# Get the list of user groups

URL: https://docs.ones.cn/developer/openapi/api/01-get-user-group-list

```
GET
## /account/team/:teamUUID/userGroups

```

Get all available team user groups and their current members.

## History

| Version | Changes |
| --- | --- |
| v6.100.30, v7.0.17, v7.16.0 | Added in: v6.100.30, v7.0.17, v7.16.0 |

## Request

### Path Parameters

**teamUUID** stringrequired Team UUID

## Responses

- 200
- 401
- 403
- 404
- 500

Request successful

- application/json

- Schema
- Example (from schema)

**Schema

**

**data

** object

**list

** object[]

- Array [
**id** string User group ID

**name** string User group name

**description** string User group description

**createTime** int64 User group creation time in microseconds

**members** string[] Current member IDs

- ]

```json
{
  "data": {
    "list": [
      {
        "id": "3kekzuou",
        "name": "R&D On Call",
        "description": "Synced from external system",
        "createTime": 1730000000000000,
        "members": [
          "4MuvCPxa",
          "DFqmgaF7"
        ]
      }
    ]
  }
}
```

Returned if the authentication credentials are incorrect or missing.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Unauthorized",
  "errorMsg": "Access token is invalid"
}
```

Returns if the scope check fails.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Forbidden",
  "errorMsg": "Scope is invalid"
}
```

Returned if the resource object was not found.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "NotFound",
  "errorMsg": "Not Found"
}
```

Internal Server Error.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Internal Server Error",
  "errorMsg": "Internal Server Error"
}
```
