# Grant app authorization to users

URL: https://docs.ones.cn/developer/openapi/api/04-grant-user-apps

```
POST
## /appcenter/organization/:organizationUUID/users/grantedApps/grant

```

Grant app authorization to multiple users (requires organizational administrator permissions)

## History

| Version | Changes |
| --- | --- |
| v6.94.? | Added in: v6.94.? |

## Request

### Path Parameters

**organizationUUID** stringrequired Organization UUID

- application/json

### Body

**userUUIDs** string[]required List of user UUIDs

**appTypes** string[]required List of app types to grant

## Responses

- 200
- 401
- 403
- 404
- 500

Request successful

- application/json

- Schema
- Example (from schema)

**Schema

**

**data

** object

**results

** object[]

- Array [
**userUUID** string User UUID

**succeedTypes** string[] App types that were successfully granted

**failedTypes** string[] App types that failed to be granted

- ]

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

**errorData** object Error meta data for this request.

```json
{
  "data": {
    "results": [
      {
        "userUUID": "8uTsbGxd",
        "succeedTypes": [
          "copilot",
          "testcase"
        ],
        "failedTypes": []
      }
    ]
  },
  "result": "string",
  "errorCode": "string",
  "errorMsg": "string",
  "errorData": {}
}
```

Returned if the authentication credentials are incorrect or missing.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Unauthorized",
  "errorMsg": "Access token is invalid"
}
```

Returns if the scope check fails.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Forbidden",
  "errorMsg": "Scope is invalid"
}
```

Returned if the resource object was not found.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "NotFound",
  "errorMsg": "Not Found"
}
```

Internal Server Error.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Internal Server Error",
  "errorMsg": "Internal Server Error"
}
```
