# Get a list of issues worklog in summary mode

URL: https://docs.ones.cn/developer/openapi/api/04-get-a-list-of-issues-worklog

```
GET
## /project/issues/:issueID/workLog/summary/timesSpent

```

Get a list of issues worklog in summary mode.

## History

| Version | Changes |
| --- | --- |
| v6.0.44 | Added in: v6.0.44 |

## Request

### Path Parameters

**issueID** stringrequired The issue ID.

### Query Parameters

**teamID** stringrequired The team ID

**limit** integer **Possible values:**`<= 100`

**Default value:**`50`

The number returned by this request.The default value is 50, exceeding 100 will be truncated to 100

**cursor** string The starting location of this request

## Responses

- 200
- 401
- 403
- 404
- 500

Request is successful.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**data

** object

The result of this request.

**list

** object[]

The list of worklog.

- Array [
**description** string The description of spent time.

**id** string The timesSpent ID.

**hours** integer The spent time.

**startTime** integer The start time of spent time.

**startDate** string The start time of estimated time.

**owner

** object

The owner of spent time.

**id** string The owner ID.

**name** string The owner name.

**workLogRecordType** string **Possible values:** [ `timesEstimated` , `timesSpent` ]

- timesEstimated: timesEstimated
- timesSpent: timesSpent

- ]

**pageInfo

** object

Page information.

**count** integer The number returned this time.

**endCursor** string The last cursor on this page is generally used to turn pages.

**hasNextPage** boolean Is there a next page.

**startCursor** string The first cursor on this page is generally used to turn pages.

**totalCount** integer The total number of items available in the entire collection, including those that are returned in the current response.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
[
  {
    "result": "SUCCESS",
    "data": {
      "list": [
        {
          "description": "Sample Description",
          "id": "kkoi976k",
          "hours": 1,
          "startTime": 1714960800,
          "owner": {
            "id": "juyhntgb",
            "name": "test"
          },
          "workLogRecordType": "timesSpent"
        },
        {
          "description": "Sample Description",
          "id": "kkoi9769",
          "hours": 1,
          "startDate": "2024-01-01",
          "owner": {
            "id": "juyhntgb",
            "name": "test"
          },
          "workLogRecordType": "timesEstimated"
        }
      ],
      "pageInfo": {
        "count": 2,
        "endCursor": "sample_end_cursor",
        "hasNextPage": false,
        "startCursor": "sample_start_cursor",
        "totalCount": 2
      }
    }
  }
]
```

Returned if the authentication credentials are incorrect or missing.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Unauthorized",
  "errorMsg": "Access token is invalid"
}
```

Returns if the scope check fails.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Forbidden",
  "errorMsg": "Scope is invalid"
}
```

Returned if the resource object was not found.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "NotFound",
  "errorMsg": "Not Found"
}
```

Internal Server Error.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Internal Server Error",
  "errorMsg": "Internal Server Error"
}
```
