# Delete a space

URL: https://docs.ones.cn/developer/openapi/api/05-delete-space

```
DELETE
## /wiki/spaces/:spaceID

```

## History

| Version | Changes |
| --- | --- |
| v7.21.0, v7.0.24, v6.100.35 | Added in: v7.21.0, v7.0.24, v6.100.35 |

Delete the space and invalidate its pages, drafts, sharing and publishing settings, project relationships, and permission rules. Repeating a successful deletion returns the standard resource-not-found business error.

## Request

### Path Parameters

**spaceID** stringrequired The space ID

### Query Parameters

**teamID** stringrequired The team ID

**requestUserID** string User ID, this parameter can only be passed when calling as an Oauth bot. It is used to perform operations as the specified user

## Responses

- 200
- 401
- 403
- 404
- 500

Request is successful and returns the standard success response without data.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string

```json
{
  "result": "SUCCESS"
}
```

Returned if the authentication credentials are incorrect or missing.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Unauthorized",
  "errorMsg": "Access token is invalid"
}
```

Returns if the scope check fails.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Forbidden",
  "errorMsg": "Scope is invalid"
}
```

Returned if the resource object was not found.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "NotFound",
  "errorMsg": "Not Found"
}
```

Internal Server Error.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Internal Server Error",
  "errorMsg": "Internal Server Error"
}
```
