# Get team space list

URL: https://docs.ones.cn/developer/openapi/api/01-get-team-space-list

```
GET
## /wiki/spaces

```

## History

| Version | Changes |
| --- | --- |
| v6.2.16 | Added in: v6.2.16 |

Get team space list.

## Request

### Query Parameters

**teamID** stringrequired The team ID

**requestUserID** string User ID, this parameter can only be passed when calling as an Oauth bot. It is used to perform operations as the specified user

## Responses

- 200
- 401
- 403
- 404
- 500

Request is successful.

- application/json

- Schema
- Example (from schema)

**Schema

**

**data

** object

**spaces

** object[]

- Array [
**id** string The space ID

**title** string The space name

**description** string The space description

**icon** string The space icon identifier

**homePageID** string The homepage ID

**createdTime** integer The createdTime of space

**updatedTime** integer The updatedTime of space

**creatorID** string The creator ID

**isOpenPublic** boolean Whether the space is allowed to share publicly

**isOpenShare** boolean Whether the space is allowed to share internally

**isPin** boolean Whether the space is pinned

**isOpenApproval** boolean Whether approval is enabled for the space

**unapprovedPageVisibleScope** integer Visibility scope for unapproved pages

- ]

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

**errorData** object Error meta data for this request.

```json
{
  "data": {
    "spaces": [
      {
        "id": "string",
        "title": "string",
        "description": "string",
        "icon": "string",
        "homePageID": "string",
        "createdTime": 0,
        "updatedTime": 0,
        "creatorID": "string",
        "isOpenPublic": true,
        "isOpenShare": true,
        "isPin": true,
        "isOpenApproval": true,
        "unapprovedPageVisibleScope": 0
      }
    ]
  },
  "result": "string",
  "errorCode": "string",
  "errorMsg": "string",
  "errorData": {}
}
```

Returned if the authentication credentials are incorrect or missing.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Unauthorized",
  "errorMsg": "Access token is invalid"
}
```

Returns if the scope check fails.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Forbidden",
  "errorMsg": "Scope is invalid"
}
```

Returned if the resource object was not found.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "NotFound",
  "errorMsg": "Not Found"
}
```

Internal Server Error.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Internal Server Error",
  "errorMsg": "Internal Server Error"
}
```
