# Get task status

URL: https://docs.ones.cn/developer/openapi/api/02-get-convert-task-info

```
GET
## /wiki/convert/tasks/:taskID/info

```

## History

| Version | Changes |
| --- | --- |
| v6.15.0 | Added in v6.15.0 |

Get the task status.

## Request

### Path Parameters

**taskID** stringrequired Task ID

### Query Parameters

**teamID** stringrequired The team ID

**requestUserID** string User ID, this parameter can only be passed when calling as an Oauth bot. It is used to perform operations as the specified user

## Responses

- 200
- 401
- 403
- 404
- 500

Get successfully

- application/json

- Schema
- Example (from schema)

**Schema

**

**status** string **Possible values:** [ `Pending` , `Processing` , `Success` , `Failed` ]

Task status

**message** stringnullable Task text information

**file

** object

nullable

Task result file

**name** string File name

**size** int64 File size

**expireAt** int64 File expiration time

**data** objectnullable Task extra information

```json
{
  "status": "Pending",
  "message": "string",
  "file": {
    "name": "string",
    "size": 0,
    "expireAt": 0
  },
  "data": {}
}
```

Returned if the authentication credentials are incorrect or missing.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Unauthorized",
  "errorMsg": "Access token is invalid"
}
```

Returns if the scope check fails.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Forbidden",
  "errorMsg": "Scope is invalid"
}
```

Returned if the resource object was not found.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "NotFound",
  "errorMsg": "Not Found"
}
```

Internal Server Error.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Internal Server Error",
  "errorMsg": "Internal Server Error"
}
```
