# Get a list of issue fields change log

URL: https://docs.ones.cn/developer/openapi/api/03-get-a-list-of-issue-field-change-log

```
GET
## /project/issueFields/changeLog

```

Get a list of issue fields change log

## History

| Version | Changes |
| --- | --- |
| v6.0.57 | Added in: v6.0.57 |

## Unsupported issue field type for query

| Issue field type |
| --- |
| Time of appearance |
| Interval time |
| Frequency in status |
| Time in status |
| Issue No. |

## Unsupported system issue field for query

| Issue field ID |
| --- |
| Creator |
| Time of creation |
| ID |
| Release progress |
| Working time progress |
| Deviation |
| Overall working time progress |
| Total Remaining Time |
| Total Logged Time |
| Total Estimated Time |
| Estimation Deviation |

## System issue field

| Issue field ID | Issue field type | Description |
| --- | --- | --- |
| field001 | text | Title |
| field002 | text | Description |
| field004 | user | Assigner |
| field005 | task_status | Issue status |
| field006 | project | Project |
| field007 | issue_type | Issue type |
| field008 | user_list | Watcher |
| field010 | integer | Updated time |
| field011 | sprint | Sprint |
| field012 | option | Priority |
| field013 | date | Due date |
| field018 | float | Time estimated |
| field019 | float | Time spent |
| field020 | float | Time remaining |
| field021 | issue_type | Sub issue type |
| field027 | date | Planned start date |
| field028 | date | Planned end date |
| field029 | product | Product（multi_option） |
| field030 | product_module | Product module（multi_option） |
| field031 | option | Found in production |
| field032 | float | Story point |
| field033 | float | Progress |
| field036 | date | Release date |
| field038 | option | Severity |
| field039 | option | Result |
| field040 | user | Solver |
| field041 | option | Bug type |

## System issue field type

| Issue field type | Enum | Type | Description |
| --- | --- | --- | --- |
| option | 1 | string | Option, the value is the currently selected option ID |
| text | 2 | string | Text |
| integer | 3 | int | Integer, value = actual value x 100000 |
| float | 4 | int | Float, value = floor(actual value x 100000), 5 decimal places |
| date | 5 | int | Date, UTC timestamp, in seconds |
| time | 6 | int | Time, UTC timestamp, in seconds |
| sprint | 7 | string | Sprint, the value is the sprint ID |
| user | 8 | string | Team member, the value is the user ID |
| project | 9 | string | Project, the value is the project ID |
| task | 10 | string | Work item, the value is the work item ID |
| issue_type | 11 | string | Issue type, the value is the issue type ID |
| task_status | 12 | string | Work item status, the value is the work item status ID |
| user_list | 13 | array | User list, the values are user IDs |
| multi_line_text | 15 | string | Multi-line text |
| multi_option | 16 | array | Multiple options, the values are the selected option IDs |
| publish_Version | 49 | array | Related releases, the values are release IDs |
| project_list | 50 | array | Multiple projects, the values are project IDs |
| department | 52 | array | Multiple departments, the values are department IDs |

## Request

### Query Parameters

**teamID** stringrequired The team ID

**limit** integer **Possible values:**`<= 100`

**Default value:**`50`

The number returned by this request.The default value is 50, exceeding 100 will be truncated to 100

**cursor** string The starting location of this request

**issueFieldID** stringrequired The issue field ID.

**startTime** integerrequired start time(format as timestamp in seconds),the maximum span between the start time and the end time must not exceed 1 day.

**endTime** integerrequired end time(format as timestamp in seconds),the maximum span between the start time and the end time must not exceed 1 day.

**issueID** string issue ID.

**projectID** string project ID.

**operatorID** string operator ID.

## Responses

- 200
- 401
- 403
- 404
- 500

Request is successful.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** stringrequired The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

**data

** object

Data object containing a list of items and page information.

**list

** object[]

- Array [
**id** string ID of the change log

**issueID** string ID of the issue

**projectID** string ID of the project

**operatorID** string ID of the operator

**changeTime** integer timestamp of the change

**changeOperation** string operation of the change

**changeData** object data of the change

- ]

**pageInfo

** object

Page information.

**count** integer The number returned this time.

**endCursor** string The last cursor on this page is generally used to turn pages.

**hasNextPage** boolean Is there a next page.

**startCursor** string The first cursor on this page is generally used to turn pages.

**totalCount** integer The total number of items available in the entire collection, including those that are returned in the current response.

```json
[
  {
    "result": "SUCCESS",
    "data": {
      "list": [
        {
          "id": "V58fiLH4",
          "issueID": "9BUysSgAWenQfXuv",
          "projectID": "9BUysSgAljY6C7IG",
          "operatorID": "9BUysSgA",
          "changeTime": 1715236973,
          "changeOperations": "add",
          "changeData": {
            "field_uuid": "field008",
            "field_name": "watchers",
            "field_type": 13,
            "old_value": "",
            "new_value": "TJqiD68t"
          }
        }
      ],
      "pageInfo": {
        "count": 1,
        "endCursor": "1",
        "hasNextPage": false,
        "startCursor": "0",
        "totalCount": 1
      }
    }
  }
]
```

Returned if the authentication credentials are incorrect or missing.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Unauthorized",
  "errorMsg": "Access token is invalid"
}
```

Returns if the scope check fails.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Forbidden",
  "errorMsg": "Scope is invalid"
}
```

Returned if the resource object was not found.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "NotFound",
  "errorMsg": "Not Found"
}
```

Internal Server Error.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Internal Server Error",
  "errorMsg": "Internal Server Error"
}
```
