# Create a user group

URL: https://docs.ones.cn/developer/openapi/api/02-create-user-group

```
POST
## /account/team/:teamUUID/userGroups

```

Create a new team user group. Duplicate names are allowed within the same team.

## History

| Version | Changes |
| --- | --- |
| v6.100.30, v7.0.17, v7.16.0 | Added in: v6.100.30, v7.0.17, v7.16.0 |

## Request

### Path Parameters

**teamUUID** stringrequired Team UUID

- application/json

### Body

**required

**

**name** stringrequired **Possible values:**`<= 256 characters`

User group name; must contain 1 to 256 Unicode code points after trimming leading and trailing whitespace.

**description** string **Possible values:**`<= 1024 characters`

User group description

**members** string[] Initial member IDs

## Responses

- 200
- 401
- 403
- 404
- 500

Request successful

- application/json

- Schema
- Example (from schema)

**Schema

**

**data

** object

**id** string User group ID

**name** string User group name

**description** string User group description

**createTime** int64 User group creation time in microseconds

**members** string[] Current member IDs

```json
{
  "data": {
    "id": "3kekzuou",
    "name": "R&D On Call",
    "description": "Synced from external system",
    "createTime": 1730000000000000,
    "members": [
      "4MuvCPxa",
      "DFqmgaF7"
    ]
  }
}
```

Returned if the authentication credentials are incorrect or missing.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Unauthorized",
  "errorMsg": "Access token is invalid"
}
```

Returns if the scope check fails.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Forbidden",
  "errorMsg": "Scope is invalid"
}
```

Returned if the resource object was not found.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "NotFound",
  "errorMsg": "Not Found"
}
```

Internal Server Error.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Internal Server Error",
  "errorMsg": "Internal Server Error"
}
```
