# Execute workflow for issue

URL: https://docs.ones.cn/developer/openapi/api/02-execute-workflow-for-issue

```
POST
## /project/issues/:issueID

```

Execute workflow for issue.

Use this operation to update the issue status. First query the executable workflows by using `GET /project/issues/{issueID}?action=executableWorkflow` , then pass the selected workflow `id` to this operation. The general update-issue operation does not update the issue status.

Business validation failures are returned with HTTP 200 and `result: FAIL` . Check `result` , `errorCode` , and `errorMsg` to determine whether the workflow succeeded. A single related-issue field supports at most 5000 effective related issues. Exceeding this limit rejects the transition with `errorCode: LimitExceeded` and `errorMsg: LimitExceeded relatedTask` ; the limit and rejection behavior are unchanged. When validation reports multiple business reasons, one stable primary reason is returned: issues are ordered by ID, fields within each issue by field ID, followed by the issue-level reason. Unknown errors, server failures, and hidden plugin errors still return a generic server error.

## History

| Version | Changes |
| --- | --- |
| v3.14.117, v3.15.26 | Added in: v3.14.117, v3.15.26 |

## Request

### Path Parameters

**issueID** stringrequired The issue ID

### Query Parameters

**teamID** stringrequired The team ID

**action** stringrequired
- action: Actions on issue,support `executeWorkflow` .

- application/json

### Body

**required

** The issue workflow information to update

**id** stringrequired **Possible values:**`non-empty` and `<= 8 characters`

The ID of the specific issue workflow transition to execute, including its configured post functions. When multiple transitions share the same start and end statuses, this ID selects the transition.

**fieldValues

** object[]

The fieldValues of the issue project.

- Array [
**fieldID** stringrequired **Possible values:**`>= 8 characters`

The ID of fieldValue.

**type** integer **Possible values:**`>= 1`

The type of fieldValue (required in v6.94.6 and earlier).

**value** objectrequired The value of fieldValue.

- ]

**linkedWikiPages

** object[]

nullable

Wiki pages to associate with the issue, supplied as a complete replacement list. Omit this property or set it to null to request no Wiki association update. An empty array explicitly clears all associations. A non-empty array replaces all associations, ordered by ascending position. The server may normalize stored positions; the supplied position values determine order and are not preserved verbatim. Workflow actions, form defaults, and plugins can still modify associations according to their configuration.

- Array [
**id** stringrequired **Possible values:**`>= 8 characters` and `<= 8 characters`

The Wiki page ID (8 characters after trimming whitespace).

**position** int64required The non-negative position used to order the Wiki pages.

- ]

**resources

** object[]

Attachment ids to be associated, separated by commas.

- Array [
**id** string

- ]

**comment

** object[]

The comment of the issue.

- Array [
**contentType** integerrequired **Possible values:**`>= 1`

The contentType of comment.

**text** stringrequired The text of comment.

- ]

**timeEstimated

** object

The timeEstimated of the issue.

**hours** integer

**timeSpent

** object[]

The timeSpent of the issue.

- Array [
**owner** stringrequired The owner of timeSpent.

**startTime** integerrequired The startTime of timeSpent.

**hours** integerrequired The hours of timeSpent.

**description** string The description of timeSpent.

- ]

## Responses

- 200
- 401
- 403
- 404
- 500

Request is successful.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

**errorData** object Error meta data for this request.

```json
[
  {
    "result": "SUCCESS"
  },
  {
    "result": "FAIL",
    "errorCode": "NotFound",
    "errorMsg": "NotFound issue"
  },
  {
    "result": "FAIL",
    "errorCode": "NotFound",
    "errorMsg": "NotFound parentissue"
  },
  {
    "result": "FAIL",
    "errorCode": "LimitExceeded",
    "errorMsg": "LimitExceeded relatedTask"
  },
  {
    "result": "FAIL",
    "errorCode": "MissingParameter",
    "errorMsg": "MissingParameter workflow manhour"
  },
  {
    "result": "FAIL",
    "errorCode": "MissingParameter",
    "errorMsg": "MissingParameter workflow attachment"
  },
  {
    "result": "FAIL",
    "errorCode": "MissingParameter",
    "errorMsg": "MissingParameter workflow comment"
  },
  {
    "result": "FAIL",
    "errorCode": "MissingParameter",
    "errorMsg": "MissingParameter workflow relatedwikiPage"
  },
  {
    "result": "FAIL",
    "errorCode": "MissingParameter",
    "errorMsg": "MissingParameter workflow assign"
  },
  {
    "result": "FAIL",
    "errorCode": "MissingParameter",
    "errorMsg": "MissingParameter workflow fieldvalue"
  },
  {
    "result": "FAIL",
    "errorCode": "MissingParameter",
    "errorMsg": "MissingParameter workflow fieldValue"
  }
]
```

Returned if the authentication credentials are incorrect or missing.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Unauthorized",
  "errorMsg": "Access token is invalid"
}
```

Returns if the scope check fails.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Forbidden",
  "errorMsg": "Scope is invalid"
}
```

Returned if the resource object was not found.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "NotFound",
  "errorMsg": "Not Found"
}
```

Internal Server Error.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Internal Server Error",
  "errorMsg": "Internal Server Error"
}
```
