# Get page history versions

URL: https://docs.ones.cn/developer/openapi/api/06-get-page-versions

```
GET
## /wiki/pages/:pageID/versions

```

## History

| Version | Changes |
| --- | --- |
| v6.15.0 | Added in: v6.15.0 |

Get page history versions order by version desc.

## Request

### Path Parameters

**pageID** stringrequired The page ID

### Query Parameters

**teamID** stringrequired The team ID

**requestUserID** string User ID, this parameter can only be passed when calling as an Oauth bot. It is used to perform operations as the specified user

**start** integerrequired The start index

**limit** integerrequired **Possible values:**`<= 200`

The limit of the list

## Responses

- 200
- 401
- 403
- 404
- 500

Request is successful.

- application/json

- Schema
- Example (from schema)

**Schema

**

**data

** object

**start** integer The start index

**count** integer The number of versions in the list

**total** integer The total number of versions

**versions

** object[]

- Array [
**version** integer The version number

**createdTime** integer The created time of version

**creatorID** string The creator of version

**remark** string The remark of version

- ]

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

**errorData** object Error meta data for this request.

```json
{
  "data": {
    "start": 0,
    "count": 0,
    "total": 0,
    "versions": [
      {
        "version": 0,
        "createdTime": 0,
        "creatorID": "string",
        "remark": "string"
      }
    ]
  },
  "result": "string",
  "errorCode": "string",
  "errorMsg": "string",
  "errorData": {}
}
```

Returned if the authentication credentials are incorrect or missing.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Unauthorized",
  "errorMsg": "Access token is invalid"
}
```

Returns if the scope check fails.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Forbidden",
  "errorMsg": "Scope is invalid"
}
```

Returned if the resource object was not found.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "NotFound",
  "errorMsg": "Not Found"
}
```

Internal Server Error.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Internal Server Error",
  "errorMsg": "Internal Server Error"
}
```
