# Create a new test case library

URL: https://docs.ones.cn/developer/openapi/api/02-create-a-new-test-case-library

```
POST
## /testcase/libraries

```

Create a new test case library.

## History

| Version | Changes |
| --- | --- |
| v3.14.117, v3.15.26 | Added in: v3.14.117, v3.15.26 |

## Request

### Query Parameters

**teamID** stringrequired The team ID

- application/json

### Body

**required

** The test case library information to be created.

**caseFieldConfigurationID** string **Possible values:**`non-empty` and `<= 8 characters`

The id of the test case library project configuration.

**name** string **Possible values:**`non-empty` and `<= 32 characters`

The name of the test case library.

## Responses

- 200
- 401
- 403
- 404
- 500

Request is successful.

- application/json

- Schema
- Example (from schema)

**Schema

**

**data

** object

**name** string The name of the test case library.

**id** string The id of the test case library.

**createTime** integer The create time of the test case library.

**updateTime** integer The update time of the test case library.

**stickToTop** boolean Whether the test case library is at the top.

**caseFieldConfigurationID** string Test case library configuration ID.

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

**errorData** object Error meta data for this request.

```json
[
  {
    "result": "SUCCESS",
    "data": {
      "name": "Testcase Library",
      "id": "safia765",
      "createTime": 1616592000,
      "updateTime": 1616592000,
      "stickToTop": false,
      "caseFieldConfigurationID": "safia765"
    }
  },
  {
    "result": "FAIL",
    "errorCode": "PermissionDenied",
    "errorMsg": "PermissionDenied manage_library"
  },
  {
    "result": "FAIL",
    "errorCode": "NotFound",
    "errorMsg": "NotFound caseFieldConfigurationID"
  },
  {
    "result": "FAIL",
    "errorCode": "InvalidParameter",
    "errorMsg": "InvalidParameter TestCaseLibrary Library Empty"
  },
  {
    "result": "FAIL",
    "errorCode": "InvalidParameter",
    "errorMsg": "InvalidParameter TestCaseLibrary Name TooLong"
  },
  {
    "result": "FAIL",
    "errorCode": "InvalidParameter",
    "errorMsg": "InvalidParameter TestCaseLibrary caseFieldConfigurationID InvalidFormat"
  }
]
```

Returned if the authentication credentials are incorrect or missing.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Unauthorized",
  "errorMsg": "Access token is invalid"
}
```

Returns if the scope check fails.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Forbidden",
  "errorMsg": "Scope is invalid"
}
```

Returned if the resource object was not found.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "NotFound",
  "errorMsg": "Not Found"
}
```

Internal Server Error.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Internal Server Error",
  "errorMsg": "Internal Server Error"
}
```
