# Get project module list

URL: https://docs.ones.cn/developer/openapi/api/02-d-get-project-module-list

```
GET
## /project/projectModules

```

Read all visible modules at every level of one project as a flat list, without pagination, silent truncation or taskCount. projectID must be exactly one valid 16-character project UUID, not the project display code. A GET request body cannot replace query parameters. Missing, empty or whitespace-only values return MissingParameter. Repeated projectID parameters, multiple IDs, array text, literal null, invalid characters or incorrect length return InvalidParameter. Providing only projectID[] is treated as a missing projectID. Surrounding whitespace is trimmed before validating a single value. Invalid requests never broaden the query scope. Personal credentials use the user's project browsing permissions. Organization credentials act as a super administrator only within the authorized organization; access never extends to another organization. An empty project or a syntactically valid but nonexistent project returns an empty array. Modules from another team are never returned. Archived projects and users without browse permission follow the equivalent internal query behavior. The list preserves internal query order; it is not guaranteed to match the UI display order. Use parent.uuid and path to reconstruct the hierarchy. The path joins module UUIDs from root to current module with hyphens. position is unchanged and updateTime is a millisecond timestamp. Root modules have parent.uuid="". Unassigned modules have assign.uuid="", with name and avatar set to null. Empty descriptions remain "". Business errors may return HTTP 200 with result=FAIL, so always check result. Failed responses contain no module data. Gateway authentication, scope and rate-limit errors retain the existing HTTP statuses and error structures. Example request: GET /openapi/v2/project/projectModules?teamID=WSNGZjZK&projectID=RLmQa4hLCRByRZk7 with `Authorization: Bearer <access_token>` .

## Request

### Query Parameters

**teamID** stringrequired The team ID

**projectID** stringrequired **Possible values:**`>= 16 characters` and `<= 16 characters`

One nonempty 16-character project UUID; provide the parameter exactly once.

**Example:** RLmQa4hLCRByRZk7

## Responses

- 200
- 401
- 403
- 404
- 500

Success or business failure; check result.

- application/json

- Schema
- Example (from schema)
- modules
- empty
- missingProjectID
- invalidProjectID

**Schema

**

oneOf

- ListProjectModulesSuccessResponse
- ListProjectModulesFailureResponse

**result** stringrequired **Possible values:** [ `SUCCESS` ]

**data

** object

required

**list

** object[]

required

- Array [
**key** stringrequired Full module object key.

**uuid** stringrequired Module UUID; the field name remains uuid.

**name** stringrequired

**position** int64required Original internal position without scaling or reordering.

**path** stringrequired Hyphen-separated module UUIDs from root to current module.

**updateTime** int64required Update time as a millisecond timestamp.

**assign

** object

required

**uuid** stringrequired

**name** stringnullable required

**avatar** stringnullable required

**description** stringrequired

**parent

** object

required

**uuid** stringrequired Parent module UUID; empty string for a root module.

- ]

**result** stringrequired **Possible values:** [ `FAIL` ]

**errorCode** stringrequired

**errorMsg** stringrequired

```json
{}
```

```json
{
  "result": "SUCCESS",
  "data": {
    "list": [
      {
        "key": "project_module-PTWD5mkM",
        "uuid": "PTWD5mkM",
        "name": "Root",
        "position": 0,
        "path": "PTWD5mkM",
        "updateTime": 1788917537234,
        "assign": {
          "uuid": "",
          "name": null,
          "avatar": null
        },
        "description": "",
        "parent": {
          "uuid": ""
        }
      },
      {
        "key": "project_module-7WZDnG4y",
        "uuid": "7WZDnG4y",
        "name": "Child",
        "position": 100000,
        "path": "PTWD5mkM-7WZDnG4y",
        "updateTime": 1788917537234,
        "assign": {
          "uuid": "",
          "name": null,
          "avatar": null
        },
        "description": "",
        "parent": {
          "uuid": "PTWD5mkM"
        }
      }
    ]
  }
}
```

```json
{
  "result": "SUCCESS",
  "data": {
    "list": []
  }
}
```

```json
{
  "result": "FAIL",
  "errorCode": "MissingParameter",
  "errorMsg": "MissingParameter projectID"
}
```

```json
{
  "result": "FAIL",
  "errorCode": "InvalidParameter",
  "errorMsg": "InvalidParameter projectID invalidFormat"
}
```

Returned if the authentication credentials are incorrect or missing.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Unauthorized",
  "errorMsg": "Access token is invalid"
}
```

Returns if the scope check fails.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Forbidden",
  "errorMsg": "Scope is invalid"
}
```

Returned if the resource object was not found.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "NotFound",
  "errorMsg": "Not Found"
}
```

Internal Server Error.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Internal Server Error",
  "errorMsg": "Internal Server Error"
}
```
