# Apply for authorization code

URL: https://docs.ones.cn/developer/openapi/api/apply-for-authorization-code

```
GET
## /oauth2/authorize

```

Apply for authorization code.

## History

| Version | Changes |
| --- | --- |
| v3.14.117, v3.15.26 | Added in: v3.14.117, v3.15.26 |

## Request

### Query Parameters

**client_id** stringrequired Client ID obtained from creating an OAuth application.

**response_type** stringrequired Fixed value:code.

**redirect_uri** string The Redirect URI configured when creating the OAuth application, to which the user will be redirected with the authorization code after granting consent.

**scope** string A comma-separated list of scopes, which must be a subset of the scopes configured when creating the OAuth application. By default, the scopes configured when creating the OAuth application are used.

**state** string A random string that the client uses to maintain state between the request and callback, which will ultimately be returned as is.

## Responses

- 302
- 400
- 401
- 500

Redirect to the Redirect URI, and add the code and state parameters to the URL parameters.

Invalid request.

- application/json

- Schema
- Example (from schema)

**Schema

**

**error** string The error message for the current request.

**error_description** string The detailed error information for the current request.

**code** integer HTTP status code of the current response.

**errcode** integer Error code of the current response.

**type** string Error type of the current response.

**model** string Error module of the current response.

**field** string Error project of the current response.

**reason** string Error reason of the current response.

```json
{
  "error": "string",
  "error_description": "string",
  "code": 0,
  "errcode": 0,
  "type": "string",
  "model": "string",
  "field": "string",
  "reason": "string"
}
```

If the authorization type is incorrect, then return.

- application/json

- Schema
- Example (from schema)

**Schema

**

**error** string The error message for the current request.

**error_description** string The detailed error information for the current request.

**code** integer HTTP status code of the current response.

**errcode** integer Error code of the current response.

**type** string Error type of the current response.

**model** string Error module of the current response.

**field** string Error project of the current response.

**reason** string Error reason of the current response.

```json
{
  "error": "string",
  "error_description": "string",
  "code": 0,
  "errcode": 0,
  "type": "string",
  "model": "string",
  "field": "string",
  "reason": "string"
}
```

Internal server error.

- application/json

- Schema
- Example (from schema)

**Schema

**

**error** string The error message for the current request.

**error_description** string The detailed error information for the current request.

**code** integer HTTP status code of the current response.

**errcode** integer Error code of the current response.

**type** string Error type of the current response.

**model** string Error module of the current response.

**field** string Error project of the current response.

**reason** string Error reason of the current response.

```json
{
  "error": "string",
  "error_description": "string",
  "code": 0,
  "errcode": 0,
  "type": "string",
  "model": "string",
  "field": "string",
  "reason": "string"
}
```
