# Create a sprint in the project

URL: https://docs.ones.cn/developer/openapi/api/07-create-project-sprint

```
POST
## /project/projects/:projectID/sprints

```

Create a single sprint in the project. Only basic sprint fields and custom field values are accepted. Stage transition fields are not supported.

## History

| Version | Changes |
| --- | --- |
| v7.14.0, v7.0.16, v6.100.29 | Added in: v7.14.0, v7.0.16, v6.100.29 |

## Request

### Path Parameters

**projectID** stringrequired The project ID

### Query Parameters

**teamID** stringrequired The team ID

- application/json

### Body

**required

** Create sprint request param.

**name** string The sprint name

**description** string The sprint description

**assignee** string The sprint assignee user ID

**goal** string The sprint goal

**period** string The sprint period rule

**startDate** string The sprint start date in YYYY-MM-DD format

**endDate** string The sprint end date in YYYY-MM-DD format

**fieldValues

** object[]

- Array [
**fieldID** stringrequired The sprint field ID

**value

** object

The sprint field value

oneOf

- MOD1
- MOD2
- MOD3
- MOD4
- MOD5

string

number

integer

boolean

object

- ]

## Responses

- 200
- 401
- 403
- 404
- 500

Request is successful.

- application/json

- Schema
- Example (from schema)

**Schema

**

**data

** object

**id** string The sprint ID

**name** string The sprint name

**description** string The sprint description

**project

** object

**id** string The project ID

**name** string The project name

**assignee

** object

nullable

**id** string The user ID

**name** string The user name

**goal** string The sprint goal

**period** string The sprint period rule

**startDate** string The sprint start date

**endDate** string The sprint end date

**createdAt** integer The sprint create time in Unix seconds

**currentStage

** object

nullable

**id** string The stage ID

**name** string The stage name

**fieldValues

** object[]

- Array [
**fieldID** string The field ID

**name** string The field name

**type** string The field type

**value

** object

The field value

oneOf

- MOD1
- MOD2
- MOD3
- MOD4
- SprintEntityValue

string

number

integer

boolean

**id** string The entity ID

**name** string The entity name

- ]

**stages

** object[]

- Array [
**id** string The stage ID

**name** string The stage name

**isCurrent** boolean Whether this stage is current

**planStartDate** string The planned stage start date

**planEndDate** string The planned stage end date

**actualStartDate** string The actual stage start date

**actualEndDate** string The actual stage end date

**description** string The stage description

- ]

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

**errorData** object Error meta data for this request.

```json
{
  "result": "SUCCESS",
  "data": {
    "id": "spr_xxx",
    "name": "OpenAPI 2026W23",
    "description": "Sync with external planning",
    "project": {
      "id": "proj_xxx",
      "name": "Open Platform"
    },
    "assignee": {
      "id": "u_xxx",
      "name": "Zhang San"
    },
    "goal": "Complete sprint open API support",
    "period": "2w",
    "startDate": "2026-06-02",
    "endDate": "2026-06-15",
    "createdAt": 1780383130,
    "currentStage": {
      "id": "stage_doing",
      "name": "In Progress"
    },
    "fieldValues": [],
    "stages": []
  }
}
```

Returned if the authentication credentials are incorrect or missing.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Unauthorized",
  "errorMsg": "Access token is invalid"
}
```

Returns if the scope check fails.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Forbidden",
  "errorMsg": "Scope is invalid"
}
```

Returned if the resource object was not found.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "NotFound",
  "errorMsg": "Not Found"
}
```

Internal Server Error.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Internal Server Error",
  "errorMsg": "Internal Server Error"
}
```
