# Export page

URL: https://docs.ones.cn/developer/openapi/api/03-export-page

```
GET
## /wiki/pages/:pageID/export

```

## History

| Version | Changes |
| --- | --- |
| v6.12.0 | Added in: v6.12.0 |

Export page.

Deprecated, please use [async method](https://docs.ones.cn/developer/openapi/api/convert/) .

## Request

### Path Parameters

**pageID** stringrequired The page ID

### Query Parameters

**teamID** stringrequired The team ID

**requestUserID** string User ID, this parameter can only be passed when calling as an Oauth bot. It is used to perform operations as the specified user

**format** stringrequired **Possible values:** [ `png` ]

The export format, different formats are supported for different types of pages. collaboration: png

**hideTitle** boolean Whether to hide the title, default: false.

**width** integer **Possible values:**`<= 2560`

**Default value:**`1280`

The width of the image, default: 1280, maximum: 2560.

**height** integer **Possible values:**`<= 1600`

**Default value:**`800`

The height of the image, default: 800, maximum: 1600.

## Responses

- 200
- 401
- 403
- 404
- 500

Request is successful.

- application/octet-stream

- Schema

**Schema

**

string

Returned if the authentication credentials are incorrect or missing.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Unauthorized",
  "errorMsg": "Access token is invalid"
}
```

Returns if the scope check fails.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Forbidden",
  "errorMsg": "Scope is invalid"
}
```

Returned if the resource object was not found.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "NotFound",
  "errorMsg": "Not Found"
}
```

Internal Server Error.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Internal Server Error",
  "errorMsg": "Internal Server Error"
}
```
