# Upload a file to the issue

URL: https://docs.ones.cn/developer/openapi/api/02-upload-a-file-to-the-issue

```
POST
## /project/issues/:issueID/attachments

```

Upload a file to the issue.

警告
The attachment upload only supports local storage, and does not support methods such as Qiniu, S3, etc.

## History

| Version | Changes |
| --- | --- |
| v3.14.117, v3.15.26 | Added in: v3.14.117, v3.15.26 |

## Request

### Path Parameters

**issueID** stringrequired The issue ID

### Query Parameters

**teamID** stringrequired The team ID

- multipart/form-data

### Body

**required

**

**name** stringrequired **Possible values:**`<= 64 characters`

The name of file

**description** string **Possible values:**`<= 64 characters`

The description of file

**file** binaryrequired The file to upload

## Responses

- 200
- 401
- 403
- 404
- 500

Request is successful

- application/json

- Schema
- Example (from schema)

**Schema

**

**data

** object

The result of this request.

**id** string The file ID

**name** string The name of file

**hash** string The hash of file

**mime** string The mime of file

**sizeByte** integer The size of file with byte

**url** string The url of file

**version** integer The version of file

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

**errorData** object Error meta data for this request.

```json
[
  {
    "result": "SUCCESS",
    "data": {
      "id": "5f1b0a3b",
      "name": "1.png",
      "hash": "5f1b0a3b5b3b4e0001a3b3b4",
      "mime": "image/png",
      "sizeByte": 123456,
      "url": "https://xxx.com/1.png",
      "version": 1
    }
  }
]
```

Returned if the authentication credentials are incorrect or missing.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Unauthorized",
  "errorMsg": "Access token is invalid"
}
```

Returns if the scope check fails.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Forbidden",
  "errorMsg": "Scope is invalid"
}
```

Returned if the resource object was not found.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "NotFound",
  "errorMsg": "Not Found"
}
```

Internal Server Error.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Internal Server Error",
  "errorMsg": "Internal Server Error"
}
```
