# Grant Application for an individual user.

URL: https://docs.ones.cn/developer/openapi/api/02-app-grant-user

```
POST
## /appcenter/apps/grantUser

```

Grant Application for an individual user(requires organizational administrator permissions)

## History

| Version | Changes |
| --- | --- |
| v6.0.？ | Added in: v6.0.？ |

## Request

- application/json

### Body

**userID** stringrequired user's id

**appIDs** string[]required list of app ids

## Responses

- 200
- 401
- 403
- 404
- 500

Request successful

- application/json

- Schema
- Example (from schema)

**Schema

**

**errorCode** string error code

| InvalidParameter | invalid parameter |
| MissingParameter | missing parameter |
| PermissionDenied | no permission |
|
| NotFoundUser | user not found |
| NotFoundApp | app not found |
| NotFoundAppLicenseOrExpired | app license not found or license expired |
| LicenseLimited | license limit |
| UnsupportedGrant | grant for the app is unsupported |

**result** string The result of this request.

**errorMsg** string Error message for this request.

**errorData** object Error meta data for this request.

```json
{
  "errorCode": "string",
  "result": "string",
  "errorMsg": "string",
  "errorData": {}
}
```

Returned if the authentication credentials are incorrect or missing.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Unauthorized",
  "errorMsg": "Access token is invalid"
}
```

Returns if the scope check fails.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Forbidden",
  "errorMsg": "Scope is invalid"
}
```

Returned if the resource object was not found.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "NotFound",
  "errorMsg": "Not Found"
}
```

Internal Server Error.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Internal Server Error",
  "errorMsg": "Internal Server Error"
}
```
