# Get the list of project field definitions under the team

URL: https://docs.ones.cn/developer/openapi/api/02-b-get-team-project-field-list

```
GET
## /project/projectFields

```

Get all valid built-in and custom project field definitions under the team. The response is team-scoped and does not filter by single-project access.

## History

| Version | Changes |
| --- | --- |
| v7.0.5 | Added in: v7.0.5 |

## Request

### Query Parameters

**teamID** stringrequired The team ID

## Responses

- 200
- 401
- 403
- 404
- 500

Request is successful.

- application/json

- Schema
- Example (from schema)

**Schema

**

**data

** object

**fields

** object[]

- Array [
**aliases** string[] Field aliases

**builtIn** boolean Whether the field is a built-in system field

**typeLabel** string The field type label

**name** string The field name

**id** string The field ID

**options

** object[]

The normalized options for option and status fields

- Array [
**id** string

**value** string

- ]

- ]

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

**errorData** object Error meta data for this request.

```json
{
  "data": {
    "fields": [
      {
        "id": "fieldProj001",
        "aliases": [
          "status"
        ],
        "name": "Project Status",
        "typeLabel": "status",
        "builtIn": true,
        "options": [
          {
            "id": "todo",
            "value": "To Do"
          }
        ]
      },
      {
        "id": "fieldProj018",
        "aliases": [
          "budget"
        ],
        "name": "Budget",
        "typeLabel": "number",
        "builtIn": false
      }
    ]
  },
  "result": "string",
  "errorCode": "string",
  "errorMsg": "string",
  "errorData": {}
}
```

Returned if the authentication credentials are incorrect or missing.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Unauthorized",
  "errorMsg": "Access token is invalid"
}
```

Returns if the scope check fails.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Forbidden",
  "errorMsg": "Scope is invalid"
}
```

Returned if the resource object was not found.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "NotFound",
  "errorMsg": "Not Found"
}
```

Internal Server Error.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Internal Server Error",
  "errorMsg": "Internal Server Error"
}
```
