# Get user information in batches

URL: https://docs.ones.cn/developer/openapi/api/01-get-user-list

```
GET
## /account/users/batch

```

Get user information in batches (requires team administrator permissions). Use the team ID and user IDs to retrieve users in a specified team. Each request supports 1–100 users.

## History

| Version | Changes |
| --- | --- |
| v6.0.44 | Added in: v6.0.44 |

## Request

### Query Parameters

**teamID** stringrequired The team ID

**ids** string[]required **数量限制：**`1–100 个`

User ID Repeat the `ids` query parameter for each ID, for example, `ids=userID1&ids=userID2` .

## Responses

- 200
- 401
- 403
- 404
- 500

Request successful

- application/json

- Schema
- Example (from schema)

**Schema

**

**data

** object[]

- Array [
**id** string User id

**email** string Email

**name** string Username

**phone** string Mobile number

**avatar** string User avatar

**organization** string Company name

**staffID** string Staff number

**position** string Position

**status** string **Possible values:** [ `normal` , `disable` , `pending` ]

User status

- ]

```json
{
  "data": [
    {
      "id": "2oF4mAeA",
      "email": "blue@ones.cn",
      "name": "blue",
      "phone": "+860000000000",
      "avatar": "/api/project/file/avatar/Fu-Dl5d3F0EUZOe1UUxU1EEsL2Dv",
      "organization": "ONES",
      "staffID": "000001",
      "position": "Software Engineer",
      "status": "normal"
    }
  ]
}
```

Returned if the authentication credentials are incorrect or missing.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Unauthorized",
  "errorMsg": "Access token is invalid"
}
```

Returns if the scope check fails.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Forbidden",
  "errorMsg": "Scope is invalid"
}
```

Returned if the resource object was not found.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "NotFound",
  "errorMsg": "Not Found"
}
```

Internal Server Error.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Internal Server Error",
  "errorMsg": "Internal Server Error"
}
```
