# Get template list

URL: https://docs.ones.cn/developer/openapi/api/01-get-template-list

```
GET
## /wiki/templates

```

## History

| Version | Changes |
| --- | --- |
| v6.12.0 | Added in: v6.12.0 |

Get template list.

## Request

### Query Parameters

**teamID** stringrequired The team ID

**requestUserID** string User ID, this parameter can only be passed when calling as an Oauth bot. It is used to perform operations as the specified user

**contextType** stringrequired **Possible values:** [ `space` , `team` , `system` ]

Context Type.

**contextID** stringrequired Context ID.

**start** integerrequired The start index of the list

**limit** integerrequired The limit of the list, maximum 200

## Responses

- 200
- 401
- 403
- 404
- 500

Request is successful.

- application/json

- Schema
- Example (from schema)

**Schema

**

**data

** object

**templates

** object[]

- Array [
**id** string The template ID

**title** string The template title

**contextType** string The context type

**contextID** string The context ID

**refType** string The reference type

**refID** string The reference ID

**subRefType** string The sub reference type

**createdTime** integer The createdTime of template

**updatedTime** integer The updatedTime of template

- ]

**total** integer The total number of templates

**start** integer The start index of the list

**count** integer The number of templates in the list

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

**errorData** object Error meta data for this request.

```json
{
  "data": {
    "templates": [
      {
        "id": "string",
        "title": "string",
        "contextType": "string",
        "contextID": "string",
        "refType": "string",
        "refID": "string",
        "subRefType": "string",
        "createdTime": 0,
        "updatedTime": 0
      }
    ],
    "total": 0,
    "start": 0,
    "count": 0
  },
  "result": "string",
  "errorCode": "string",
  "errorMsg": "string",
  "errorData": {}
}
```

Returned if the authentication credentials are incorrect or missing.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Unauthorized",
  "errorMsg": "Access token is invalid"
}
```

Returns if the scope check fails.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Forbidden",
  "errorMsg": "Scope is invalid"
}
```

Returned if the resource object was not found.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "NotFound",
  "errorMsg": "Not Found"
}
```

Internal Server Error.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Internal Server Error",
  "errorMsg": "Internal Server Error"
}
```
