# Create page

URL: https://docs.ones.cn/developer/openapi/api/04-create-page

```
POST
## /wiki/pages

```

## History

| Version | Changes |
| --- | --- |
| v6.12.0 | Added in: v6.12.0 |

Create page.

| Page Type | content | cards | attachments | resources | attachmentOrResourceFileUUID |
| --- | --- | --- | --- | --- | --- |
| collaboration | Yes. The content is collaboration. json(Reference: **[Document Data Structure](https://docs.ones.cn/developer/abilities/knowledge/wiki/wiz-editor/doc-json/)** ) | Yes | Yes | Yes | Yes |

Sample curl request:

```curl
curl --location --request POST 'https://your-domain/openapi/v2/wiki/pages?teamID=<teamID>' \
--header 'Authorization: Bearer <TOKEN>' \
--form 'parentPageID="<ParentPageID>"' \
--form 'title="open api from form-data"' \
--form 'attachments="[\"attachmentRandomId\"]"' \
--form 'attachmentRandomId=@"your-attachment-file"' \
--form 'resources="[\"resourceRandomId\"]"' \
--form 'resourceRandomId=@"your-resource-file"' \
--form 'cards="[{\"type\": \"attachment\", \"config\": [\"attachmentRandomId\"], \"id\": \"cardRandomId\"}]"' \
--form 'content="{
  \"blocks\": [
    {
      \"id\": \"fkpFQHTFP\",
      \"type\": \"text\",
      \"text\": [
        {
          \"insert\": \"open api from form-data\"
        }
      ],
      \"heading\": 1,
      \"quoted\": false
    },
    {
      \"id\": \"zrzebX_5P\",
      \"type\": \"text\",
      \"text\": [
        {
          \"insert\": \"Resource\"
        }
      ],
      \"heading\": 2
    },
    {
      \"id\": \"bBb4SGK_9\",
      \"type\": \"text\",
      \"text\": [
        {
          \"insert\": \"The src in embedData is the resource random ID. The key of the uploaded file is the same as this ID, and the value is the specific resource file.\"
        }
      ]
    },
    {
      \"id\": \"Nckftr1QB\",
      \"type\": \"embed\",
      \"embedType\": \"image\",
      \"align\": \"left\",
      \"embedData\": {
        \"src\": \"resourceRandomId\",
        \"widthPercent\": 41.83070866141732,
        \"8c8d4fa06483a35dffa314ec88fad792_width\": 425,
        \"8c8d4fa06483a35dffa314ec88fad792_height\": 307,
        \"0_flex\": 1
      }
    },
    {
      \"id\": \"hYtCamqSj\",
      \"type\": \"text\",
      \"text\": [
        {
          \"insert\": \"Attachment Card\"
        }
      ],
      \"heading\": 2
    },
    {
      \"id\": \"DWkP4GVAF\",
      \"type\": \"text\",
      \"text\": [
        {
          \"insert\": \"The cardUuid in embedData is the card random ID. The ID in the cards list is the same as this ID. Which cards are included in the card is also determined by the attachments in the cards list. The ID in the attachments list is the attachment random ID. The key in the uploaded file is the same as this ID, and the value is the specific attachment file.\"
        }
      ]
    },
    {
      \"id\": \"fadFDWnZY\",
      \"type\": \"embed\",
      \"embedType\": \"file-list\",
      \"embedData\": {
        \"cardUuid\": \"cardRandomId\"
      }
    },
    {
      \"id\": \"PNWe0PcC7\",
      \"type\": \"text\",
      \"text\": []
    }
  ],
  \"comments\": {},
  \"meta\": {}
}"'
```

## Request

- multipart/form-data

### Body

**required

**

**parentPageID** string (Required.) The parent page ID

**title** string (Required.) The page title

**content** string The content of page. Collaboration page JSON with the structure `{"blocks": [...], "comments": {}, "meta": {}}` (Reference: **[Document Data Structure](https://docs.ones.cn/developer/abilities/knowledge/wiki/wiz-editor/doc-json/)** )

**cards

** object[]

The card list

- Array [
**id** string The card ID

**type** string **Possible values:** [ `attachments` ]

The card type

**config

** object

The card configuration

oneOf

- MOD1

**attachments** uuid[] The attachment ID list

- ]

**attachments** uuid[] The attachment ID list

**resources** uuid[] The resource ID list

**attachmentOrResourceFileUUID** binary The key is not a fixed value. It is the ID of the resource or attachment, and the value is the file.

## Responses

- 200
- 401
- 403
- 404
- 500

Request is successful.

- application/json

- Schema
- Example (from schema)

**Schema

**

**id** string The page ID

**title** string The page title

**spaceID** string The space ID

**createdTime** integer The createdTime of page

**updatedTime** integer The updatedTime of page

**parentID** string The parent page ID

**refType** string The reference type

**refID** string The reference ID

**subRefType** string The sub reference type

**isArchived** boolean Whether the page is archived

**encryptStatus** string Encrypt status, none: not encrypted, encrypted: encrypted, readonly: readonly

**canEdit** boolean Whether the page is editable

**locked** boolean Whether the page is locked

```json
{
  "id": "string",
  "title": "string",
  "spaceID": "string",
  "createdTime": 0,
  "updatedTime": 0,
  "parentID": "string",
  "refType": "string",
  "refID": "string",
  "subRefType": "string",
  "isArchived": true,
  "encryptStatus": "string",
  "canEdit": true,
  "locked": true
}
```

Returned if the authentication credentials are incorrect or missing.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Unauthorized",
  "errorMsg": "Access token is invalid"
}
```

Returns if the scope check fails.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Forbidden",
  "errorMsg": "Scope is invalid"
}
```

Returned if the resource object was not found.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "NotFound",
  "errorMsg": "Not Found"
}
```

Internal Server Error.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Internal Server Error",
  "errorMsg": "Internal Server Error"
}
```
