# Create an async project copy task

URL: https://docs.ones.cn/developer/openapi/api/02-a-create-project-copy-task

```
POST
## /project/projectCopies

```

Create an async task for copying a project. The request is validated synchronously. If validation succeeds, the API returns only the task snapshot and does not return the new project directly.

## History

| Version | Changes |
| --- | --- |
| v7.0.5 | Added in: v7.0.5 |

## Request

### Query Parameters

**teamID** stringrequired The team ID

- application/json

### Body

**required

** Copy project request param

**sourceProjectID** stringrequired The source project ID

**name** stringrequired The target project name

**identifier** stringrequired The target project identifier

**icon** stringrequired The target project icon

**programID** string The target program ID

**issueTypeIDs** string[] The issue type IDs to copy

**options** string[] The content ranges to copy. Supported values include `sprint` , `member` , `plan` , `attachment` , `milestone` , `report` , `deliverable` , `roadmap` , `wipKanban` , and `directoryAndSpace` .

**members** string[] The member IDs used when `options` does not contain `member`

## Responses

- 200
- 401
- 403
- 404
- 500

Request is successful.

- application/json

- Schema
- Example (from schema)

**Schema

**

**data

** object

**jobID** string The async task ID

**jobType** string The async task type

**status** string **Possible values:** [ `pending` , `running` , `success` , `failed` , `interrupted` ]

The task status

**startTime** integer The task start time in Unix seconds

**endTime** integer The task end time in Unix seconds

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

**errorData** object Error meta data for this request.

```json
{
  "data": {
    "result": "SUCCESS",
    "data": {
      "jobID": "Uce2cgPP",
      "jobType": "copy_project",
      "status": "running",
      "startTime": 1713686400,
      "endTime": 0
    }
  },
  "result": "string",
  "errorCode": "string",
  "errorMsg": "string",
  "errorData": {}
}
```

Returned if the authentication credentials are incorrect or missing.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Unauthorized",
  "errorMsg": "Access token is invalid"
}
```

Returns if the scope check fails.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Forbidden",
  "errorMsg": "Scope is invalid"
}
```

Returned if the resource object was not found.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "NotFound",
  "errorMsg": "Not Found"
}
```

Internal Server Error.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Internal Server Error",
  "errorMsg": "Internal Server Error"
}
```
