# Get page detail by page ID

URL: https://docs.ones.cn/developer/openapi/api/02-get-page-detail

```
GET
## /wiki/pages/:pageID

```

## History

| Version | Changes |
| --- | --- |
| v6.2.16 | Added in: v6.2.16 |
| v6.12.0 | Detailed distinction between refType in response，add locked property |

Get page detail by page ID.

## Request

### Path Parameters

**pageID** stringrequired The page ID

### Query Parameters

**teamID** stringrequired The team ID

**requestUserID** string User ID, this parameter can only be passed when calling as an Oauth bot. It is used to perform operations as the specified user

## Responses

- 200
- 401
- 403
- 404
- 500

Request is successful.

- application/json

- Schema
- Example (from schema)

**Schema

**

**data

** object

**id** string The page ID

**title** string The page title

**spaceID** string The space ID

**createdTime** integer The createdTime of page

**updatedTime** integer The updatedTime of page

**parentID** string The parent page ID

**refType** string The reference type

**refID** string The reference ID

**subRefType** string The sub reference type

**isArchived** boolean Whether the page is archived

**encryptStatus** string Encrypt status, none: not encrypted, encrypted: encrypted, readonly: readonly

**canEdit** boolean Whether the page is editable

**locked** boolean Whether the page is locked

**creatorID** string The creator ID.

**modifierID** string The modifier ID.

**content** string The content of page

**isFavorite** boolean Favorite status

**token** string The token of page, only collaboration page has the property.It is used to connect to edit server

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

**errorData** object Error meta data for this request.

```json
{
  "data": {
    "id": "string",
    "title": "string",
    "spaceID": "string",
    "createdTime": 0,
    "updatedTime": 0,
    "parentID": "string",
    "refType": "string",
    "refID": "string",
    "subRefType": "string",
    "isArchived": true,
    "encryptStatus": "string",
    "canEdit": true,
    "locked": true,
    "creatorID": "string",
    "modifierID": "string",
    "content": "string",
    "isFavorite": true,
    "token": "string"
  },
  "result": "string",
  "errorCode": "string",
  "errorMsg": "string",
  "errorData": {}
}
```

Returned if the authentication credentials are incorrect or missing.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Unauthorized",
  "errorMsg": "Access token is invalid"
}
```

Returns if the scope check fails.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Forbidden",
  "errorMsg": "Scope is invalid"
}
```

Returned if the resource object was not found.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "NotFound",
  "errorMsg": "Not Found"
}
```

Internal Server Error.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Internal Server Error",
  "errorMsg": "Internal Server Error"
}
```
