# Get a list of issues worklog in simple mode

URL: https://docs.ones.cn/developer/openapi/api/03-get-a-list-of-issues-worklog

```
GET
## /project/issues/:issueID/workLog/simple/timesSpent

```

Get a list of issues worklog in simple mode.

## History

| Version | Changes |
| --- | --- |
| v3.14.117, v3.15.26 | Added in: v3.14.117, v3.15.26 |

## Request

### Path Parameters

**issueID** stringrequired The issue ID.

### Query Parameters

**teamID** stringrequired The team ID

**limit** integer **Possible values:**`<= 100`

**Default value:**`50`

The number returned by this request.The default value is 50, exceeding 100 will be truncated to 100

**cursor** string The starting location of this request

## Responses

- 200
- 401
- 403
- 404
- 500

Request is successful.

- application/json

- Schema
- Example (from schema)

**Schema

**

**data

** object

The result of this request.

**list

** object[]

List of items.

- Array [
**id** string Worklog id

**description** string Worklog description

**hours** integer Worklog hours,unit is hour

**owner

** object

**id** string Times spent owner id

**name** string Times spent owner name

**startTime** integer Worklog start time

- ]

**pageInfo

** object

Page information.

**count** integer The number returned this time.

**endCursor** string The last cursor on this page is generally used to turn pages.

**hasNextPage** boolean Is there a next page.

**startCursor** string The first cursor on this page is generally used to turn pages.

**totalCount** integer The total number of items available in the entire collection, including those that are returned in the current response.

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

**errorData** object Error meta data for this request.

```json
[
  {
    "result": "SUCCESS",
    "data": {
      "list": [
        {
          "id": "yuhbf780",
          "description": "Sample Description 1",
          "hours": 1,
          "owner": {
            "id": "hgbko876",
            "name": "xx"
          },
          "startTime": 1689055200
        },
        {
          "id": "yuhbf781",
          "description": "Sample Description 2",
          "hours": 2,
          "owner": {
            "id": "hgbko877",
            "name": "yy"
          },
          "startTime": 1689055300
        }
      ],
      "pageInfo": {
        "count": 2,
        "endCursor": "adsgfa8hsd0hdf",
        "hasNextPage": false,
        "startCursor": "dsoijioew09ewqkjb",
        "totalCount": 2
      }
    }
  },
  {
    "result": "FAIL",
    "errorCode": "Forbidden",
    "errorMsg": "Unable to times estimated in simple mode"
  },
  {
    "result": "FAIL",
    "errorCode": "MissingParameter",
    "errorMsg": "MissingParameter teamID"
  },
  {
    "result": "FAIL",
    "errorCode": "NotFound",
    "errorMsg": "NotFound Issue"
  },
  {
    "result": "FAIL",
    "errorCode": "AccessDenied",
    "errorMsg": "AccessDenied Issue"
  },
  {
    "result": "FAIL",
    "errorCode": "Internal Server Error",
    "errorMsg": "Internal Server Error"
  },
  {
    "result": "FAIL",
    "errorCode": "PermissionDenied",
    "errorMsg": "PermissionDenied super_administrator"
  },
  {
    "result": "FAIL",
    "errorCode": "InvalidParameter",
    "errorMsg": "InvalidParameter limit InvalidType"
  }
]
```

Returned if the authentication credentials are incorrect or missing.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Unauthorized",
  "errorMsg": "Access token is invalid"
}
```

Returns if the scope check fails.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Forbidden",
  "errorMsg": "Scope is invalid"
}
```

Returned if the resource object was not found.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "NotFound",
  "errorMsg": "Not Found"
}
```

Internal Server Error.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Internal Server Error",
  "errorMsg": "Internal Server Error"
}
```
