# Create a space

URL: https://docs.ones.cn/developer/openapi/api/03-create-space

```
POST
## /wiki/spaces

```

## History

| Version | Changes |
| --- | --- |
| v7.21.0, v7.0.24, v6.100.35 | Added in: v7.21.0, v7.0.24, v6.100.35 |

Create a space and initialize its homepage, archive, recycle bin, notification settings, and default permissions. The caller must be allowed to create spaces and the team must have an available Wiki license.

## Request

### Query Parameters

**teamID** stringrequired The team ID

**requestUserID** string User ID, this parameter can only be passed when calling as an Oauth bot. It is used to perform operations as the specified user

- application/json

### Body

**required

**

**title** stringrequired **Possible values:**`non-empty` and `<= 64 characters`

Space name. Leading and trailing whitespace is removed; duplicate names are allowed.

**description** string **Possible values:**`<= 256 characters`

Space description

**categoryID** string A category in the current team. Omit it or pass an empty string to use the uncategorized category.

**icon** string **Possible values:**`<= 48 characters`

Space icon identifier

**isOpenShare** boolean Whether internal sharing is enabled

## Responses

- 200
- 401
- 403
- 404
- 500

Request is successful. Business errors use the standard Open API response body.

- application/json

- Schema
- Example (from schema)

**Schema

**

**data

** object

**id** string The space ID

**title** string The space name

**description** string The space description

**icon** string The space icon identifier

**homePageID** string The homepage ID

**createdTime** integer The createdTime of space

**updatedTime** integer The updatedTime of space

**creatorID** string The creator ID

**isOpenPublic** boolean Whether the space is allowed to share publicly

**isOpenShare** boolean Whether the space is allowed to share internally

**isPin** boolean Whether the space is pinned

**isOpenApproval** boolean Whether approval is enabled for the space

**unapprovedPageVisibleScope** integer Visibility scope for unapproved pages

**categoryID** string The category ID

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

**errorData** object Error meta data for this request.

```json
{
  "data": {
    "id": "string",
    "title": "string",
    "description": "string",
    "icon": "string",
    "homePageID": "string",
    "createdTime": 0,
    "updatedTime": 0,
    "creatorID": "string",
    "isOpenPublic": true,
    "isOpenShare": true,
    "isPin": true,
    "isOpenApproval": true,
    "unapprovedPageVisibleScope": 0,
    "categoryID": "string"
  },
  "result": "string",
  "errorCode": "string",
  "errorMsg": "string",
  "errorData": {}
}
```

Returned if the authentication credentials are incorrect or missing.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Unauthorized",
  "errorMsg": "Access token is invalid"
}
```

Returns if the scope check fails.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Forbidden",
  "errorMsg": "Scope is invalid"
}
```

Returned if the resource object was not found.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "NotFound",
  "errorMsg": "Not Found"
}
```

Internal Server Error.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Internal Server Error",
  "errorMsg": "Internal Server Error"
}
```
