# Create a new project

URL: https://docs.ones.cn/developer/openapi/api/02-create-a-new-project

```
POST
## /project/projects

```

Create a new project.

## History

| Version | Changes |
| --- | --- |
| v3.14.117, v3.15.26 | Added in: v3.14.117, v3.15.26 |

## Request

### Query Parameters

**teamID** stringrequired The team ID

- application/json

### Body

**required

** Create project request param

**name** stringrequired **Possible values:**`non-empty` and `<= 128 characters`

The name of project

**templateID** string **Possible values:** [ `project-t1` , `project-t2` , `project-t4` , `project-t5` , `project-t6` , `comagile` , `comwater` ]

- Project template ID
- project-t1: Agile project management.
- project-t2: General task management.
- project-t4: Waterfall project planning.
- project-t5: Agile project management_v2.
- project-t6: Kanban task management.
- comagile: Agile project management.
- comwater: Waterfall project planning.

**members** string[] Project project-member IDs

## Responses

- 200
- 401
- 403
- 404
- 500

Request is successful.

- application/json

- Schema
- Example (from schema)

**Schema

**

**data

** object

**id** string The project ID

**name** string The project name

**owner** string The project owner ID

**status** string The ID of project status

**statusCategory** string The category of project status

**stickToTop** boolean Whether the project is at the top

**isArchive** boolean Archived project or not

**archiveTime** integer Time when the project was archived

**archiveUser** string The ID of people who archived project

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

**errorData** object Error meta data for this request.

```json
[
  {
    "result": "SUCCESS",
    "data": {
      "id": "5f1b0b5b",
      "name": "project1",
      "owner": "1b2b2b29",
      "status": "to_do",
      "statusCategory": "to_do",
      "stickToTop": false,
      "isArchive": false,
      "archiveTime": 1691726809,
      "archiveUser": "5h2b2b29"
    }
  },
  {
    "result": "FAIL",
    "errorCode": "InvalidParameter",
    "errorMsg": "invalid project members"
  },
  {
    "result": "FAIL",
    "errorCode": "PermissionDenied",
    "errorMsg": "PermissionDenied add_project"
  },
  {
    "result": "FAIL",
    "errorCode": "MissingParameter",
    "errorMsg": "MissingParameter Project"
  },
  {
    "result": "FAIL",
    "errorCode": "InvalidParameter",
    "errorMsg": "InvalidParameter Project UUID Empty"
  },
  {
    "result": "FAIL",
    "errorCode": "InvalidParameter",
    "errorMsg": "InvalidParameter Project Member InvalidFormat"
  }
]
```

Returned if the authentication credentials are incorrect or missing.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Unauthorized",
  "errorMsg": "Access token is invalid"
}
```

Returns if the scope check fails.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Forbidden",
  "errorMsg": "Scope is invalid"
}
```

Returned if the resource object was not found.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "NotFound",
  "errorMsg": "Not Found"
}
```

Internal Server Error.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Internal Server Error",
  "errorMsg": "Internal Server Error"
}
```
