# Get project detail by project ID

URL: https://docs.ones.cn/developer/openapi/api/03-get-project-detail-by-project-id

```
GET
## /project/projects/:projectID

```

Get project detail by project ID.

## History

| Version | Changes |
| --- | --- |
| v3.14.117, v3.15.26 | Added in: v3.14.117, v3.15.26 |

## Request

### Path Parameters

**projectID** stringrequired The project ID

### Query Parameters

**teamID** stringrequired The team ID

## Responses

- 200
- 401
- 403
- 404
- 500

Request is successful.

- application/json

- Schema
- Example (from schema)

**Schema

**

**data

** object

**id** string The project ID

**name** string The project Name

**createTime** integer The createTime of project

**owner

** object

**id** string The project owner ID

**name** string The project owner name

**creator

** object

**id** string The project creator ID

**name** string The project creator name

**status

** object

**id** string The ID of project status

**name** string The name of project status

**category** string The category of project status

**statusCategory** string The category of project status

**stickToTop** boolean Whether the project is at the top

**isArchive** boolean Archived project or not

**archiveUser

** object

**id** string The ID of people who archived project

**name** string The name of people who archived project

**archiveTime** integer Time when the project was archived

**plannedStartDate** string The date of project planned to start,sample as 2023-05-06

**plannedEndDate** string The date of project planned to end,sample as 2023-05-06

**customField

** object

Project custom field

**property name*

** object

oneOf

- MOD1
- MOD2
- MOD3

String type custom field value (single line, multi-line text)

string

Number type custom field value (time, date, integer, float, etc.)

number

Object type custom field value (single selection, multi-selection)

object

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

**errorData** object Error meta data for this request.

```json
[
  {
    "result": "SUCCESS",
    "data": {
      "id": "5f1b0b5b",
      "name": "project1",
      "createTime": 1691726809,
      "owner": {
        "id": "1b2b2b29",
        "name": "owner"
      },
      "creator": {
        "id": "1b2b2b29",
        "name": "creator"
      },
      "status": {
        "id": "to_do",
        "name": "To Do",
        "category": "to_do"
      },
      "statusCategory": "to_do",
      "stickToTop": false,
      "isArchive": false,
      "archiveUser": {
        "id": "5h2b2b29",
        "name": "archiveUser"
      },
      "archiveTime": 1691726809,
      "plannedStartDate": "2023-01-01",
      "plannedEndDate": "2023-01-31"
    }
  }
]
```

Returned if the authentication credentials are incorrect or missing.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Unauthorized",
  "errorMsg": "Access token is invalid"
}
```

Returns if the scope check fails.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Forbidden",
  "errorMsg": "Scope is invalid"
}
```

Returned if the resource object was not found.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "NotFound",
  "errorMsg": "Not Found"
}
```

Internal Server Error.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Internal Server Error",
  "errorMsg": "Internal Server Error"
}
```
