {
        "id": "string",
        "title": "string",
        "spaceID": "string",
        "createdTime": 0,
        "updatedTime": 0,
        "parentID": "string",
        "refType": "string",
        "refID": "string",
        "subRefType": "string",
        "isArchived": true,
        "encryptStatus": "string",
        "canEdit": true,
        "locked": true
      }
    ]
  },
  "result": "string",
  "errorCode": "string",
  "errorMsg": "string",
  "errorData": {}
}
```

Returned if the authentication credentials are incorrect or missing.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Unauthorized",
  "errorMsg": "Access token is invalid"
}
```

Returns if the scope check fails.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Forbidden",
  "errorMsg": "Scope is invalid"
}
```

Returned if the resource object was not found.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "NotFound",
  "errorMsg": "Not Found"
}
```

Internal Server Error.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Internal Server Error",
  "errorMsg": "Internal Server Error"
}
```
