# Search spaces

URL: https://docs.ones.cn/developer/openapi/api/02-search-space

```
GET
## /wiki/search/spaces

```

## History

| Version | Changes |
| --- | --- |
| v6.2.16 | Added in: v6.2.16 |
| v6.43.0 | Added the following fields to the Responses' Schema: description, icon, pageCount, updatedTime |

Search spaces.

## Request

### Query Parameters

**teamID** stringrequired The team ID

**requestUserID** string User ID, this parameter can only be passed when calling as an Oauth bot. It is used to perform operations as the specified user

**limit** integer **Possible values:**`<= 100`

**Default value:**`50`

The number returned by this request.The default value is 50, exceeding 100 will be truncated to 100

**cursor** string The starting location of this request

**keyword** stringrequired **Possible values:**`<= 100 characters`

The search keyword

## Responses

- 200
- 401
- 403
- 404
- 500

Request is successful.

- application/json

- Schema
- Example (from schema)

**Schema

**

**data

** object

**hasNext** boolean Whether has more result

**nextCursor** string The start of next page

**total** integer The total number of matched spaces

**spaces

** object[]

- Array [
**fields

** object

**id** string The space ID

**title** string The space title

**description** string Description of the space

**icon** string Icon of the space

**pageCount** integer Number of pages contained within this space

**updatedTime** integer Updated time

**highlightFields

** object

**title** string[] Matched title

- ]

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

**errorData** object Error meta data for this request.

```json
{
  "data": {
    "hasNext": true,
    "nextCursor": "string",
    "total": 0,
    "spaces": [
      {
        "fields": {
          "id": "string",
          "title": "string",
          "description": "string",
          "icon": "string",
          "pageCount": 0,
          "updatedTime": 0
        },
        "highlightFields": {
          "title": [
            "string"
          ]
        }
      }
    ]
  },
  "result": "string",
  "errorCode": "string",
  "errorMsg": "string",
  "errorData": {}
}
```

Returned if the authentication credentials are incorrect or missing.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Unauthorized",
  "errorMsg": "Access token is invalid"
}
```

Returns if the scope check fails.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Forbidden",
  "errorMsg": "Scope is invalid"
}
```

Returned if the resource object was not found.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "NotFound",
  "errorMsg": "Not Found"
}
```

Internal Server Error.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Internal Server Error",
  "errorMsg": "Internal Server Error"
}
```
