# Get a spent times in simple mode

URL: https://docs.ones.cn/developer/openapi/api/07-get-spent-time-of-issues

```
GET
## /project/issues/:issueID/workLog/simple/timesSpent/:timesSpentID

```

Get a spent times in simple mode.

## History

| Version | Changes |
| --- | --- |
| v3.14.117, v3.15.26 | Added in: v3.14.117, v3.15.26 |

## Request

### Path Parameters

**issueID** stringrequired The issue ID.

**timesSpentID** stringrequired The timesSpent ID.

### Query Parameters

**teamID** stringrequired The team ID

## Responses

- 200
- 401
- 403
- 404
- 500

Request is successful.

- application/json

- Schema
- Example (from schema)

**Schema

**

**data

** object

The result of this request.

**id** string The id of spent time.

**hours** float **Possible values:** Value must match regular expression `^\d+(\.\d{1,5})?$`

The spent time,unit is hour.

**description** string The description of spent time.

**startTime** integer The start time of spent time,Format: 1691043051

**owner

** object

The owner of spent time.

**id** string The id of spent time.

**name** string The name of spent time.

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

**errorData** object Error meta data for this request.

```json
[
  {
    "result": "SUCCESS",
    "data": {
      "hours": 1,
      "description": "Sample Description",
      "startTime": 1689055200,
      "owner": "UWQR89ji",
      "id": "kkoi976k"
    }
  },
  {
    "result": "FAIL",
    "errorCode": "Forbidden",
    "errorMsg": "Unable to times estimated in summary mode"
  },
  {
    "result": "FAIL",
    "errorCode": "MissingParameter",
    "errorMsg": "MissingParameter teamID"
  },
  {
    "result": "FAIL",
    "errorCode": "InvalidParameter",
    "errorMsg": "InvalidParameter IssueWorkLog Hours Empty"
  },
  {
    "result": "FAIL",
    "errorCode": "InvalidParameter",
    "errorMsg": "InvalidParameter IssueWorkLog Hours TooLong"
  },
  {
    "result": "FAIL",
    "errorCode": "NotFound",
    "errorMsg": "NotFound Issue"
  },
  {
    "result": "FAIL",
    "errorCode": "NotFound",
    "errorMsg": "NotFound timesSpentID"
  },
  {
    "result": "FAIL",
    "errorCode": "NotFound",
    "errorMsg": "NotFound Container"
  },
  {
    "result": "FAIL",
    "errorCode": "AccessDenied",
    "errorMsg": "AccessDenied Issue"
  },
  {
    "result": "FAIL",
    "errorCode": "Internal Server Error",
    "errorMsg": "Internal Server Error"
  },
  {
    "result": "FAIL",
    "errorCode": "PermissionDenied",
    "errorMsg": "PermissionDenied super_administrator"
  }
]
```

Returned if the authentication credentials are incorrect or missing.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Unauthorized",
  "errorMsg": "Access token is invalid"
}
```

Returns if the scope check fails.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Forbidden",
  "errorMsg": "Scope is invalid"
}
```

Returned if the resource object was not found.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "NotFound",
  "errorMsg": "Not Found"
}
```

Internal Server Error.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Internal Server Error",
  "errorMsg": "Internal Server Error"
}
```
