# Delete a sprint in the project

URL: https://docs.ones.cn/developer/openapi/api/10-delete-project-sprint

```
DELETE
## /project/projects/:projectID/sprints/:sprintID

```

Delete a single sprint in the project. Related work items are not deleted; only their sprint association is removed.

## History

| Version | Changes |
| --- | --- |
| v7.14.0, v7.0.16, v6.100.29 | Added in: v7.14.0, v7.0.16, v6.100.29 |

## Request

### Path Parameters

**projectID** stringrequired The project ID

**sprintID** stringrequired The sprint ID

### Query Parameters

**teamID** stringrequired The team ID

## Responses

- 200
- 401
- 403
- 404
- 500

Request is successful.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

**errorData** object Error meta data for this request.

```json
[
  {
    "result": "SUCCESS"
  },
  {
    "result": "FAIL",
    "errorCode": "PermissionDenied",
    "errorMsg": "PermissionDenied administer_do"
  }
]
```

Returned if the authentication credentials are incorrect or missing.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Unauthorized",
  "errorMsg": "Access token is invalid"
}
```

Returns if the scope check fails.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Forbidden",
  "errorMsg": "Scope is invalid"
}
```

Returned if the resource object was not found.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "NotFound",
  "errorMsg": "Not Found"
}
```

Internal Server Error.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Internal Server Error",
  "errorMsg": "Internal Server Error"
}
```