# Get template detail by template ID

URL: https://docs.ones.cn/developer/openapi/api/02-get-template-detail

```
GET
## /wiki/templates/:templateID

```

## History

| Version | Changes |
| --- | --- |
| v6.12.0 | Added in: v6.12.0 |

Get template detail by template ID.

## Request

### Path Parameters

**templateID** stringrequired The template ID.

### Query Parameters

**teamID** stringrequired The team ID

**requestUserID** string User ID, this parameter can only be passed when calling as an Oauth bot. It is used to perform operations as the specified user

## Responses

- 200
- 401
- 403
- 404
- 500

Request is successful.

- application/json

- Schema
- Example (from schema)

**Schema

**

**data

** object

**id** string The template ID

**title** string The template title

**contextType** string The context type

**contextID** string The context ID

**refType** string The reference type

**refID** string The reference ID

**subRefType** string The sub reference type

**createdTime** integer The createdTime of template

**updatedTime** integer The updatedTime of template

**content** string The content of template, only available when the template is a collaboration or default type.

**token** string The token of template, only available when the template is a collaboration type.

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

**errorData** object Error meta data for this request.

```json
{
  "data": {
    "id": "string",
    "title": "string",
    "contextType": "string",
    "contextID": "string",
    "refType": "string",
    "refID": "string",
    "subRefType": "string",
    "createdTime": 0,
    "updatedTime": 0,
    "content": "string",
    "token": "string"
  },
  "result": "string",
  "errorCode": "string",
  "errorMsg": "string",
  "errorData": {}
}
```

Returned if the authentication credentials are incorrect or missing.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Unauthorized",
  "errorMsg": "Access token is invalid"
}
```

Returns if the scope check fails.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Forbidden",
  "errorMsg": "Scope is invalid"
}
```

Returned if the resource object was not found.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "NotFound",
  "errorMsg": "Not Found"
}
```

Internal Server Error.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Internal Server Error",
  "errorMsg": "Internal Server Error"
}
```
