# Update page

URL: https://docs.ones.cn/developer/openapi/api/10-update-page

```
POST
## /wiki/pages/:pageID

```

Update page.

## `content` rules

For collaboration pages whose `refType` is `collaboration` :

- The `content` field in the request body is a string, but its value must be JSON that conforms to the Wiz collaboration document structure. Do not pass plain text directly.
- The top-level document structure must contain at least `blocks` , `comments` , and `meta` , for example `{"blocks": [...], "comments": {}, "meta": {}}` . See **[Document Data Structure](https://docs.ones.cn/developer/abilities/knowledge/wiki/wiz-editor/doc-json/)** for detailed Block and container rules.
- When updating an existing page, get the page details first, parse the returned `content` , modify the existing document object, and then serialize it again. This avoids losing unchanged data such as table cells, code block containers, and comments.
- Before calling this API, serialize the document object to a string and use that string as the `content` field in the request body.
Request body example:

```json
{
  "content": "{\"blocks\":[{\"id\":\"A12345678\",\"type\":\"text\",\"text\":[{\"insert\":\"Updated content\"}]}],\"comments\":{},\"meta\":{}}"
}
```

If `content` includes resources, attachments, or cards, call related APIs first and then write returned IDs or card info into `content` before updating.

Recommended sequence:

1. Upload resources by `POST /wiki/pages/{pageID}/resources` .
2. Upload attachments by `POST /wiki/pages/{pageID}/attachments` .
3. Create cards by `POST /wiki/pages/{pageID}/cards` if needed.
4. Call this API with final `content` .

## Request

### Path Parameters

**pageID** stringrequired The page ID

### Query Parameters

**teamID** stringrequired The team ID

**requestUserID** string User ID, this parameter can only be passed when calling as an Oauth bot. It is used to perform operations as the specified user

- application/json

### Body

**required

** At least one of title or content must be provided; they cannot both be empty.

**title** string The page title

**content** string The page content. For collaboration pages, this must be a JSON string that conforms to the Wiz collaboration document structure, not plain text. The top-level document structure must contain at least `blocks` , `comments` , and `meta` . See **[Document Data Structure](https://docs.ones.cn/developer/abilities/knowledge/wiki/wiz-editor/doc-json/)** for details.

## Responses

- 200
- 401
- 403
- 404
- 500

Request is successful.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

**errorData** object Error meta data for this request.

```json
{
  "result": "string",
  "errorCode": "string",
  "errorMsg": "string",
  "errorData": {}
}
```

Returned if the authentication credentials are incorrect or missing.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Unauthorized",
  "errorMsg": "Access token is invalid"
}
```

Returns if the scope check fails.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Forbidden",
  "errorMsg": "Scope is invalid"
}
```

Returned if the resource object was not found.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "NotFound",
  "errorMsg": "Not Found"
}
```

Internal Server Error.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Internal Server Error",
  "errorMsg": "Internal Server Error"
}
```
